Text
m.s.
,a I
if ~
s i(,'
+
gc 7p/DA/RYLAND
.l
[8//W[h COO _PERATNE. PLo coxsi7.* 2615 EAST AVE SO D A CROSSE. WISCONSIN S4602-0817:
L
-(coa) 788 4000 <
l
'~
- JAMES WHAYLOR General Manager Aovember'S, 1987 g
In reply,~please.
- refer to LAC-12426 q
l DOCKET NO. 50a409 1, '
i Document Control Desk
.j U. S.l Nuclear Rt.gulatory Commission
's Washington, DC -20555 v
Gentlemen l
1
\\.
l-
SUBJECT:
DAIRYLAND, POWER COOPERATIVE l
LA CROSSE BOILING WATER REACTOR (LACBWR)
I PROVISIONAL OPERATING LICENSE NO. DPR-45 l
MISCELLANEOUS TESTS
References:
(1) DPC Letter, Taylor to Document Control Desk.
LAC-12234, dated May 22, 1987.
1 (2) NRC Letter, Berkow to Taylor,.
j dated August 4. 1987.
I l
(3) DPC Letter, Taylor to Document' Control Desk,-
E
' LAC-12381, September 29, 1987.
l l
l On April 30, 1987, the La Crosse Boiling Water Reactor was permanently
.i shut down. Reactor defueling was completed June 11,fl987..Dairyland-Power Cooperative applied for a possession-only license amendment in Reference l'.
J In Reference 2, the NRC' issued the possession-only license amendment.
1 Due to the shutdown, a review of surveillance testing was, conducted. The.
f majority of testing no longer required by Technical Specifications has.been-terminated. ; Performance of the following tests is also being' terminated.
These tests are not required.by Technical Specifications,Lbut are tests Dairyland Power had committed to performing when the plant was operating., Tho~
tests were in response to TMI requirements'(NUREG-0578 and 0737)'and their, bases no longer apply.
Component Cooling Water. Leakage Test; Offgas Systee Leakage Test-
,/
Containment Bu!1 ding Atmospheric Post Accident' Sampling System i
(PASS):Leaka.ge Test' l
Reactor. Coolant PASS' Leakage Test' Reactor Coolant PASS Backflush
~
OX '.
y,k'
,t 8711130133 871105r i
'k.
PDR ADDCK'05000409
/\\
i.
1 p~
PDR'
') h\\
PCI-40.
14 J.--_L:_-.._._._
O Document Control Desk LAC-12426 Page 2 November 5, 1987 Additionally, calibration of the Control Room hcl and NHs monitors will be termine.ted and the nonitors secured.
It had previously been concluded that operability Technical Specifications on the monitors were no longer needed f
due to the plant shutdown (Reference 3).
{
If you have any questions, please contact us.
l Sincerely, i
l DAIRYLAND POWER COOPERATIVE
-l
\\
1 1
1 James W. Taylor General Manager JWT:LSG:sks J
cc:
Mr. A. Bert Davis, Regional Administrator j
l U. S. Nuclear Regulatory Commission, Region III l
l Glen Ellyn, IL 60137 i
Mr. Peter B. Erickson, LACBWR Project Manager Division of Nuclear Reactor Regulation i
U. S. Nuclear Regulatory Commission Mr. Ken Ridgway, NRC Resident Inspector 1
PCl-40 l
1 L______