ML20141P046

From kanterella
Jump to navigation Jump to search
Forwards Operations Insp Rept 50-445/85-14,Const Insp Repts 50-445/85-14 & 50-446/85-11,Comanche Peak Response Team Activities Insp Repts 50-445/85-14 & 50-446/85-11 on 850930-1031 & Notices of Violation & Deviation
ML20141P046
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/06/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20141P047 List:
References
NUDOCS 8603180486
Download: ML20141P046 (187)


See also: IR 05000445/1985014

Text

In l0

l

In Reply Refer To: MAR 06 M

Dockets: 50-445/85-14

50-446/85-11

Texas Utilities Generating Company

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive, L.B. 81

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by Mr. T. F. Westerman and other

! members of the Region IV Comanche Peak Group during the period September 30

through October 31, 1985, of activities covered by NRC Construction Permits

CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station, Units 1

and 2, and to the respective discussions of our findings with

l Messrs. J. B. George and J. C. Kuykendall, and other members of your staff at

l the conclusion of the inspection.

Areas examined during the inspection included operations, constidction, and

! Comanche Peak Response Team activities. An inspection was also performed by

l Region IV staff of Unit 2 cable tray support modifications during this report

i period. Within these areas, the inspection consisted of selective examination

l

of procedures and reoretentative records, interviews with personnel, and

'

observations by the inspectors. These findings are documented in the enclosed

i inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to:

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10 Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

During this inspection, it was found that certain of your activities appeared

to deviate from commitments made to the NRC. These items and references to the

commitments are identified in the enclosed Notice of Deviation. You are

requested to respond to these deviations in writing. Your response shJuld be

based on the specifics contained in the Notice of Deviation enclosed with this

letter.

With respect to item A in the Notice of Deviation, the NRC has ascertained +

subsequent to this report period that ERC logs for tracking of

equipment / service requests have not been utilizing procedurally required unique

numbers for individual requests. Accordinly, please address this as part of

your response to item A in the Notice of Deviation.

RIV: CPG / SRI / CON SRI /0PS M CPG CPG DRSP F NRR

SHPhillipsq DLKelley IBarnes TFWesterman EHJohnson VSNoonan

3/3/86 3 / S /86 3 / 3/86 4j 3 /86 3 /g/86 L/ /p6g,

.A N '

'

B603180486 B60306

?" }" " " W ij 7~60/

$ l

-

, e

Texas Utilities Generating Company -2-

Twenty unresolved items are identified as follows in the enclosed inspection

report: Appendix C, paragraph 4; Appendix D, paragraphs 3.a. 3.c, 4.g, 5, 5.a.

5.c, 5.d, and 6; Appendix E, paragraphs 6.g, 6.h, 6.j, 7.a, 7.c, and 7.e.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of Appendix L, paragraph 4 of Appendix 0, and paragraph 2 of

Appendix E of the enc,losed report.

The responses directed by this letter and the accompanying Notices are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original signed By

E. H. Johnson

E. H. Johnson, Director

Division of Reactor Safety and

Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - Notice of Deviation

3. Appendix C - NRC Operations Inspection Report

50-445/85-14

4. Appendix D - NRC Construction Inspection Report

50-445/85-14

50-446/85-11

5. Appendix E - NRC Comanche Peak Response Team Activities Inspection Report

50-445/85-14

50-446/85-11

6. Appendix F - NRC Cable Tray Modifications Inspections Report

50-446/85-11

cc w/ enclosures: (See page 3)

e,

u.

'

.

Texas Utilities Generating Company -3-

cc w/ enclosures:

Texas Utilities Generating Company

ATTN: J. W. Beck, Vice President

Licensing, Quality Assurance,

and Nuclear Fuels

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 Polk Street

Dallas, Texas 75224

Renea Hicks

Assistant Attorney General

i

'

Environmental Protection Division

P. O. Box 12548

Austin, Texas 76711

TEXAS STATE DEPARTMENT OF HEALTH

bectoDMB(IE01)

bec distrib. by RIV:

  • RPB * MIS System
  • RRI-0PS *RSTS Operator
  • RR!-CONST *R&SPB
  • T. F. Westerman, CPTG DRSP

V. Noonan, NRR R. Martin, RA

S. Treby, ELD *RSB

  • RIV File J. Taylor, IE
  • D. Weiss,LFMB(AR-2015) R. Heishman, IE
  • w/766