APPENDIX F
U. S. NUCLEAR REGULATORY COMMISSION
REGION IV
CABLE TRAY SUPPORT MODIFICATIONS INSPECTIONS
NRC Inspection Report:
50-446/85-11
CP:
CPPR-127
Docket:
50-446
Category:
A2
Applicant:
Texas Utilities Electric Company
400 North Olive Street
Da11as, Texas 75201
Facility Name:
Comanche Peak Steam Electric Station (CPSES), Unit 2
Inspection At:
Glen Rose Texas
'
Inspection Conducted:
Se tember 30 - October 2, 1985
(
Inspector
__
p////6
L. V.)M lbcf t, Reactor Inspector
Aa)Af
b.wo
Jf/r/5'4
Reviewed By:
1. Barnes, Group Leader, Region IV
Date
CPSES Group
Approved:
I
b
~Y M/4
T. F. Westerman, Chief, Region IV CPSES Group Date
0 fifdtcr
?N/n,'
V
R. E. Ireland, Chief, ErfiIiieering Section
D' ate
Reactor Safety Branch
0603100533 060306
DR
ADUCK 05000445
.
-
-
- .
.
.
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_
l
I
-2-
!
,
Inspection Summary
Inspection Conducted September 30 - October 2, 1985 (Report 50-446/85-11)
Areas Inspected:
Routine, unannounced inspection of cable tray support
,
modifications.
The inspection involved 24 inspector-hours onsite by one NRC
inspector.
Results: Within the area inspected, no violations or deviations were
)
identified.
l
.
l
,
l
l
l
l
l
,
i
l
i
- _ . - - - _ . _ _ - - - - - - _ _ - - - _ - - _ - - - - _ - _ - - - - . - . _ . - - - _ - - - - - - _ - - - - - - - - - _ . _ _ - _ _ - - - - - - - - - - , - - - _ . . - - - - -
- - . - - - - - -
- - - -
- - - - - -
- -
. - -
- -
o
.
-3-
DETAILS
1.
Persons Contacted
Applicant Personnel
- P. Halstead, Site QC Mana y r
Brown A Root (BAR) Emp_loyees
W. E. Baker, Senior Project Nelding Engineer
,
D. Mantz, Cable Tray Hanger General Foreman
D. Geeo, Cable Tray Hanger Foreman
l
Other contractor personnel were also contacted during the course of this
inspection activity.
- Denotes those present at the exit interview.
2.
Safety-Related Cable Tray S'apport Modifications
l
l
The NRC inspector reviewed the documentation traveler packages and
I
inspected the weldments for 12 cable tray supports that had been modified
l
using tube steel in the new design.
The following supports were
i
inspected:
'
l
Suppnrt
Classification
CTH-2-11843
Class 1
CTH-2-11846
Class 1
CTH-2-11841
Class 1
l
CTH-2-11684
Class 1
CTH-2-10040
Class 1
CTH-2-9741
Class 1
CTH-2-11542
Class 1
l
CTH-2-11541
Class 1
!
CTH-2-11540
Class 1
!
CTH-2-9732
Class 1
l
CTH-2-9733
Class 1
l
CTH-2-10033
Class 1
l
l
In the areas inspected, the cable tray support weldments complied with the
requirements for welding in Weld Procedure Specification No. 10046 and the
!
requirements for visual weld inspection in Instruction QI-QP-11.21-1.
The
!
documentation for the supports was consistent with the status of the work.
No violations or deviations were identified.
l
l
l
I
-
-
_ _ - . -- _ _ _ _ _ _ .
_ _ _ _
l
-4-
3.
Exit Interview
.
The NRC inspector met with the applicant representative denoted in
paragraph 1 on October 2,1985, and sumarized the scope and findings of
'