Cable Tray Support Mods Insp Rept 50-446/85-11 on 850930-1002.No Violations or Deviations Identified.Major Areas Inspected:Cable Tray Support Mods
ML20141P083
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/04/1986
From: Barnes I, Gilbert L, Ireland R, Westerman T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20141P047 List:
References
50-446-86-11, NUDOCS 8603180533
Download: ML20141P083 (4)


Text

_ _ _ _ _.

_ _ _ _ _ _

.

APPENDIX F U. S. NUCLEAR REGULATORY COMMISSION

REGION IV

CABLE TRAY SUPPORT MODIFICATIONS INSPECTIONS NRC Inspection Report:

50-446/85-11 CP:

CPPR-127 Docket:

50-446 Category:

A2 Applicant:

Texas Utilities Electric Company 400 North Olive Street Da11as, Texas 75201 Facility Name:

Comanche Peak Steam Electric Station (CPSES), Unit 2 Inspection At:

Glen Rose Texas

'

Inspection Conducted:

Se tember 30 - October 2, 1985 (

Inspector

__

p////6 L. V.)M lbcf t, Reactor Inspector Aa)Af b.wo Jf/r/5'4 Reviewed By:

1. Barnes, Group Leader, Region IV Date CPSES Group Approved:

I b

~Y M/4 T. F. Westerman, Chief, Region IV CPSES Group Date 0 fifdtcr

?N/n,'

V R. E. Ireland, Chief, ErfiIiieering Section D' ate Reactor Safety Branch 0603100533 060306 DR ADUCK 05000445 PDR

.

-

-

-.

.

.

_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_

l I-2-

!

,

Inspection Summary Inspection Conducted September 30 - October 2, 1985 (Report 50-446/85-11)

Areas Inspected:

Routine, unannounced inspection of cable tray support

,

modifications.

The inspection involved 24 inspector-hours onsite by one NRC inspector.

Results: Within the area inspected, no violations or deviations were

)

identified.

l

.

l

,

l l

l l

l

,

i l

i

- _. - - - _. _ _ - - - - - - _ _ - - - _ - - _ - - - - _ - _ - - - -. -. _. - - - _ - - - - - - _ - - - - - - - - - _. _ _ - _ _ - - - - - - - - - -, - - - _.. - - - - -

- -. - - - - - -

- - - -

- - - - - -

- -

. - -

- -

o

.

-3-DETAILS 1.

Persons Contacted Applicant Personnel

  • P. Halstead, Site QC Mana y r Brown A Root (BAR) Emp_loyees W. E. Baker, Senior Project Nelding Engineer

,

D. Mantz, Cable Tray Hanger General Foreman D. Geeo, Cable Tray Hanger Foreman l

Other contractor personnel were also contacted during the course of this inspection activity.

  • Denotes those present at the exit interview.

2.

Safety-Related Cable Tray S'apport Modifications l

l The NRC inspector reviewed the documentation traveler packages and I

inspected the weldments for 12 cable tray supports that had been modified l

using tube steel in the new design.

The following supports were i

inspected:

'

l Suppnrt Classification CTH-2-11843 Class 1 CTH-2-11846 Class 1 CTH-2-11841 Class 1 l

CTH-2-11684 Class 1 CTH-2-10040 Class 1 CTH-2-9741 Class 1 CTH-2-11542 Class 1 l

CTH-2-11541 Class 1

!

CTH-2-11540 Class 1

!

CTH-2-9732 Class 1 l

CTH-2-9733 Class 1 l

CTH-2-10033 Class 1 l

l In the areas inspected, the cable tray support weldments complied with the

requirements for welding in Weld Procedure Specification No. 10046 and the

!

requirements for visual weld inspection in Instruction QI-QP-11.21-1.

The

!

documentation for the supports was consistent with the status of the work.

No violations or deviations were identified.

l l

l

I

-

-

_ _ -. -- _ _ _ _ _ _.

_ _ _ _

l-4-3.

Exit Interview

.

The NRC inspector met with the applicant representative denoted in

paragraph 1 on October 2,1985, and sumarized the scope and findings of

'

the inspection.