Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl
ML20209B602
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/30/1999
From: Kelley J
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-98-01, GL-98-1, TXX-99160, NUDOCS 9907070255
Download: ML20209B602 (4)


Text

i o

w

.t

{]

Log # TXX-99160 t

=

=

File # 10035 GL-98-01 1UELECTRIC

c. w w June 30,1999 Senior Hee President

& PrincipalNuclear oficer Document Control Desk Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 and 50-446 RESPONSE TO GENERIC LETTER (GL) 98-01, SUPPLEMENT 1

" Year 2000 Readiness of Comouter Svstems at Nuclear Power Plants" REF:

TU Electric Letter, Logged TXX-98188*, from C.L. Terry to US NRC dated August 5,1998

Dear Gentlemen:

The purpose of this letter is to respond to the Nuclear Regulatory Commission's request for information regarding Year 2000 readiness at nuclear power plants. Generic ' Letter 98-01 requires two responses. The first response was required by August 10,1998, and was submitted via TXX-98188. This letter provides the second response.

On January 14,1999, the Nucler.r Regulatory Commission issued Supplement 1 to Generic Letter 98-01 to modify the request fo: information in fie original generic letter.

The Supplement stated:

j "In responding to this supplement to GL 98-01, the addressee should confirm [ Year 2000] Y2K readiness of the facility with regard to those systems within the scope of the license and NRC f

regulations, and those systems required for continued operation of the facility after January 1, NL 2000. For those systems which are not Y2K ready as of July 1,1999, the add;essee should D

provide a status and completion schedule for achieving readiness by the year 2000."

This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2

  • TXU Electric was formally TU Electric. A license amendment request (LAR-99-003) was submitted per TXX-99122, dated May 14,1999 to revise ti s company name contained in the CPSES operating licenses.

COMANCHE PEAK SIEAM ELECTRIC STATION 4

ten R se, Tau mm2 aa a~

9907070255 990630 PDR ADOCK 05000445 P

PDR l

,T TXX-99160 Page 2 of 2 in response, Comanche Peak Steam Electric Station (CPSES)is voluntarily reporting facility readiness as outlined in Supplement 1 to Generic Letter 98-01. Enclosed is the Year 2000 Readiness Disclosure for CPSES reporting the status of facility Y2K readiness. This disclosure is submitted under the guidelines of the " Year 2000 Information and Readiness Disclosure Act" (Public Law 105-271).

Based upon the implementation of CPSES's Y2K Readiness Plan and Contingency Plan, and upon completion of remediation of the systems / components noted herein, the facility will be "Y2K Ready."

No negative impact on facility nuclear safety, commitment implementation, plant operation, schedule or the facility's abili y to meet licensing and/or regulatory requirements was identified. Further, contingency plans have been devoloped to mitigate the impact of Y2K-induced events at key rollover dates.

If you have any further inquiries, please contact Mr. Jay Amin, Y2K Project Manager at 254-897-6469 Sincerely, C. L. Terry By:

J. J. Kelley, Jr.

Vice President, Nuclear Engineering and Support NSH/gp]

Attachment Enclosure i

c-Regional Administrator, NEl l

i f

w Attachment to TXX-99160 Page 1 of 1

)

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

TXU Electric

)

Docket Nos. 50-445

)

50-446 (Comanche Peak Steam Electric

)

Station, Unit 1 & 2)

)

J AFFIDAVIT J. J. Kelley, Jr. being duly sworn, hereby deposes and says that he is Vice President, Nuclear Engineering ar.d Support, Officer of TXU Electric, the licensee herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this response to Generic Letter 98-01, Supplement 1; that he is familiar with the content th':reof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.

J. J. Kelley, Jr.

j Vice President, Nuclear Engineering & Support STATE OF TEXAS

)

)

COUNTY OF $0meKUe // )

Subscribed and sworn to before me, on this SA day of M.1999.

16.

Nd'tary Public l

JEAN AMUNDSON l

NOTARY PUBLIC d

STATE OF TEXAS N

. t 8 My Conassion Expires 08-312002 y q
  • Le*

1 Enclosure to TXX-99160 Page 1 of 1 -

TXU Electric's Response to Generic Letter 98-01, Supplement 1:

This disclosure addresses the Y2K readiness of the facility with regard to those systems within the scope of the license, NRC regulations, and other systems required for continued operation of the facility after January 1,2000.- A facility that is "Y2K Ready" has followed a prescribed program to identify and resolve Y2K issues so the facility can operate reliably while meeting

commitments.

TXU Electric has conducted a Y2K readiness program similar to that outlined in Nuclear Utility Year 2000 Readiness. NEl/NUSMG 97-07. The program applies to software, hardware and firmware whose failure due to a Y2K problem would prevent the performance of the safety function of a structure, system or component and the continued operation of the nuclear facility well beyond December 31,1999. The program provided for risk management efforts and development of contingency plans for key rollover dates.

The Y2K readiness program has been completed through the detailed assessment, remediation and contingency phases for those systems required for operaticn of the CPSES facility.' The following remediation remains to achieve year 2000 readiness at the facility:

IJnit 1 - Condensate Polishina Proarammable Loaic Controller Svstem This non safety related modification requires an outage, and is currently scheduled to be implemented during the Unit 1 Refueling outage scheduled in November,1999. This system is necessary for secondary plant chemistry control. A similar modification has successfully been inaplemented in Unit 2 during the Spring 1999 refueling outage. The Unit 1 modification is identical to Unit 2, and therefore the risk from remediation is very low.

Common Facility - Plant Simulator Rehost Proiect This project entails complete rehost of the CPSES Plant simulator. This item does not affect plant operations or plant safetv. Existing processes are already in place to conduct operator training in the event the simuk. tor is not available for any reason, including potential Year 2000 induced failures or should the remediation strategy fail. This project is currently scheduled to be completed by October 30,1999. The risk from this remediation is considered very low.