Ack Receipt of 850530 & 0606 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-333/85-06
ML20127N952
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/18/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Glovier H
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
NUDOCS 8507020258
Download: ML20127N952 (2)


See also: IR 05000333/1985006

Text

,

6

JUN 181985

Docket No. 50-333

Power Authority of the State of New York

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. Harold A. Glovier

Resident Manager

P. O. Box 41

Lycoming, New York 13093

Gentlemen:

i

Subject: Inspection Report No. 50-333/85-06

We acknowledge receipt to your letters dated May 30, 1985 and June 6, 1985,

in response to our letter dated May 10, 1985

Thank you for informing us of the corrective and preventive actions documented

in your letter. These actions will be examined during a future inspection of

your licensed program.

'

Your cooperation with us is appreciated.

Sincerely,

Original Signed By:

2. 0 . o ew/ 4

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

cc:

L. W. Sinclair, President

J. P. Bayne, First Executive Vice President and Chief Operations Officer

A. Klausmann, Vice President - Quality Assurance and Reliability

R. L. Patch, Quality Assurance Superintendent

,

George M. Wilverding, Chairman, Safety Review Committee

l

Gerald C. Goldstein, Assistant General Counsel

NRC Licensing Project Manager

Dept. of Public Service, State of New York

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

l

%[Ofg PDR

0FFICIAL RECORD COPY RL FITZ 85-06 - 0001.0.0

g

O

06/13/85 h

7Q

&

L

.

-;

Power Authority of the State of 2

New York

bec:

Region I Docket Room (with concurrences)

Section. Chief, DRP

,

l

i

'

1m

RI:DRSS

M

RI:DRSS

i Miller /ca as ak Bellamy

6/// /85 6/lt85 6/%/85

l'

I 0FFICIAL RECORD COPY RL FITZ 85-06 - 0002.0.0

06/13/85

.

e.

.

, . J me) A. Fits?'tri k

, Nuclear Power Plant

Po Boa 41

, Lycoming. Ne* York 13093

315 342 3840

Harold A. Glovier

""**"'"'"""

  1. > NewYorkPower

(sf Authority

May 30, 1985

JAFP-85-0474

United States Nuclear Regulatory Commission

Region I

631 Park Avenue

King Of Prussia, PA 19406

Attention: Thomas T. Martin, Director

Division of Radiation Safety and Safeguards

SUBJECT: JAMES A. FITZPATRICK NUCLEAR POWER PLANT

DOCKET NO. 50-333

INSPECTION NO. 85-06

Gentlemen:

In accordance with the provisions of 10 CFR 2 Appendix C, we are

submitting our response to Appendix A Notice of Violation trans-

mitted by your letter dated May 10, 1985, as received by the

undersigned on May 16, 1985. This refers to the inspection

conducted by Ms. M. Miller of your office on March 18 through

22, 1985, at the James A. FitzPatrick Nuclear Power Plant.

RESPONSE TO NOTICE OF VIOLATION

A. The Power Authority agrees with this finding: .

The fundamental cause of this violation was an oversight of

individuals dressing for entry into the drywell whereby

they honestly forgot to transfer their dosimetry from per-

sonal clothes to protective clothing.

The immediate corrective action was to alert radiation

l protection personnel assigned to drywell work control to be

l aware of such occurrences and be on the lookout for possi-

I ble recurrences.

i

The permanent corrective action is to issue written in-

structions to personnel monitoring the drywell access

l

point (s) regarding admitting personnel into the drywell.

At a minimum, these instructions will include verification

'

of proper protective clothing, dosimetry, and authoriza-

l tion. These instructions will be prepared for issue and

l implementation by August 31, 1985.

!

oni +

Q & %' * 'V

1,,,,, g, TV

f ( G(

c >

I , -

\

. t

,

. .

.

U.S.' Nuclear Regulatory Commission May 30, 1985

Attention Thomas T. Martin JAFP-85-0474

SUBJECT: INSPECTION NO. 50-333/85-06 Page -2-

B. The Power Authority agrees with this finding:

The fundamental cause of this violation is a misinterpreta-

tion of " Intermittent Monitoring" which nearly all RWP's

written for drywell work indicated as required. A Senior

R & E Technician and other radiation protection technicians

assigned to the drywell frequently made tours of the dry-

well to verify radiological safety and compliance. They

felt that this satisfied the requirement of intermittent

monitoring even though most RWP's did not specify an exact

time for remonitoring or in fact may not have required

remonitoring. <

The permanent corrective action will be to provide proce-

dural guidance to radiation protection technicians which

specifies requirements for intermittent monitoring. This

will be accomplished by August 31, 1985.

-

p/. - f -

,

HAROLD A. GLOVIER

HAG: jaa

Copy: J. P. Bayne/WPO

J. C. Brons/WPO

R. A. Burns /WPO

J. J. Kelly /WPO

G. M. Wilverding/WPO

J. A. Gray, Jr./WPO

A. Klausmann/WP0

R. J. Converse /JAF

R. L. Patch /JAF

E. Mulcahey/JAF

l C. J. Gannon/JAF

! NRC Resident Inspector /JAF

t NRCI-85-06 File

Document Control Center

CERTIFIED MAIL - RETURN RECEIPT REQUESTED

.

'

, I

,

e

e J:rvos A. Fit:P: trick

o Nucizr Pow r Ptint

, , P O ft m 41

. Lvci,mng Nm vuo 13093

315 342 3h40

. Harold A. Giovier

""*"'*"""

  1. > NewYorkPower

4# Authority

June 6, 1985

JAFP-85-0492

United States Nuclear Regulatory Commission

Region I

631 Park Avenue

King Of Prussia, PA 19406

Attention: Thomas T. Martin, Director

Division of Radiation Safety and Safeguards

SUBJECT: JAMES A. FITZPATRICK NUCLEAR POWER PLANT

DOCKET NO. 50-333, INSPECTION NO. 85-06

Reference: (1) NRC Letter from Mr. Thomas T. Martin

to Mr. Harold A. Glovier Dated May 10, 1985

Re: Inspection No. 50-333/85-06

(2) NYPA Letter from Mr. Harold A. Glovier

to Thomas T. Martin JAFP-85-0474 Dated

May 30, 1985 Re: Inspection No. 50-333/85-06

The following information supplements and clarifies the Authority's response

[ Reference (2)] to the subject inspection [ Reference (1)l:

Item B. Add immediate corrective action:

RESPONSE: The immediate corrective action was to provide guidance

to the radiation protection technicians on intermittent

monitoring requirements. This was accomplished via memo

JRES-85-116 dated April 29, 1985.

Item E Revise permanent corrective action, reword second paragraph:

RESPONSE: The permanent corrective action will be to provide procedural

guidance to radiation protection technicians concerning re-

quirements for intermittent monitoring. Intermittent moni-

toring will normally depend on the progress of work rather

than specific time intervals, particularly where the progress

of work could result in a change in radiological conditions.

Where warranted, specific monitoring frequencies will be

sp fled. This will be accomplished by August 31, 1985.

/ -

/

HAROLD A. GLOVIER

k

HAG:EAM:jaa

copy: J. P. Bayne, J. C. Brons, R. A. Burns, J. J. Kelly, G. M. Wilverding,

J. A. Gray, Jr., A. Klausmann (WPO); R. J. Converse, R. L. Patch, E. Mulcahey,

C. J. Gannon, NRC Resident Inspector, NRCI-85-06 File, DCC (JAF)

"'/f. I ll if & 09

D#w -

arw yn &.