June 18, 1999
Mr. Michael J. Colomb
' Site Executive Officer
New York Power Authority-
' James A. FitzPatrick Nuclear Power Plant
'
Post Office Box 41-
Lycoming, New York 13093 '
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-333/99-04
Dear Mr. Colomb:
On May 29,1999, the NRC completed an inspection at the James A. FitzPatrick Nuclear Power
Plant. The enclosed report presents the results of that inspection.
During the seven-week inspection period covered by this report, the facility was operated safely.
A power reduction followed by single loop operation was appropriately planned and executed by
your staff. In addition, your staff took appropriate actions upon discovery of a condition that
rendered the RCIC system inoperable including restoring the system and verifying the extent of
condition. However, the NRC identified that the post event operability determination did not
correctly assess the operability status of the reactor core isolation cooling system. To address
this matter, your staff has revised the affected operability determination and has agreed to report
this matter in accordance with 10 CFR 50.73.
Based on the results of this inspection, the NRC has determined that two Severity Level IV
- violations of NRC requirements occurred. These violations are being treated as Non-Cited
Violations (NCVs), consistent with Appendix C of the Enforcement Policy. ' The NCVs involved:
- (1) the failure to properly clear protective tags during the refueling outage, resulting in the
reactor core isolation (RCIC) system being inoperable for almost four months; and (2) the
' identification that the as-found setpoints for the suppression chamber to reactor building vacuum
breaker isolation valves were outside of the acceptable tolerance. The NCVs are described in
'the subject inspection report. If you contest the violation or severity level of these NCVs, you
- should provide a response within 30 days of the date of this inspection report, with the basis for
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, D.C. 20555-0001, with copies to the Regional Administrator, Region I, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
D.C. 20555-0001; and the NRC Resident inspector at the FitzPatrick facility.
300d 3
\\
\\
9907010121 990618
~
ADOCK 05000333
G
OFFICIAL RECORD COPY
IE:01
j
. -
',
Michael J. Colomb
2
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room. Should you have any questions
regarding this report, please contact me at 610-337-5146.
. Sincerely,
Original Signed by:
John F. Rogge, Chief
Projects Branch 2
Division of Reactor Projects
Enclosure: Inspection Report 50-333/99-04 -
cc w/ encl:
C. D. Rappleyea, Chairman and Chief Executive Officer
E. Zeitmann, President and Chief Operating Officer
R. Hiney, Executive Vice President for Project Operations
J. Knubel, Chief Nuclear Officer and Senior Vice President
H. P. Salmon, Jr., Vice President of Engineering
W. Josiger, Vice President - Engineering and Project Management
J. Kelly, Director - Regulatory Affairs and Special Projects
T. Dougherty, Vice President - Nuclear Engineering
R. Deasy, Vice President - Appraisal and Compliance Services
' R. Patch, Director - Quality Assurance
G. C. Goldstein,- Assistant General Counsel
C. D. Faison, Director, Nuclear Licensing, NYPA
G. Tasick, Licensing Manager
T. Morra, Executive Chair, Four County Nuclear Safety Committee
Supervisor, Town of Scriba
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
P. Eddy, Electric Division, Department of Public Service, State of New York
G. T. Goering, Consultant, New York Power Authority
J. E. Gagliardo, Consultant, New York Power Authority
E. S. Beckjord, Consultant, New York Power Authority
F. William Valentino, President, New York State Energy Research
and Development Authority
- J. Spath, Program Director, New York State Energy Research
and Development Authority '
'
,
. .J
.
.
Michael J. Colomb
3
Distribution w/ encl:
H. Miller, RA/J. Wiggins, DRA (1)
Nuclear Safety information Center (NSIC)
PUBLIC .
NRC Resident inspector
Region i Docket Room (with concurrences)
J. Rogge, DRP '
R. Barkley, DRP
S. Barber, DRP
R. Junod, DRP
Distribution w/ encl: (VIA E-MAIL)
J. Shackelford, Acting RI EDO Coordinator
E. Adentam, NRR
J. Williams, NRR
M. Campion, RI
inspection Program Branch, NRR (IPAS)
R. Correia, NRR
DOCDESK
DOCUMENT NAME: G:\\ BRANCH 2\\FITZ9904.WPD
To receive a copy of this document, indicate in the box:
"C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No
copy
l OFFICE
Rl/DRP
,
l
Rl/DRP
,,
lNAME
RRasmussen @/
JRogge (//l /
lDATE
06/d99
~
06/g/99
'
'
OFFICIAL RGCORD COPY
'
.
/
j