JAFP-85-0474, Responds to NRC Re Violations Noted in Insp Rept 50-333/85-06.Corrective Actions:Radiation Protection Personnel Notified & Written Instructions & Procedural Requirements Will Be Issued for Monitoring Drywell Work

From kanterella
(Redirected from JAFP-85-0474)
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Rept 50-333/85-06.Corrective Actions:Radiation Protection Personnel Notified & Written Instructions & Procedural Requirements Will Be Issued for Monitoring Drywell Work
ML20129H017
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/30/1985
From: Glovier H
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
JAFP-85-0474, JAFP-85-474, NUDOCS 8506070442
Download: ML20129H017 (2)


Text

-

4

. J:mes A. FitaP: trick

  • Nuclear Power Plant PO. Box 41 Lycoming. NewYork 13093 315 342.3840 Harold A. Giovier
  1. > NewYorkPower 4# Authority May 30, 1985 JAFP-85-0474 United States Uuclear Regulatory Commission Region I 631 Park Avenue King Of Prussia, PA 19406 Attention: Thomas T. Martin, Director Division of Radiation Safety and Safeguards

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 INSPECTION NO. 85-06 Gentlemen:

In accordance with the provisions of 10 CFR 2 Appendix C, we are submitting our response to Appendix A Notice of Violation trans-mitted by your letter dated May 10, 1985, as received by the undersigned on May 16, 1985. This refers to the inspection conducted by Ms. M. Miller of your office on March 18 through 22, 1985, at the James A. FitzPatrick Nuclear Power Plant.

RESPONSE TO NOTICE OF VIOLATION A. The Power Authority agrees with this finding:

The fundamental cause of this violation was an oversight of individuals dressing for entry into the drywell whereby they honestly forgot to transfer their dosimetry from per-sonal clothes to protective clothing.

The immediate corrective action was to alert radiation protection personnel assigned to drywell work control to be aware of such occurrences and be on the lookout for possi-ble recurrences.

The permanent corrective action is to issue written in-structions to personnel monitoring the drywell access point (s) regarding admitting personnel into the drywell.

At a minimum, these instructions will include verification of proper protective clothing, dosimetry, and authoriza-tion. These instructions will be prepared for issue and implementation by August 31, 1985.

8506070442 850530 I PDR G

ADOCM 05000333 pm O

l00 L

g. ~

~ R 4_ ,

.4+
  • 1 L . ,. ;

'*~

.i '-

..t;,.

. U.S. Nuclear;RegulatoryLCcmmis~sion May 30,:1985 Attention 1 Thomas T.. Martin .

JAFP-85-0474

SUBJECT:

. INSPECTION NO. 50-333/85-06' Page--2--

~

^-

B. The Power Authority. agrees with this finding:

The fundamental-cause'of this violation is a misinterpreta-tion ..of . " Intermittent Monitoring" which : nearly all . RWP's

~

written' for - drywell'. work < indicated as ' required'. -A Senior ,

R.&.E Technician and other. radiation protection technicians assigned-to the drywell frequently.made-tours of the' dry-well to. verify radiological safety:and compliance._ They j

n felt - that this . satisfied' the requirement 1 of. intermittent monitoring even.though most RWP's did_not:specify an exact 1 time for remonitoring or in fact may not:-have . required remonitoring.

The permanent corrective'" action; will' be.lto1 provide proce-

- dural guidance to radiation protectionD technicians which * .

^

- specifies requirements for . intermittent: monitoring. This will be accomplished by August 31, 1985.

HAROLD'A.-GLOVIER

. HAG: jaa Copy: J. P.-_.Bayne/WPO J.cC.-Brons/WPO-R.-A. Burns /WPO-

.J.EJ.-Kelly /WPO

. 'G. M. Wilverding/WPO-l- >

J. A. Gray,_Jr./WPO

, A. Klausmann/WPO R.-J. Converse /JAF R. L. Patch /JAF

, .E. Mulcahey/JAF C.LJ. Gannon/JAF .

NRC Resident Inspector /JAF NRCI-85-06. File Document Control Center

-CERTIFIED MAIL RETURN RECEIPT REQUESTED.