Forwards Insp Rept 50-333/98-05 on 980727-0814 & NOV Re Failure to Analyze Effects of LOCA Plus LOOP on Containment Penetration Protection
ML20154B820
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/28/1998
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20154B826 List:
References
50-333-98-05, 50-333-98-5, NUDOCS 9810060023
Download: ML20154B820 (4)


See also: IR 05000333/1998005

Text

l

-

t

e

.

September 28,1998

Mr. Michael J. Colomb

Site Executive Officer

New York Power Authority

James A. FitzPatrick Nuclear Power Plant

-

Post Office Box 41

Lycoming, NY 13093

SUBJECT:

NRC INSPECTION REPORT 50-333/98-05 and NOTICE of VIOLATION

Dear Mr. Colomb:

This refers to the NRC engineering team inspection that was conducted at the FitzPatrick

. Nuclear Power Plant for two weeks during the period of July 27 to August 14;1998. The

inspection evaluated engineering activities to support plant operation, including a very

detailed review of the design and licensing bases of two plant systems. The inspection

also evaluated of the effectiveness of the plant staff in identifying, evaluating, and

correcting problems. The enclosed report presents the results of this inspection;

preliminary results had been provided to Mr. Harry Salmon and members of your staff at an

exit meeting held at the site on August 14,1998.

The team judged the engineering activities at the FitzPatrick plant be generally good, and

the team concluded that the two reviewed systems had accurate design and licensing

bases, which were consistently implemented in operating and testing precedures. The

engineering methods and results were generally sound and correct, and engineering

backlogs were manageable. Degraded but operable conditions on some plant systems

were being monitored by the maintenance and operations staff with proper input and

oversight by engineering. Although none of the degraded conditions reviewed by the

inspection team were determined to represent inoperable components or systems, there

'

were issues that had not been fully questioned or evaluated by engineering. Review of

(

these additional issues did not reverse the existing operability determinations, but the team

\\

judged that the scope of engineering review had sometimes been narrow snd could be

improved.

{

The failure to analyze the effects of a LOCA plus LOOP on containment penetration

protection is a violation of NRC requirements where no written response to NRC is

required. The NRC has concluded that information regarding the reason for the violation,

i

the corrective actions taken and planned to correct the violation and prevent recurrence is

j

already adequately addressed on the docket in this inspection report. Therefore, you are

,

l

not required to respond to this letter unless the description therein does not accurately

l

L

reflect your corrective actions or your position in that case, or if you choose to provide

!

l

additional information, you should follow the instructions specified in the enclosed Notice.

I

i

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room.

GDi

'

9810060023 980928

PDR

ADOCK 05000333

G

PM

_

L

j

_.

..

. - - - - - . -

.

.

.

. -.-.-- .

_.

.

. . . .

-

'

'

.

l.

l

1

.

l

Mr. Michael J. Colomb

2

Should you have any questions concerning this inspection, please contact the team leader

'

Mr. Harold Gray at (610) 337-5325.

We appreciate your cooperation.

Sincerely,

ORIGINAL SIGNED BY:

James T. Wiggins, Director

Division of Reactor Safety

Docket Nos.: 50-333

Enclosure: NRC Inspection Report 50-333/98-05 and Notice of Violation

l

'

i

!

.

_ _ _ .

_ _ . - - - _

_ _ _ _ . _ _

. . _ . _ _ . _ _ _ _ . _ _ . _ . . . _ . . _ _ . _ . -_

_. .___

,

.

.

.

a

1

-

5

Mr. Michael J. Colomb

3

l,

'

cc w/ encl:

,C. D. Rapployea, Chairman and Chief Executive Officer

'

E. Zeltmann, President and Chief Operating Officer

-

i

R. Hiney, Executive Vice President for Project Operations

J. Knubel, Chief Nuclear Officer and Senior Vice President

i

H. P. Salmon, Jr., Vice President of Engineering

W. Josiger, Vice President - Engineering and Project Management

i

J. Kelly, Director . Regulatory Affairs and Special Projects

!

T. Dougherty, Vice President - Nuclear Engineering

R. Deasy, Vice President - Appraisal and Compliance Services

i

4

i

R. Patch, Director - Quality Assurance

i

G. C. Goldstein, Assistant General Counsel

C. D. Faison, Director, Nuclear Licensing, NYPA

<

!

K. Peters, Licensing Manager

l

T. Morra, Executive Chair, Four County Nuclear Safety Committee

Supervisor, Town of Scriba

,

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

,

i.

P. Eddy, Electric Division, Department of Public Service, State of New York

G. T. Goering, Consultant, New York Power Authority

J. E. Gagliardo, Consultant, New York Power Authority

E. S. Beckjord, Consultant, New York Power Authority

,

F. William Valentino, President, New York State Energy Research

i

and Development Authority

J. Spath, Program Director, New York State Energy Research

and Development Authority

,

l

}

6

.

.,

.

Mr. Michael J. Colomb

j

Distribution w/ encl:

H. Miller, RA/W. Axelson, DRA (1)

J. Wiggins, DRS

L. Nicholson, DRS

G. Meyer, DRS

H. Gray, DRS

D. Screnci, PAO (2)

Nuclear Safety Information Center (NSIC)

PUBLIC

NRC Resident inspector

Region I Docket Room (with concurrences)

D.Lew,DRP

P. Kaufman, DRP

R. Junod, DRP

DRS File

Distribution w/ encl:- (VIA E-MAIL)

B. McCabe, RI EDO Coordinator

S. Bajwa, NRR

J. Williams, NRR

M. Campion, RI

- Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

F. Talbot, NRR

DOCDESK

DOCUMENT NAME: G:\\CMMEB\\ GRAY \\FITZ980hNS

- T.

m. . n .e es. m

n.nt mm m. m m. n : c - Copy wNhout ettschment/enchure P = Copy whh attachment / enclosure

. n - No copy

6

OFFICE

Rl/DRS

l,E

Rl/DRS

l

Rl/DRP

lE

Rl/DRS

l

i

NAME

4 H Gra f h

,

j

G Meyer (

j

D Lew (K/

J Wiggins((

,

DATE(,, 94g98

\\ffgF

9jg98 y' f

9/f/98

9fy98

b_

$l

}l

$UM

_

f60/