JL+
.
.
41990.
Docket No. 50-333-
New York Power.' Authority
James-A. FitaPatrick Nuclear Power Plant
ATTN
Resident Manager
P.O. Box 41
Lycoming, New York 13093
'l
Subject:
Inspection Report No. 50-333/90-05
This letter transmits the results of the routine inspection conducted by Messrs.
f
W. Schmidt and R. Plasse of this of fice on July 1 through August 11, 1990 at the.-
James
A.
FitzPatrick Nuclear . Power Plant, Scriba, New York.
Mr. Schn.dt
j
discussed the inspection findings with you and other members of your staf f at the
'
conclusion of the inspection.
Your staff identified an instance in which, at different times on hourly fire
,
L
watch patrols, nine security personnel entered e posted high radiation area
without following your radiation protection program for such entries. Your staf f
did a credible ' job -in identifying this violation and in taking corrective.
actions, and we considered not citing this violation based on the NRC's licensee'
identified violation' policy.
However, as nine individuals, trained in your-
,
i
procedures, inappropriately entered the posted area, we have concluded that prior
corrective actions regarding compliance with radiological control procedures were
not effective.
Further, this incident represents another example of your
personnel being' insensitive to potentially adverse radiological consequences.
,
'In your response to this violation, please address this aspect of the incident.
l
'
Your performance of the high pressure coolant injection to the vessel was a well
planned and executed initiative. The information you have developed is valuable
L
for verification of continued satisf actory system performance. We encourage you
.,
l
to share this ~ information with the other BWRs through industry information
j
P
systems.
Sincerely,
J
i
'
.
l
James C. Linville, Chief
Projects Branch 1
i
Division of Reactor Projects
f
Enclosures:
i
1. .
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report Number 50-333/90-05
official Record Copy
_
[
n4 ,
4
9009260215 900904
i
{'DR
ADOCK 05000333
'I
s
/$
i
b
. . ,
_
'
. .
,
.
.
'New York Power Authority
SEP 041990
i
cc w/ enc 1
J
J.P. Baynej President
l
J.C.
Brons,' Executive Vice President-Nuclear Generation
R.E. Boedle, Vice President Nuclear Support
S.S.
Eulla, Vice President Nuclear Engineering
A. Klausmann, Senior Vice President-Appraisal and Compliance Services
<
R.L. Patch, Quality Assurance Superintendent'
G.H. Wilverding, Manager, Nuclear Safety Evaluation
Gerald C. Goldstein, Assistant General Counsel
-!
Department of Public Service, State of New York
State of New York, Department of Law
Public Document Room (PDR)
,.
!
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
l.
NRC Resident Inspector
'!
I
State of New York
!
1'
bec w/enel:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encle)
J. Linville, DRP
G. Meyer, DRP-
D~.
Vito, DRP
R. Capra, NRR
,
l
K. Abraham, PAO
I
M. Miller, SLO
3
'
l:
D. LaBarge, NRR
11
J. Caldwell, EDO
bec w/ Executive Summary Only:
W.
Hehl, DRP
J. Wiggins, DRP
j-
W. Hodges, DRS
J. Durr, DRS
l
R. Gallo, DRS
M. Knapp,_DRSS
R. Bellamy, DRS
l .
W. Cook, SRI, Nine Mile Point
l '
L. Rossbach, SRI, Indian Point 3
Concurrence:
,
Schmidt
Meyer
ille
8/g/90
8/p/90
/90
i
Q
Official Record Copy
d
_