Forwards SE Authorizing Licensee 980508 Request for Relief from Certain ASME Code Requirements at Ja FitzPatrick Npp. Licensee Requested Relief from Requirements for Addl Exams of CRD Bolting When Cracks Detected in head-to-shank Area
ML20155H525
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/03/1998
From: Bajwa S
NRC (Affiliation Not Assigned)
To: James Knubel
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20155H528 List:
References
TAC-MA1764, NUDOCS 9811100168
Download: ML20155H525 (3)


Text

- .. . _. . _ _ _ _ _ _ _ _ . _ _ . _ _ . _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ . -

Mr. J m:s Knubel

. Chief Nuctur Officer Noyember 3, 1998 PowIr Authority cf tha Stata of

. New York 123 Main Street 1

White Plains, NY 10601 '

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT- AUTHORIZATION OF ALTERNATIVE TO ASME CODE REQUIREMENTS FOR CONTROL ROD DRIVE BOLTING (TAC NO. MA1764)

Dear Mr. Knubel:

i On May 8,1998, the Power Authority of the State of New York (also known as the New York Power Authority, or NYPA) requested relief from certain American Society of Mechanical Engineers (ASME) Code requirements at the James A. FitzPatrick Nuclear Power Plant.

Specifically, NYPA requested relief from requirements for additional examinations of control rod drive (CRD) bolting when cracks are detected in the head-to-shank fillet area. Additional information regarding this request was provided on September 11,1998, in response to an NRC request dated August 31,1998.

{

~

The NRC staff, with the assistance of its contractor, the Idaho National Engineering and Environmental Laberatory (INEEL), has concluded that NYPA's metallurgical and engineering analyses provide reasonable assurance of the continued inservice structuralintegrity of the CRD

' bolting at the FitzPatrick Nuclear Power Plant. Replacing all CRD bolting at one time, during the Code-required additional examinations, would result in hardship without a compensating increase 4 in the level of quality and safety. Therefore, the staff concluded that the licensee's proposed i

attemative in Request for Relief No. RR-14 is authorized pursuant to 10 CFR 50.55a(a)(3)(ii).

Details of the staff and INEEL assessment are provided in the enclosed safety evaluation and Technical Letter Report.

If you have any questions regarding this matter, please contact Joe Williams at (301) 415-1470.

Sincerely, ORIGINAL SIGNED BY:

. S. Singh Bajwa, Director Project Directorate 1-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-333 fh h gg {*{t,

Enclosure:

Safety Evaluation w/ attachment cc w/ encl: See next page i DISTRIBUTION:

Docket File S. Bajwa OGC B.McCabe -

Q)l '

t g

PUBLIC S. Little G. Hill (2 copies) C. Hehl, RI PDI-1 R/F J. Williams ACRS T. McLellan J. Zwolinski T. Harris (e-mail only to TLH3)

DOCUMENT NAME: G:\FITZ\MA1764.LTR *See Previous Concurrence

. To r:ceive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with j tttachment/ enclosure EN" = No copy I,

OFFICE PM:PDI 1 [/)/ l LAIPDI1J() l DPOI1 M OGC* l l NAME JWil1 lams /r$f SLittle F S8ejus /puK yyg DATE 11/ 2 /96 / 11/ 1 /98 11/'4 /98 10/28/98 Official Record Copy PDR ADOCK 05000333 P PDR

>n nag o *, UNITED STATES j

I y j NUCLEAR REGULATORY COMMISSION g 2 WASHINGTON, D.C. 30a66-0001 b .,g 8 November 3, 1998 Mr. James Knubel Chief Nuclear Officer Power Authority of the State of New York 123 Main Street .

White Plains, NY 10601 i

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT- AUTHORIZATION OF ALTERNATIVE TO ASME CODE REQUIREMENTS FOR CONTROL ROD DRIVE BOLTING (TAC NO. MA1764)

Dear Mr. Knubel:

1 On May 8,1998, the Power Authority of the State of New York (also known as the New York Power Authority, or NYPA) requested relief from certain American Society of Mechanical Engineers (ASME) Code requirements at the James A. FitzPatrick Nuclear Power Plant.

Specifically, NYPA requested relief from requirements for additional examinations of control rod drive (CRD) bolting when cracks are detected in the head-to-shank fillet area. Additional information regarding this request was provided on September 11,1998, in response to an NRC l request dated August 31,1998.

The NRC staff, with the assistance of its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL), has concluded that NYPA's metallurgical and engineering analyses provide reasonable assurance of the continued inservice structuralintegrity of the CRD bolting at the FitzPatrick Nuclear Power Plant. Replacing all CRD bolting at one time, during the Code-required additional examinations, would result in hardship without a compensating increase in the level of quality and safety. Therefore, the staff concluded that the licensee's proposed alternative in Request for Relief No. RR 14 is authorized pursuant to 10 CFR 50.55a(a)(3)(ii).

Details of the staff and INEEL assessment are provided in the enclosed safety evaluation and Technical Letter Report, if you have any questions regarding this matter, please contact Joe Williams at (301) 415-1470.

Sincerely, S. Singh Bajwa, Director Project Directorate 1-1 Division of Reactor Projects 1/ll Office of Nuclear Reactor Regulation Docket No. 50-333

Enclosure:

Safety Evaluation w/ attachment cc w/ encl: See next page

" James Knubel James A. FitzPatrick Nuclear Power Authority of the State Power Plant of New York cc: ,

Mr. Gerald C. Goldstein Mr. F. William Valentino, President Assistant General Counsel New York State Energy, Research, Power Authority of the State and Development Authority of New York Corporate Plaza West 1633 Broadway 286 Washington Avenue Extension New York, NY 10019 Albany, NY 122034 399 Resident inspector's Office Mr. Richard L. Patch, Director U. S. Nuclear Regulatory Commission Quality Assurance P.O. Box 136 Power Authority of the State I Lycoming, NY 13093 of New York i 123 Main Street l Mr. Harry P. Salmon, Jr. White Plains, NY 10601  !

Vice President - Engineering l

Power Authority of the State Mr. Gersid Goering l of New York 28112 Bayview Drive 123 Main Streat Red Wing, MN 55066 White Plains, NY 10601 Mr. James Gagliardo Ms. Charlene D. Faison Safety Review Committee Director Nuclear Licensing 708 Castlewood Avenue

^

Power Authority of the State Arlington,TX 76012 of New York 123 Main Street Mr. Arthur Zaremba, Licensing Manager White Plains, NY 10601 James A. FitzPatrick Nuclear l Power Plant Supervisor P.O. Box 41 Town of Scriba Lycoming, NY 13093 .

Route 8, Box 382 Oswego, NY 13126 Mr. Paul Eddy New York State Dept. of Mr. Eugene W Zeltmann Public Service President and Chief Operating 3 Empire State Plaza,10th Floor Officer Albany, NY 12223

. Power Authority of the State of New York Michael J. Colomb 99 Washington Ave., Su;le No. 2005 Site Executive Officer Albany, NY 12210 2820 James A. FitzPatrick Nuclear Power Plant P.O. Box 41

' Charles Donaldson, Esquire Lycoming, NY 13093 Assistant Attomey General

. New York Department of Law l 120 Broadway New York, NY 10271 Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road

- King of Prussia, PA 19406

.. . - - . - - - - - . - - - - . . . . - - - , . - - - - . . -