Forwards SE Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement
ML20153D255
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/21/1998
From: Bajwa S
NRC (Affiliation Not Assigned)
To: James Knubel
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20153D257 List:
References
TAC-MA2472, NUDOCS 9809250004
Download: ML20153D255 (4)


Text

. _ _ _ _ . _ _ . _ _ _ . _ _ _ _ . _ _ . _ _ . _ . _

Mr. JimIs Knubel Septe m ber 21, 1998 Chi;f Nucl::er Officer Pow;r Authority of'.h3 Stita of New York 123 Main Street White Plains, NY 10601

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - ALTERNATIVE TESTING OF CONTAINMENT FOLLOWING EMERGENCY CORE COOLING SYSTEM

. (ECCS) SUCTION STRAINER REPLACEMENT (TAC NO. MA2472)

Dear Mr. Knubel:

On August 7,1998, the New York Power Authority (NYPA, also known as the Power Authority of the State of New York), proposed attemative testing following a containment repair. NYPA requested relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, (ASME Code)Section XI, lWE-5221. The request was made pursuant to 10 CFR 55a(a)(3)(i).

The repair is planned to patch a temporary hatch which will be cut in the torus of the James A.

FitzPatrick Nuclear Power Plant during an upcoming refueling outage. NYPA plans to use this hatch to facilitate installation of new suction strainers for the emergency core cooling and reactor core isolation cooling systems. The proposed alternative testing involves performing a containment pressurization test to verify integrity of the temporary hatch repair. This testing consists of pressurizing the containment to a minimum of 45 psig and holding that pressure for a minimum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, as opposed to the pneumatic leakage test required by IWE-5221.

As documented in the enclosed Safety Evaluation, the NRC staff has reviewed your submittal, and concludes that your attemative program provides an acceptable level of quality and safety, and is an acceptable attemative to the requirements stated in paragraph IWE-5221 of the ASME Code,Section XI. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the attemative is authorized.

If you have any questions regarding this matter, please contact Joe Waliams on (301) 415-1470.

Sincerely, Original Signed by:

S. Singh Bajwa, Director Project Directorate I-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation i i Docket No. 50-333  ; f)j  !

f

Enclosure:

Safety Evaluation cc w/ encl: See next page DISTRIBUTION:

60 S. Bajwa J. Zwolinski ACRS PUBLIC J. Williams S. Little C. Hehl, Region i PDI-1 R/F - OGC G. Bagchi DOCUMENT NAME: G:\FITZ\MA2472.LTR

~ To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy

  • see previous concurrence OFFICE PM:PDI 1 Mf lE LA:PDI*1 d l D:PDI-1 , /g) l ECGB l OGC NAME JWiltfans:1cM SLittle F SBaJwa //P6L. G8agchi* O/lAdf14(6 DATE 09/tif/98 // 09/l4/98 09/ 1) /98 9/4/98 09/li.A/98

, ,' ~ Official Record Copy 9909250004 980921 PDR ADOCK 05000333 f . _

NRC FR.E CENTEB C q

Mr. J mis Knubel Septe m ber 21, 1998 i Chitf Nucleir Officer PowIr Authority of tha Stit3 of New York 123 Main Street White Plains, NY 10601

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT- ALTERNATIVE TESTING OF CONTAINMENT FOLLOWING EMERGENCY CORE COOLING SYSTEM (ECCS) SUCTION STRAINER REPLACEMENT (TAC NO. MA2472)

Dear Mr. Knubel:

On August 7,1998, the New York Power Authority (NYPA, also known as the Power Authority of the State of New York), propo::ad alternative testing following a containment repair. NYPA requested relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, (ASME Code)Section XI, lWE-5221. The request was made pursuant to 10 CFR 55a(a)(3)(i).

The repair is planned to patch a temporary hatch which will be cut in the torus of the James A.

FitzPatrick Nuclear Fuwer Plant during an upcoming refueling outage. NYPA plans to use this hatch to facilitate installation of new suction strainers for the emergency core cooling and reactor core isciation cooling systerns. The proposed attemative tosting involves performing a containment pressurization test te verify integrity of the temporary hatch repair. This testing consists of pressurizing the containment to a minimum of 45 psig and holding that pressure for a minimum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, as opposed to the pneumatic leakage test required by IWE-5221.

As documented in the enclosed Safety Evaluation, the NRC staff has reviewed your submittal, and concludes that your alternative program provides an acceptable level of quality and safety, and is an acceptable alternative to the requirements stated in paragraph IWE-5221 of the ASME Code,Section XI. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the attemative is authorized, if you have any questions regarding this alatter, please contact Joe Williams on (301) 415-1470.

Sincerely, Original Signed by:

S. Singh Bajwa, Director Project Directorate 1-1 Division of Reactor Projects - 1/11 i Office of Nuclear Reactor Regulation l Docket No. 50-333 )

Enclosure:

Safety Evaluation cc w/ encl: See next page DISTRIBUTION.

Docket File S. Bajwa J. Zwolinski ACRS PUBLIC J. Williams S. Little C. Hehl, Region 8 PDI-1 R/F OGC G. Bagchi DOCUMENT NAME: G:\FITZ\MA2472.LTR To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy

  • see previous concurrence OFFICE PM:PDI 1 d4 , l E LA: POI 1 4 l D PDI 1 , /d l ECG8 l OGC NAME JWil t lams: t cWM/ $little # S8aJwa //PCL G8agchi* l'/ \D14 ( (

DATE 09/ #1(/98 // 09/#d/98 09/ 11 /98 9/4/98 09/liA/98~

Official Record Copy I

i

. c nieu y  % UNITED STATES

( g j f

NUCLEAR REGULATORY COMMISSION o WASHINGTON, D.C, 20666-0001

  1. Septe m ber 21, 1998 Mr. James Knubel Chief Nuclear Officer Power Authority of the State of New York
123 Main Street White Plains, NY 10601

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT- ALTERNATIVE TESTING OF CONTAINMENT FOLLOWING EMERGENCY CORE COOLING SYSTEM (ECCS) SUCTION STRAINER REPLACEMENT (TAC NO. MA2472)

Dear Mr. Knubel:

On August 7,1998, the New York Power Authority (NYPA, also known as the Power Authority of the State of New York), proposed attemative testing following a containment repair. NYPA requested relisf from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, (ASME Code)Section XI, IWE-5221. The request was made pursuant to 10 CFR 55a(a)(3)(i).

The repair is planned to patch a temporary hatch which wi
1 be cut in the torus of the James A.

FitzPatrick Nuclear Power Plant during an upcoming refueling outage. NYPA plans to use this hatch to facilitate installation of new suction strainers for the emergency core cooling and reactor

, core isolation cooling systems. The proposed altemative testing involves performing 9 containment pressurization test to verify integrity of the temporary hatch repair. Thit. *..ssting consists of pressurizing the containment to a minimum of 45 psig and holding that pressure for a minimum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, as opposed to the pneumatic leakage test required by IWE-5221.

As documented in the enclosed Safety Eve!uation, the NRC staff has reviewed your submittal, and concludes that your altemative program provides an acceptable level of quality and safety, and is an acceptable altemative to the requirements stated in paragraph IWE-5221 of the ASME Code,Section XI. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the attemative is authorized.

If you have any questions regarding this matter, please contact Joe Williams on (301) 415-1470.

Sincerely, S. Singh Bajwa, Director Project Directorate I-1 Division of Reactor Projects -I/Il Office of Nuclear Reactor Regulation Docket No. 50-333

Enclosure:

Safety Evaluation cc w/ encl: See next page

._ . . . _____ _ . . ~ _ . _ _ __ ._ _ _ _ _ __ _ _ . .._.__._.__ ___._

a .

W James Knubel James A. FitzPatrick Nuclear Power Authority of the State Power Plant of New York cc:

Mr. Gerald C. Goldstein Regional Administrator, Region 1 Assistant General Counsel U.S. Nuclear Regulatory Commission Power Authority of the State 475 Allendale Road of New York King of Prussia, PA 19406 1633 Broadway New York, NY 10019 Mr. F. William Valentino, President New York State Energy, Research, l Resident inspector's Office and Development Authority U. S. Nuclear Regulatory Commission Corporate Plaza West P.O. Box 136 286 Washington Avenue Extension Lycoming, NY 13093 Albany, NY 12203-6399 Mr. Harry P. Salmon, Jr. Mr. Richard L. Patch, Director Vice President - Engineering Quality Assurance Power Authority of the State Power Authority cf the State of New York of New York
  • 123 Main Street 123 Main Street White Plains, NY 10601 White Plains, NY 10601 Ms. Chariene D.' Faison Mr. Gerard Goering Director Nuclear Licensing 28112 Bayview Drive Power Authority of the State Red Wing, MN 55066 of New York 123 Main Street Mr. James Gagliardo White Plains, NY 10601 Safety Review Committee 708 Castlewood Avenue Supervisor Arlington, TX 76012 Town of Sci iba Route 8, Box W Mr. Arthur Zaremba, Licens ng Manager Oswego, NY 1M2C James A. FitzPatrick Nuclear Power Plant Mr. Eugene W. Zeltmann P.O. Box 41 President and Chief Operating Lycoming, NY 13093 Officer Power Authority of the State Mr. Paul Eddy of New York New York State Dept. of 99 Washington Ave., Suite No. 2005 Public Service Albany, NY: 12210-2820 3 Empire State Plaza,10th Floor Albany, NY 12223 Charles Donaldson, Esquire Assistant Attomey General Michael J. Colomb New York Department of Law Site Executive Officer 120 Broadway James A. FitzPatrick Nuclear Power Plant New York, NY 10271 P.O. Box 41 Lycoming, NY 13093 I

- - - , , . - _ _ ,