October 14, 1998
'
Mr. Michael J. Colomb
' Site Executive Officer
New York Power Authority
James A. FitzPatrick Nuclear Power Plant
Post Office Box 41
Lycoming, NY 13093
SUBJECT:
NRC INTEGRATED INSPECTION 50-333/98-06 -
Dear Mr. Colomb:
On October 4,1998, the NRC completed an inspection at the James A. FitzPatrick Power
Plant. The enclosed report presents the results of that inspection.
During the six week inspection period covered by this report, performance at the James A.
- FitzPatrick reactor facility was appropriately focused on safety. Testing and control room
operations were conducted appropriately with formal communications. Material
deficiencies were appropriately dispositioned and operability determinations were
. adequately performed inspector follow up and closure of open items indicated corrective
actions implemented for previous issues were reasonable and effective.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room.
Sincerely,
Original Signed by:
I
David C. Lew, Chief
Projects Branch 2A
i
Division of Reactor Projects
!
i
9810200164 981014
F
ADOCK 05000333
G
0FFICIAL RECORD COPY
IE:01
,
_ . ._.
_ . . _
. _ . _ _ _
.
_ _m
__. . . -
. . - . _ . . ____.__
_ . . ~
_ . _ _ . . _ _ _ _ _ _
-
,
,
'
.
'
' Micheel J. Colomb '
2
Docket No.: 50-333
- License Nc. DPR 59
i
-f
- Enclosure: Inspection Report 50-333/98-06
- cc w/ encl:
~ C. D. Rapplayea, Chairman and Chief Executive Officer
E. Zeltmann, President and Chief Operating Officer .
l
. R. Hiney, Executive Vice President for Project Operations.
!
J. Knubel, Chief Nuclear Officer and Senior Vice President
H. P. Salmon, Jr., Vice President of Engineering
- W. Josiger, Vice President Engineering and Project Management
J. Kelly, Director - Regulatory Affairs and Special Projects
. T. Dougherty, Vice President - N /. clear Engineering
- R. Deasy, Vice President '- Appraisal and Compliance Services
!
' R. Patch, Director - Quality Assurance
G. C. Goldstein, Assistant General Counsel
l
C. D. Faison, Director, Nuclear Licensing, NYPA
K. Peters, Licensing Manager
T. Morra, Executive Chair, Four County Nuclear Safety Committee
i
Supervisor, Town of Scriba
. .
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
j
g
P. Eddy, Electric Division, Department of Public Service, State of New York
i
G. T. Goering, Consultant, New York Power Authority
i
' J. E. Gagliardo, Consultant, New York Power Authority
E. S. Beckjord, Consultant, New York Power Authority
F. William Valentino, President, New York State Energy Research
-
'
'
'
and Development Authority
.
[
- J. Spath, Program Director, New York State Energy Research
!
l
and Development Authority
p
- _
f
.
e
i
a
R
'
<
.
!
l
. - . ,
. .
~
.
.
. -
-
.
..
.
. - - .
-
.
.
.
. - .
.
.
Michael J. Colomb
3
Distribution w/ encl:
1
H. Miller, RA/W. Axelson, DRA (1)
Nuclear Safety Information Center (NSIC)
'
PUBLIC
NRC Resident inspector
Region i Docket Room (with concurrences)
D. Lew, DRP
!
J. Rogge, DRP
P. Kaufman, DRP
R.Junod,DRP
Distribution w/ encl: (VIA E-MAIL)
B. McCabe, RI EDO Coordinator
S. Bajwa, NRR
'
J. Williams, NRR
M. Campion, RI
Inspection Program Branch, NRR (IPAS)
R. Correia, NRR
F. Talbot, NRR
DOCDESK
i
I
,
,
l
i.
DOCUMENT NAME: G:\\ BRANCH 2A\\FITZ9806. INS
l --
To receive a copy of this document, indicate in the box: "C" = Copy without
l
attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No copy
OFFICE
Rl/DRP
l
Rl/DRP
l
NAME
RRasmussen gV 6
DLew
D/
DATE
10/$ /98
10/d /98
'