Text
7
L
..
...
L
September 22, 1999
,
I
l
Mr. Michael J. Colomb
'
Site Executive Officer
New York Power Authority
'
' James A. FitzPatrick Nuclear Power Plant
i
-
Post Office Box 41
Lycoming, New York 13093
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-333/99-07
Dear Mr. Colomb:
On August 28,1999, the NRC completed an inspection at the James A. FitzPatrick Nuclear
Power Plant. The results of this inspection were discussed on September 8,1999, with you and
I
other members of your staff. The enclosed report presents the results of that inspection.
This inspection was an examination of activities conducted under your license as they relate to
safety and compliance with the Commission's rules and regulations and with the conditions of
your license. Within these areas, the inspection consisted of a selected examination of
procedures and representative records, observations of activities, and intervimus with personnel.
l
Negative finding were assessed using the significance determination process; all findings either
j
screened out of the process or were determined to be within the licensee response band
l-
(Green).
The NRC identified one issue of low safety significance that has been entered into your
corrective action program and is discussed in the summary of findings and in the body of the
j
attached inspection report. The issue, failure to adequately establish the RHR low flow switch
setpoints, was also determined to involve a violation of NRC requirements, but because of the
low safety significance the violation is not cited. If you contest this noncited violation, you should
provide a response within 30 days of the date of this inspection report, with the basis for your
denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC
20555-0001; with a copies to the Regional Administrator, Region 1; the Director, Office of
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and
the NRC Resident Inspector at the FitzPatrick facility.
"
9909290392 990922
ADOCK 05000333
e
OFFICIAL RECORD COPY
IE:01
_-
.
.
. Michael J. Colomb
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room. Should you have any questions
regarding this report, please contact me at 610-337-5146.
Sincerely,
Original Signed by:
John F. Rogge, Chief
Projects Branch 2
Division of Reactor Projects
Docket No. 50-333
Enclosure: Inspection Report 50-333/99-07
.
.
i
Michael J. Colomb
3
cc w/ encl:
C. D. Rappleyea, Chairman and Chief Executive Officer
E. Zeltmann, President and Chief Operating Officer
,
R. Hiney, Executive Vice President for Project Operations
l
J. Knubel, Chief Nuclear Officer and Senior Vice President
H. P. Salmon, Jr., Vice President of Engineering
W. Josiger, Vice President - Engineering and Project Management
J. Kelly, Director- Regulatory Affairs and Special Projects
T. Dougherty, Vice President - Nuclear Engineering
R. Deasy, Vice President - Appraisal and Compliance Services
R. Patch, Director - Quality Assurance
G. C. Goldstein, Assistant General Counsel
C. D. Faison, Director, Nuclear Licensing, NYPA
G. Tasick, Licensing Manager
T. Morra, Executive Chair, Four County Nuclear Safety Committee
Supervisor, Town of Scriba
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
P. Eddy, Electric Division, Department of Public Service, State of New York
G. T. Goering, Consultant, New York Power Authority
J. E. Gagliardo, Consultant, New York Power Authority
E. S. Beckjord, Consultant, New York Power Authority
F. William Valentino, President, New York State Energy Research
and Development Authority
J. Spath, Program Director, New York State Energy Research
and Development Authority
T. Judson, Syracuse Peace Council
F. Elmer, Sierra Club
S.Penn
B. Brown
S. Griffin, Chenango North Energy Awareness Group
T. Ellis
A. Slater, GRACE
C. Gagne
L. Downing
H. Hawkins, Syracuse Green Party
E. Smeloff, PACE Energy Project
'
i
l
' -- -
r-
,
.
.
l
'
Michael J. Colomb
4
,
I
Distribution w/ encl:
H. Miller, RA/J. Wiggins, DRA (1)
Nuclear Safety Information Center (NSIC)
PUBLIC
NRC Resident inspector
Region I Docket Room (with concurrences)
J. Rogge, DRP
S. Barber, DRP
L. Harrison, DRP
R. Junod, DRP
Distribution w/ encl: (VIA E-MA!L)
M. Tschiltz, RI EDO Coordinator
E. Adensam, NRR
J. Williams, NRR -
Inspection Program Branch, NRR (IPAS)
R. Correia, NRR
T. Frye, NRR
R. Frahm, NRR
M. Ring, Rlli
R. Lanksbury, Rlli
B. Bonser, Rll
P. Frederickson, Ril
C. Marshall, RIV
DOCDESK
,
DOCUMENT NAME: G:\\ BRANCH 2\\FITZPATRICK\\FITZ9907.WPD
To receive a copy of this document, indicate in the box:
"C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No
copy
OFFICE
Rl/DRP
l
Rl/DRP a
l
NAME
RRasmussenW
JRogge W
09/ 4J99
09k10199 '
DATE
1
OFFICIAL RECORD COPY