Forwards Insp Rept 50-333/90-03 on 900426-0526.No Violations Noted.Nrc Concerned W/Increase in Frequency of Personnel Errors & Poorly Documented 10CFR50.59 Decision Prior to Implementation of Control Room Human Factors Design Mods
ML20055D049
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/26/1990
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fernandez W
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20055D050 List:
References
NUDOCS 9007030149
Download: ML20055D049 (2)


See also: IR 05000333/1990003

Text

.

.

+

_s

_

s '* b

.. .

.

JUN 261990.

Docket No. 50-333

New York Power Authority

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. William Fernandez

. Resident Manager

Post Office Box 41

Lycoming, New York 13093

Subject: NRC Region I Inspection Report No. 50-333/90-03

This letter transmits the results of the routine inspection conducted by

Messrs. W. Schmidt and R. Plasse of this office on April 26 through

May 26,-1990, at the James A. FitzPatrick Nuclear Power- Plant, Scriba, New

York. Mr. Schmidt discussed the inspection findings with you and other members

of your staff at the conclusion of the inspection. No violations were

identified during this period.

We_ are concerned by two issues raised in the report: the apparent increase in

the frequency.of personnel errors by both licensed and non-licensed operations

department staff and the poorly documented 10 CFR 50.59 decision prior to

implementation of control room human factors design modifications. Increased

attention to performance in _both areas is indicated.

We appreciate your cooperation.

Sincerely,

ORIGINAL SIGNED BY:

GLEN W. MEYEft

N Curtis J. Cowgill, Acting Chief

A Reactor Projects Brar.ch No. 1

' Division of Reactor Projects

Enclosure: NRC Region I Inspection Report No. 50-333/90-03

\

OFFICIAL RECORD COPY IR FITZ 90-03 - 0001.0.0 p/\

__ 06/26/90 '

9007030149 900626

PDR ADOCK 05000333

Q PDC

D

.,

.. .

.-

New York Power Authority 2 WN P.,6 ~ ism

,

cc w/ enc 1:

J. Bayne, President

J. Brons, Executive Vice President-Nuclear Generation

R. Beedle, Vice President Nuclear Support

S. Zulla, Vice President Nuclear Engineering

A. Klausmann, Senior Vice President-Appraisal and Compliance Services

R. Patch, Quality Assurance Superintendent

G. Wilverding, Manager, Nuclear Safety Evaluation

G. Goldstein, Assistant General Counsei

Department of Public Service, State o' New York

State of New York, Department of Law

Public Document Room (PDR)

local Public Document- Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, SLO Designee

bec w/ encl:

Region I Docket Room (with concurrences)

Hanagement Assistant, DRMA (w/o encl)

J. Linville, DRP

G. Meyer, DRP

D. Vito, DRP

R. Summers, DRP

M. Miller, DRP

K. Abraham, PA0

M. Taylor, SLO

e D. I aBarge, NRR

J. Caldwell, ED0

bec w/ Letter and Executive Summary Only:

W. Kane, DRP

'J. Wiggins, DRP

W. Hodges, DRS ,

J. Durr, DRS

R. Gallo, DRS

M. Knapp, DRSS

R. Bellamy, DRS

W. Cook, SRI - Nine Mile Point

L. Rossbach, SRI - Indian Point 3

R. Capra, NRR

RI:DRP RI:DR RI:DRP

WSchmidt/mjd GMeyer CCowgill

6/k7/90 6/Jf)/90 6.S7/90

(7'r

Ip

j 0FFICIAL RECORD COPY IR FITZ 90-03 - 0002.0.0

i 06/26/90

i