JPN-99-030, Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days
ML20216J380
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/29/1999
From: James Knubel
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216J385 List:
References
JPN-99-030, NUDOCS 9910050083
Download: ML20216J380 (2)


Text

r:

  • 123 Man Street

, Vduto Nns. New York 10001 1

914 681.6950 914 287.3309 (Fax)

  1. > NewWrkPbwer -'

tv Authon.ty Senor Vce Presdent and ru noer m-September 29,1999 JPN 030 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, DC 2C555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed One-Time-Only Change to the Technical Specifications Reaardina RHRSW Allowable Out of-Service Time (JPTS-99-005)

Dear Sir:

This application for an amer.dment to the James A. FitzPatrick Technical Specifications (TS) proposes a change to Specification 3.5.B.3 and associated Bases. Specifically, this change extends the Limiting Condition for Operation (LCO) allowable out of service time for the Residual Heat Removal Service Water (RHRSW) system from 7 days to 11 days with special conditions to allow for installation of a modification to the division "A" RHRSW strainer.

The applicability of this proposed change is limited to the one-time-only installation of tN?

modification on the "A" RHRSW strainer.

The signed original of the Application for Amendment to the Operating License is enclosed for filing. Attachment I contains the proposed new TS pages and Attachment 11 is the Safety Evaluation for the proposed changes. A markup of the affected TS pages is included as Attachment 111.

A copy of this application and the associated attachments are being provided to the  ;

designated New York State officialin accordance with 10 CFR 50.91.

There are no new commitments made by the Authority in this letter. If you have any questions, please contact Ms. C. D. Faison.

n' Very truly y rs, O

/

_ .s 4

  • 9910050083 990929 PDR ADOCK 05000333 J. Knubel P PDR Senior Vice President and Chief Nuclear Officer

att: as stated cc: Regiona: Administrator U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspeuor U. S. Nuclear Regulatory Com'nission P.O. Box 136 Lycoming, NY 13093 Mr. G. Vissing, Project Manager Project Directorate 1 Division of Licensing Project Management U. S. Nuclear Regulatory Commission Mail Stop OWFN 8C2 Washington, DC 20555 Mr. F. William Valentino, President New York State Energy Research and Development Authority Corporate Plaza West 296 Washington Avenue Extension Albany, NY 12203-6399

_ _ _ _