,". C#" W D DA/RYLAND COOPERAT/VE
- P.O. BOX 817
- 2615 EAST AV SOUTH
- LA CROSSE. WISCONSIN S4601 (608) 788-4000 June 10, 1982 In reply, please refer to LAC-8339 DOCKET NO. 50-409 U. S. Nuclear Regulatory Commission ATTN:
Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Division of Operating Reactors Washington, D. C.
20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER P.EACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE N0. DPR-45 REPORTABLE OCCURRENCE N0. 82-14
REFERENCES:
(1)
LACBWR Technical Specifications, Section 4.2.2.22 (2)
DPC Letter, Lin Mr to Keppler, LAC-8338, date-June 9, 1982 Gentlemen:
In accordance with Reference 1, DPC requests permission to increase the primary system temperature at LACBWR above 212 F.
This request was predicated by the reactor shutdown on June 5,1982 due to primary coolant alpha activity in excess of the Technical Specification limit of 5 x 10-6 pCi/gm.
A description of the circumstances leading to the increased alpha activity is contained in Reference 2, which is attached to this letter. Since the increase in alpha activity was due to resuspension of alpha bearing materials l
in the coolant, rather than new fuel failure, DPC feels justified in requesting permission to increase primary temperature above 212 F.
Prompt attention to this request would be appreciated.
If there are any questions, please contact us.
Very truly yours,
DAIRYLAND POWEA COOPERATIVE l
8206150212 820610 DR ADOCK 05000409 Frank Linder, General Manager p
PDR FL:LSG:eme
\\
Enclosure l