Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML24033A212 | 5 February 2024 | January 11, 2024, Public Meeting Summary - Fuel Cycle Construction Oversight Public Meeting |
ML24022A158 | 22 January 2024 | (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 |
ML23325A202 | 16 January 2024 | CFR Part 52 Construction Lessons-Learned Report |
ML24005A114 | 5 January 2024 | Recommendation for 2023-301 Cr/Sim 3 (Emergency Depress the Reactor Using Main Steam Line Drains) |
ML23312A221 | 5 December 2023 | EGM-23-001, Interim Guidance for Dispositioning Violations Associated with the Enhanced Weapons, Firearms Background Checks, and Security Event Notification Rule |
NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection | 14 November 2023 | Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection |
ML23306A159 | 2 November 2023 | Enforcement Action EA-22-129 Inspection Readiness Notification |
ML23257A006 | 14 September 2023 | Enforcement Action EA-22-129 Inspection Postponement Request |
ML23257A252 | 14 September 2023 | Louisiana Energy Services, LLC, Dba Urenco USA (Uusa), Construction Activities Associated with Upcoming Site Expansion Plans |
NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding | 8 September 2023 | Response to NRC Inspection Report and Preliminary White Finding |
ML23240A508 | 28 August 2023 | Westinghouse Electric Company LLC - NRC Semi-Annual Discharge Report (January- June 2023) |
ML23236A499 | 24 August 2023 | Industry Feedback on Region II Fuel Cycle Facility Construction Oversight Workshop Held August 15, 2023, and Suggested Topics for Additional Public Meetings in Fall 2023 |
ML23233A043 | 18 August 2023 | Enforcement Action EA-22-122 Inspection Readiness Notification |
RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-02 | 17 August 2023 | Reply to a Notice of Violation (NOV) 05000270/2023010-02 |
ML23215A157 | 3 August 2023 | Enforcement Action EA-22-129 Inspection Readiness Notification |
ML23215A121 | 3 August 2023 | 301 Exam Administrative Items (2B) Normal Release |
ML24005A278 | 27 July 2023 | 23-030 M230100 GNF-A 2023 Biennial Exercise NRC Cover Letter 7-27-23 |
NL-23-0628, Readiness for Supplemental Inspection EA-22-101 | 26 July 2023 | Readiness for Supplemental Inspection EA-22-101 |
RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) | 20 July 2023 | Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) |
ML23178A073 | 30 June 2023 | EGM-20-001 Rev. 3, Enforcement Discretion Not to Cite Certain Violations of 10 CFR 73.56 Requirements |
ML23194A043 | 28 June 2023 | Nuclear Fuel Services, Inc. (NFS) - Reply to a Notice of Violation (VIO 70-143/2023402-01) |
ML23171A917 | 20 June 2023 | Summary of Meeting Concerning the V.C. Summer Nuclear Station, to Discuss Annual Assessment for Period Jan 1, 2022 Through December 31, 2022 |
ML23152A006 | 5 June 2023 | Summary of Public Comments - Licensee Performance Review of Nuclear Fuel Services, Inc. Docket Number 07000143 |
ML23151A253 | 31 May 2023 | Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 |
ML23146A117 | 26 May 2023 | Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 |
ML23130A374 | 10 May 2023 | Request to Delay NRC Intial Licensing Examination |
NL-23-0326, Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-108 | 1 May 2023 | Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-108 |
NL-23-0295, Reply to a Notice of Violation; EA-22-101 | 1 May 2023 | Reply to a Notice of Violation; EA-22-101 |
IR 05000424/2004025 | 28 April 2023 | Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 |
ML23115A433 | 26 April 2023 | STC-23-029 Notification of the Issuance of Procedure Sa-900, Termination of Uranium Milling Licenses in Agreement States |
ML23082A106 | 21 April 2023 | Cancellation of Inspection Programs Memoranda Regarding the Public Health Emergency for the Reactor Safety Program |
ML23103A203 | 21 April 2023 | Cancellation of Inspection Programs Memoranda Regarding Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Nuclear Materials and Waste Safety Program |
ML23100A157 | 13 April 2023 | STC-23-023 Closeout of State Agreements SA Procedure SA-118 Orientation Meetings for New Agreement States |
ML23086B969 | 23 March 2023 | American Centrifuge Plant - Declaration of Readiness for Operational Readiness and Management Measures Review for American Centrifuge Operating, LLC - HALEU Demonstration |
ML21095A313 | 23 March 2023 | 301 Final SRO Written Exam |
ML23065A070 | 6 March 2023 | Bru 2022301 2B Exam Administrative Items |
ML23061A183 | 3 March 2023 | Egm 22-001 Rev 1, Enforcement Discretion for Noncompliance of Tornado Hazards Protection Requirements at Isfs |
ML23058A272 | 27 February 2023 | Westinghouse, NRC Semiannual Discharge Report July - December 2022 |
ML23058A131 | 27 February 2023 | FW: TVA Intentions on EA-22-129 |
ML23067A344 | 21 February 2023 | BWXT Nuclear Fuel Services, Inc. Reply to Notice of Violation (VIO 07000143/2022-406-02) |
ML23044A577 | 13 February 2023 | (VCSNS) Unit 1, Readiness for 95001 Supplemental Inspection; EA-22-039 |
ML23038A251 | 7 February 2023 | Louisiana Energy Services, LLC Response to Apparent Violations in Inspection Report 07003103/2022-007; EA-22-086 |
ML23019A349 | 19 January 2023 | Louisiana Energy Services, LLC - Pec Request Rescission and Request for Response Extension |
NL-23-0011, Update to Supporting Documentation Regulatory Conference EA-22-101. Cover Letter Only | 5 January 2023 | Update to Supporting Documentation Regulatory Conference EA-22-101. Cover Letter Only |
ML22355A032 | 3 January 2023 | Revised Charter for the Vogtle Readiness Group to Oversee the Transition to Operations for Vogtle Units 3 and 4 |
ML22350A709 | 16 December 2022 | Louisiana Energy Services, LLC, Aba Urenco USA (Uusa), Request for Pre-decisional Enforcement Conference for Apparent Violations, NRC Inspection Report 07003103-2022007; EA-22-086 |
ML22334A083 | 1 December 2022 | Attachment 1 - Targeted ITAAC Listing VEGP Unit 4 |
ML22334A081 | 1 December 2022 | Update to Targeted Inspections, Tests, Analysis, and Acceptance Criteria for Vogtle Electric Generating Plant Unit 4 |
ML22334A084 | 1 December 2022 | Attachment 2 - ITAAC Family Listing VEGP Unit 4 |
ML22334A142 | 22 November 2022 | 11-14-2022 Watts Bar Integrated Inspection Report |
NL-22-0884, Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-101 | 17 November 2022 | Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-101 |
ML22322A088 | 17 November 2022 | (Vcsns), Unit 1 - Reply to a Notice of Violation; EA-22-039 |
ML23003A168 | 10 November 2022 | Notification of Vogtle Commercial Grade Dedication Inspection |
ML22294A140 | 13 October 2022 | Cover Letter - Non-Substantive Changes to the Physical Security Plan Revision 13a LES-22-118-NRC |
ML22278A339 | 22 September 2022 | Enclosure 3 - BWXT Nuclear Operations Group, Inc.-Lynchburg Presentation Slides (9/22/22) - Pre-decisional Enforcement Conference |
ML22221A092 | 9 August 2022 | Special Inspection Charter to Evaluate the Loss of Offsite Power to the Unit 1 4160V B Train Emergency Power Bus and Failure of the Turbine Driven AFW Pump |
ML22213A047 | 1 August 2022 | Document Request for Catawba Nuclear Station - Radiation Protection Inspection - Inspection Report 2022-03 |
ML22200A286 | 19 July 2022 | (Vcsns), Unit 1 - Pre-Decisional Reply to Apparent Violation 05000395/2022001-01 |
ML22194A933 | 14 July 2022 | Charter for the Working Group on Assessing the NRC Telework Policy and Implementation |
RA-22-0197, Reactor and Senior Reactor Operator Initial Examinations 05000400/2022301 | 6 July 2022 | Reactor and Senior Reactor Operator Initial Examinations 05000400/2022301 |
L-2022-061, Response to Request for Additional Information Regarding Positive Fitness-For-Duty Test | 14 April 2022 | Response to Request for Additional Information Regarding Positive Fitness-For-Duty Test |
WBL-22-009, Submittal of Initial Operator Licensing Outline | 10 March 2022 | Submittal of Initial Operator Licensing Outline |
ML22039A065 | 4 February 2022 | Response to Apparent Violations in NRC Inspection Report No. 07000027/2021407; EA 21-171 |
ML22018A027 | 18 January 2022 | 2022 All RFI Responses - Exercise and Program Inspections - Revl |
ML22006A118 | 6 January 2022 | Regulatory Information Conference (RIC) 2022 Invitation Letters W18 |
ML21354A015 | 22 December 2021 | Memorandum from J. Lubinski Approval of Principal NMSS Tribal Liaison Program Roles and Responsibilities Tribal Procedure, TR-100, Revision. 1 |
ML21350A050 | 16 December 2021 | 2A-3 Exam Admin Items Surry 2021-301 (2 Year Delay) |
ML21350A036 | 16 December 2021 | 2B Exam Admin Items Surry 2021-301 (Normal Release) |
ML21336A575 | 9 December 2021 | Update to Targeted Inspections, Tests, Analyses, and Acceptance Criteria for Vogtle Electric Generating Plant Units 3 and 4 |
ML21322A259 | 19 November 2021 | Charter for the Follow-On Review of the Challenges, Lessons Learned, and Best Practices During the COVID-19 Public Health Emergency |
RA-21-0311, Response to Confirmatory Order EA-19-025 | 17 November 2021 | Response to Confirmatory Order EA-19-025 |
ML21323A135 | 16 November 2021 | 02-REPP - Georgia L1 Finding 2021 Hatch Fse _Final (111721) |
ML21342A304 | 2 November 2021 | Attachment 1 - Vogtle Units 3 & 4 ITAAC - November 2021 |
ML21342A305 | 2 November 2021 | Attachment 2 - Vogtle Units 3 and 4 ITAAC - November 2021 |
ML21294A278 | 2 November 2021 | Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency Tor the Nuclear Materials and Waste Safety Program |
ML21295A302 | 2 November 2021 | Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program |
ML21302A214 | 29 October 2021 | 301 Post Exam Comments |
NL-21-0887, Response to Apparent Violation Noted in Inspection Report 05000424/2021401 and 05000425/2021401, EA-21-026 | 19 October 2021 | Response to Apparent Violation Noted in Inspection Report 05000424/2021401 and 05000425/2021401, EA-21-026 |
ML21256A218 | 13 September 2021 | 301 Exam 2B Administrative Items (Normal Release) |
ML21256A185 | 13 September 2021 | 301 Exam Administrative Items (2 Year Delayed Release) |
ML21256A293 | 13 September 2021 | 301 Exam Final Items (2 Year Delayed Release) (1) |
ML21238A363 | 31 August 2021 | Proposed Final NRC Impep Report |
ML21251A134 | 19 August 2021 | BWXT Nuclear Fuel Services, Inc., Submittal of Reply to a Notice of Violation |
ML21194A427 | 16 August 2021 | Memo - Adherence to U.S. Nuclear Regulatory Commission Policies and Procedures - Accounting for Internal Use Software |
ML21216A099 | 4 August 2021 | File 2B Administrative Items |
ML21216A102 | 4 August 2021 | File 2A3 Exam Administrative Items |
ML21179A224 | 28 June 2021 | EGM-2020-001, Rev. 2, Enforcement Discretion Not to Cite Certain Violations of 10 CFR 73.56 Requirement |
ML21174A080 | 23 June 2021 | 301 Final SRO Written Exam (2-Year Delayed Release) |
ML21167A316 | 16 June 2021 | 301 ADAMS 2A-1 |
ML21167A327 | 16 June 2021 | 301 ADAMS 2A-2 |
ML21167A335 | 16 June 2021 | 301 ADAMS 2A-3 |
ML21160A035 | 3 June 2021 | Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-03 |
ML21137A002 | 17 May 2021 | Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 |
ML21130A651 | 17 May 2021 | SRM-LTR-20-0419-2 Plans to Complete Transition to Internet Protocol Version 6 |
ML21118A960 | 14 May 2021 | STC-21-026 - Closeout of State Agreements Procedure SA-1100 |
ML21123A302 | 3 May 2021 | 301 Exam Report Items - RO as Given Written Exam |
ML21091A175 | 7 April 2021 | STC-21-018 Notification of the Issuance, and Opportunity to Comment on the Interim Procedure SA-700, Processing an Agreement |
ML21095A306 | 5 April 2021 | 301 Final RO Written Exam |
ML21027A274 | 28 January 2021 | Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions |
ML21028A405 | 25 January 2021 | 301 ADAMS 2A-2 |
ML21012A128 | 22 January 2021 | Approval of the Risk-Informed Process for Evaluations |
ML21012A180 | 11 January 2021 | Calendar Year 2021 Licensee Performance Review Schedule |
ML21011A008 | 11 January 2021 | 301-2B Normal Release - Exam Administrative Items |
ML21011A284 | 8 January 2021 | 2021 GFE Notification Letter |
ML21004A236 | 4 January 2021 | 301 Exam Report Items - SRO as Given Written Exam |
ML20324A658 | 30 December 2020 | AGM-2020-001, Electronic Allegation Files and Self Assessments |
ML20318A242 | 18 December 2020 | .72 50.73 Applicability Memo |
ML20349A150 | 17 December 2020 | EGM-20-001 Rev.1, Enforcement Discretion Not to Cite Certain Violations of 10 CFR 73.56 Requirements |
ML21193A087 | 16 December 2020 | File 2A3 Exam Administrative Items |
ML21193A052 | 16 December 2020 | File 2B Normal Release Exam Administrative Items |
ML20304A203 | 8 October 2020 | Readiness Notification for 95001 Supplemental Inspection Notice of Violation: EA-20-057 |
ML20246G648 | 17 September 2020 | Memo - Fiscal Year 2021 Cybsersecurity Risk Management Activities |
ML20254A347 | 8 September 2020 | Supplement to Operator License Examination Comments |
ML20178A130 | 15 July 2020 | Memorandum Transmitting Safety Evaluation Regarding Welded Reinforcement Bar Splices at Vogtle Electric Generating Plant Units 3 and 4 |
ML20156A340 | 15 July 2020 | EGM-20-003, Interim Guidance for Dispositioning Violations of Licensed Material Possession and Use Limits |
ML20143A281 | 1 June 2020 | Inspection Guidance During Transition from COVID-19 Mandatory Telework for the Nuclear Material and Waste Safety Programs |
ML20141L766 | 28 May 2020 | Inspection Guidance During Transition from COVID-19 Mandatory Telework |
ML20111A015 | 17 April 2020 | Memorandum-COVID19 Resident Inspection Coverage |
ML20106F226 | 17 April 2020 | Implementation of Resident Inspector Coverage at Category I Fuel Facilities During COVID-19 |
ML20091L385 | 15 April 2020 | EGM-20-002, Dispositioning Violations of NRC Requirements for Completion Periodicities Associated with Security Training and Requalification Requirements During the COVID-19 Public Health Emergency (Attachment 1) |
ML20083K794 | 15 April 2020 | Enforcement Guidance Memorandum 20-002, Dispositioning Violations of NRC Requirements During Coronavirus Disease (COVID-19) |
ML20104C131 | 15 April 2020 | Memo to Regions for Exercise Scenario Confidentiality |
ML20105A163 | 14 April 2020 | RIC 2020 T7 Panel Schlueter NEI |
ML20105A165 | 14 April 2020 | RIC 2020 NEI Montgomery |
ML20097E538 | 6 April 2020 | Implementation of Resident Inspector Site Coverage During COVID19 |
ML20106F071 | 31 March 2020 | 301 Post Exam Comments |
ML20079E064 | 19 March 2020 | Final Decision on Independent Spent Fuel Storage Installation Inspection Program Enhancements - Working Group Recommendations |
ML20079J887 | 10 March 2020 | FEMA - After Action Report Final Browns Ferry, Radiological Emergency Preparedness Exercise June 26, 2019 |
ML20079J890 | 9 March 2020 | FEMA - Transmittal of Final Exercise Report for June 26, 2019, Full Participation Plume Phase Exercise of the Offsite Radiological Emergency Response Plans Site-Specific to the Browns Ferry |
ML20065J964 | 5 March 2020 | Global Nuclear Fuel: Verification of Completion - Confirmatory Order Committments |
ML20071A555 | 3 March 2020 | Consent and Hearing Waiver Form Signed Confirmatory Order EA-19-025 (Enclosure 1) |
ML20063J621 | 28 February 2020 | Cycle 30 Startup Physics Tests Report |
ML20056F505 | 25 February 2020 | Westinghouse, NRC Semi-Annual Discharge Report July - December 2019 |
ML20255A270 | 25 February 2020 | Westinghouse Electric Co, LLC - NRC Semi-Annual Discharge Report, July - December 2019, Annual Assessment of Public Dose Due to Liquid and Gaseous Effluents |
ML19316A667 | 13 February 2020 | EGM-20-001, Enforcement Discretion to Not Cite Certain Violations of 10 CFR 73.56 Requirements |
ML20044D477 | 12 February 2020 | March 2020 Region II GFE Cover Letter |
ML20022A032 | 7 February 2020 | Memorandum Addressing Issues of Very Low Safety Significance |
ML20016A153 | 16 January 2020 | RFI |
ML20009D269 | 8 January 2020 | Guidance for 2019 Construction End-of Cycle Review |
ML19352G682 | 18 December 2019 | STC-19-079 Notification of the Issuance, and Opportunity to Comment on the Following Interim Procedures Related to the Integrated Materials Performance Evaluation Program (Impep): SA 101, SA 102, SA 103 and SA 109 |
ML19346G036 | 12 December 2019 | Biennial Update of Fee Estimates |
ML19346G721 | 12 December 2019 | Radiation Safety Baseline Inspection RFI 2020-001 |
ML19219A131 | 4 December 2019 | Enforcement Guidance Memorandum (Egm) 19-001, Clarification of Inspection Documentation Requirements in Section 2.2.3 of the Enforcement Policy |
CNL-19-111, TVA Response to Request for Information Regarding the U.S. Department of Labor Finding of Discrimination (EA-19-107) | 12 November 2019 | TVA Response to Request for Information Regarding the U.S. Department of Labor Finding of Discrimination (EA-19-107) |
ML19255H625 | 8 November 2019 | OEDO-18-00527-OE, Allegation Guidance Memorandum 2019-001, Licensee-Identified Fitness-For-Duty Drug and Alcohol Violations by Individuals |
ML19221B554 | 3 October 2019 | Call for Nominations to Attend the Reactive Inspection Leadership Training Course |
ML19295E564 | 2 October 2019 | FEMA - Transmittal of Final After Action Report for 02/20/2019 Turkey Point Plume Exposure Pathway Exercise |
L-19-048, Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042 | 12 September 2019 | Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042 |
RA-19-0355, Reply to a Notice of Violation, NRC Inspection Report 05000413/414/2019002-01 | 12 September 2019 | Reply to a Notice of Violation, NRC Inspection Report 05000413/414/2019002-01 |
RA-19-0357, Reply to a Notice of Violation - NRC Inspection Report 05000413/2019002-04 | 12 September 2019 | Reply to a Notice of Violation - NRC Inspection Report 05000413/2019002-04 |
ML21074A382 | 29 August 2019 | ADAMS 2B |
ML21074A346 | 29 August 2019 | Adams 2C |
ML19242D479 | 29 August 2019 | Peer Review of the Division of Fuel Facility Inspection 2019 Inspection Reports |
ML19239A458 | 27 August 2019 | Farley 2019 Post Examination Comments and Documentation |
ML19226A388 | 13 August 2019 | Public Outreach Meeting Summary - Fuel Fabrication Facilities 7-2019 and 5-16-19 |
ML19205A215 | 26 July 2019 | Regulatory Information Conference 2020-Solicitation for Creative Members to Serve on the Technical Review and Planning Committees |
ND-19-0684, Active Operator License Maintenance | 2 July 2019 | Active Operator License Maintenance |
ML19172A240 | 21 June 2019 | Memorandum to Those on Attached List from Marian L. Zobler, General Counsel Regarding Membership in the NRCs Backfitting and Forward Fitting Community of Practice |
ML19163A274 | 20 June 2019 | Enclosure 4 - Oversight Program Notes and Themes |
ML19163A275 | 20 June 2019 | Enclosure 5 - Licensing Program Notes and Themes |
ML19163A277 | 20 June 2019 | Enclosure 1 - Public Meeting Summary: Brainstorming and Scoping Workshop on the NRC Initiatives for Building a Smarter Fuel Cycle Licensing and Oversight Program |
L-19-036, Notification of Readiness for NRC Inspection Procedure 95001 Inspection | 20 June 2019 | Notification of Readiness for NRC Inspection Procedure 95001 Inspection |
ML19165A019 | 7 June 2019 | Reply to a Notice of Violation (EA-18-159) |
ML19163A273 | 31 May 2019 | Enclosure 3 - Smarter NRC Programs - NEI Presentation Slides - Industry Input May 2019 |
ML19163A278 | 21 May 2019 | Enclosure 2 - Attendee List |
ML19129A287 | 9 May 2019 | Submittal of Annual Radiological Environmental Operating Report |
ML19123A349 | 1 May 2019 | Public Meeting Summary - Vogtle Electric Generating Plant, Docket Nos. 05000025 and 05000026 |
ML19094A658 | 26 April 2019 | RIC 2019-RII - Haney Thank You |
ML19037A004 | 28 February 2019 | Memorandum to Regional Administrators - Closeout of Low Safety Significant/Low Risk Concerns - Tornado-Generated Missile Protection |
ML19067A153 | 22 February 2019 | Radiological Emergency Preparedness Exercise |
ML19058A235 | 12 February 2019 | Final After Action Report for the August 14, 2018, Oconee Nuclear Station Plume Exposure Pathway Exercise |
ML19045A371 | 12 February 2019 | March 2019 GFE Cover Letter Rii |
ML19032A163 | 30 January 2019 | 301 Post-Exam Comments |
RA-19-2019, Brunswick 2019-301 Post-Exam Comments | 30 January 2019 | Brunswick 2019-301 Post-Exam Comments |
ML19030A696 | 29 January 2019 | ISI RFI |
RA-19-0083, Reactor Operator and Senior Reactor Operator License Post-Examination Documentation | 24 January 2019 | Reactor Operator and Senior Reactor Operator License Post-Examination Documentation |
ML18352A921 | 17 January 2019 | Completion of Action Items from the 2017 Inspections, Tests, Analyses, and Acceptance Criteria Demonstration Project |
ML19016A029 | 16 January 2019 | Radiation Safety Document Request |
ML18324A583 | 2 November 2018 | FEMA - Submittal of Final Report for the July 31, 2018 Brunswick Plume-Exposure-Pathway-Exercise |
ML18283B611 | 10 October 2018 | Responding to Letter of 8/5/1976, Referring to IE Inspection Reports for 50-259/76-17, 50-260/76-17, Letter Advising No Proprietary Information Is Contained |
IR 05000259/1976017 | 10 October 2018 | Responding to Letter of 8/5/1976, Referring to IE Inspection Reports for 50-259/76-17, 50-260/76-17, Letter Advising No Proprietary Information Is Contained |
ML18282A243 | 10 October 2018 | Assessment of License Conditions for Inspection at Vogtle, Units 3 & 4 |
RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection | 4 October 2018 | NRC Request for Information Baseline Radiation Safety Inspection |
ML18261A311 | 27 September 2018 | Fiscal Year 2019 Cybersecurity Risk-Management Activities |
ML18311A013 | 26 September 2018 | Non-Concurrence Pkg for Oconee Nuclear Station - NRC Inspection Report 50-269, 50-287, 2018090 |
IR 05000287/1980090 | 26 September 2018 | Non-Concurrence Pkg for Oconee Nuclear Station - NRC Inspection Report 50-269, 50-287, 2018090 |
ML18236A869 | 26 September 2018 | Recommendations for Enhancing the Nuclear Regulatory Commission Cold Operator Licensing Process, Part B |
ML18236A870 | 5 September 2018 | Recommendations Colp Charter Part B Final |
ML18242A693 | 30 August 2018 | Exam Administrative Items ADAMS-2D |
ML18240A427 | 28 August 2018 | 301 Exam Draft Items 2A - Delay Release 2 Yrs |
ML18240A432 | 28 August 2018 | 301 Exam Administrative Items 2D - Normal Release |
ML18269A289 | 14 August 2018 | September 2018 GFE Cover Letter Rii |
ML18170A167 | 1 August 2018 | EGM-18-002, Interim Guidance for Dispositioning Violations for Failure to Control and Maintain Constant Surveillance for Portable Gauges |
ML18187A051 | 3 July 2018 | (07-03-18 Email) IMC-1601 Revision Message Plan |
RA-18-0049, Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 | 25 June 2018 | Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 |
IR 05000324/2018301 | 25 June 2018 | Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 |
NL-18-0859, Unit 2 - Reply to a Notice of Violation: EA-17-204 | 20 June 2018 | Unit 2 - Reply to a Notice of Violation: EA-17-204 |
NL-18-0782, Unit 2 - Reply to a Notice of Violation: EA-17-187 | 20 June 2018 | Unit 2 - Reply to a Notice of Violation: EA-17-187 |
ML18192A599 | 14 June 2018 | DPO Case File: DPO-2017-011 (Public) |
L-75-522, Report of Leaking Socket Welds Will Not Be Available Until 11/21/1975 | 24 May 2018 | Report of Leaking Socket Welds Will Not Be Available Until 11/21/1975 |
ML18068A623 | 11 May 2018 | EGM-18-001, Interim Guidance for Dispositioning Apparent Violations of 10 CFR Parts 34, 36 and 39 Requirements Resulting from the Use of Remotely Processed Dosimetry During Licensed Activities |
ML18135A082 | 10 May 2018 | Louisiana Energy Services, LLC - Response to an Apparent Violation in NRC Inspection Report (70-31032018-002); EA-18-023 |
ML18124A089 | 4 May 2018 | Denial of Non-Cited Violation 05000260/2016002-03, Failure to Report a Condition That Could Have Prevented Fulfillment of a Safety Function |
ML18127B172 | 2 May 2018 | Public Meeting Summary - MOX Fuel Fabrication Facility, Docket No. 70-3098 |
ML18115A008 | 25 April 2018 | E-mail Brunswick Hs Request for Information |
ML18085A081 | 23 April 2018 | Allegation Guidance Memorandum 2018-001, Allegation Program Efficiencies. |
ML18096A468 | 6 April 2018 | Global Nuclear Fuel - Americas, LLC - Submittal of NRC Region Ii Requested Document |
ML18102A526 | 2 April 2018 | FEMA - After Action Report for V.C. Summer, Radio!Ogical Emergency Preparedness Exercise for October 31, 2017 |
L-2018-075, Response to Request for Additional Information Regarding License Amendment Request 255, Relocate the Explosive Gas Monitoring, Gas Decay Tanks and Standby Feedwater System Technical Specifications ... | 27 March 2018 | Response to Request for Additional Information Regarding License Amendment Request 255, Relocate the Explosive Gas Monitoring, Gas Decay Tanks and Standby Feedwater System Technical Specifications ... |
ML18082A058 | 23 March 2018 | Summary of Meeting with Oconee Nuclear Station to Discuss Annual Assessment of Oconee for the Period of January 01, 2017 - December 31, 2017 |
ML18075A088 | 16 March 2018 | Global Nuclear Fuel - Americas, LLC - Submittal of NRC Region Ii Requested Document |
ML18061A036 | 2 March 2018 | IAEA Report of the Operational Safety Review Team (Osart) Mission to the Sequoyah Nuclear Power Plant |
ML18057B045 | 26 February 2018 | NRC RO Written Exam with Answer Key and List of References (Delay Release 2 Yrs) |
RNP-RA/18-0020, Notification of Change in Licensed Operator Status | 20 February 2018 | Notification of Change in Licensed Operator Status |
ML18045A071 | 14 February 2018 | 301 Post Exam Comments |
ML18016A475 | 14 February 2018 | Memorandum Withdrawing Enforcement Guidance Memorandum (Egm) EGM-12-001 |
ML18037A441 | 12 February 2018 | Solicitation of Topics for the 2018 Organization of Agreement States Annual Meeting |
ML18037B071 | 3 February 2018 | E-Mail Approval for Credit for Sequoyah Operational Safety Review Team to the Baseline Inspection Samples/Hours |
ML18024A636 | 2 February 2018 | Summary of Meeting to Discuss Comments Received on the Use of Licensee Self-Assessment It the NRC Engineering Inspection Program |
ML18045A135 | 29 January 2018 | Final After Action Report for the August 8, 2017, McGuire Nuclear Station Full Participation Exercise |
ML17268A201 | 22 December 2017 | Memo: Status of Charters: Declaration of Plant-Referenced Simulator to Support Cold Licensing Process |
ML17356A269 | 20 December 2017 | Construction Lessons Learned Report |
BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination | 14 December 2017 | Post-Examination Documentation and Comments for Operator Retake Initial Examination |
ML17354A155 | 8 December 2017 | Department of Homeland Security, FEMA, Transmittal of the Final Exercise Report for 06/28/2017, Full Participation Plume Phase Exercise of the Offsite Radiological Emergency Response Plans Site-Specific to Browns Ferry Nuclear Power Plant |
RNP-RA/17-0079, Operator License Renewal Application | 7 December 2017 | Operator License Renewal Application |
ML17354A156 | 7 December 2017 | Radiological Emergency Preparedness Exercise, June 28, 2017 |
ML18025B420 | 30 November 2017 | 11-30-17 NRC-NEI Collaborative Effort to Identify Efficiencies in Engineering Inspections |
ML18029A020 | 2 November 2017 | E-Mail Dated November 2, 2017, from Tom Rielly, Vista 360, to John Hickman, NRC, Regarding Zion Decommissioning Funding Status |
ML17313A474 | 26 October 2017 | Transmittal of Final After Action Report for the February 22, 2017 Plume Exposure Pathway Exercise |
ML17313A476 | 26 October 2017 | Final After Action Report, Radiological Emergency Preparedness Exercise |
ML17305A059 | 18 October 2017 | Final After Action Report for Radiological Emergency Preparedness Exercise of July 11, 2017 |
ML17264A031 | 29 September 2017 | Draft Response to Task Interface Agreement 2014-05 to Licensee Oconee Design Analysis for Single Failure/Integration of Class 1E Direct Current Control Cabling in Raceways with High Energy Power Cabling |
ML17261A375 | 29 September 2017 | Memoranda: Inspections, Tests, Analyses, and Acceptance Criteria Demonstration Project Action Plan |
ML17251A285 | 25 September 2017 | Inspections, Test, Analyses and Acceptance Criteria Demonstration Project Update |
BSEP 17-0039, Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements | 15 August 2017 | Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements |
RNP-RA/17-0060, Notification of Change in Licensed Operator Status | 10 August 2017 | Notification of Change in Licensed Operator Status |
RNP-RA/17-0058, Notification of Change in Licensed Operator Status | 3 August 2017 | Notification of Change in Licensed Operator Status |
ML17209A554 | 28 July 2017 | Cycle 14 Steam Generator Tube Inspection Report |
ML17306A150 | 3 July 2017 | Collaborative Effort to Identify Efficiencies in Engineering Inspections |
ML17192A031 | 26 June 2017 | Construction Inspection and Oversight Lessons Learned |
ML17172A692 | 22 June 2017 | Section 1 - Draft Administrative Documents |
ML17172A714 | 21 June 2017 | Section 6 - Draft Administrative JPMs |
ML17172A725 | 21 June 2017 | Section 11 - Final Sim in Plant JPMs |
ML17172A727 | 21 June 2017 | Section 14 - General Correspondence |