|
---|
Category:Letter
MONTHYEARCNL-24-021, Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020)2024-11-12012 November 2024 Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020) ML24312A1552024-11-0606 November 2024 Cycle 27 Core Operating Limits Report, Revision 1 IR 05000327/20240032024-11-0606 November 2024 Integrated Inspection Report 05000327/2024003 and 05000328/2024003 CNL-24-014, License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22)2024-11-0404 November 2024 License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22) ML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-09-08
[Table view] Category:License-Operator
MONTHYEARML24213A0132024-07-31031 July 2024 301 Adams 2B ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML22322A1072022-11-18018 November 2022 2023-301 Sequoyah - Licensed Operator Retake Initial Examination Corporate Notification Letter IR 05000327/20223012022-07-21021 July 2022 Operator License Examination Report 05000327/2022301 and 05000328/2022301 ML22200A0402022-07-19019 July 2022 Exam Post Exam Comments ML22132A0282022-05-10010 May 2022 NRC Operator Licensing Examination Approval 05000327/2022301 and 05000328/2022301 ML22095A2632022-04-0505 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21286A6232021-10-13013 October 2021 301 Exam Corporate Notification Letter Aka 210-day Letter ML21111A0772021-04-20020 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20226A0972020-08-13013 August 2020 File 2B, Normal Release Exam Doc- 8-Written Exam Grading Quality Check Sheet (ES-403-1) ML20225A0242020-08-12012 August 2020 File 2A-2 Exam Final Items (Delayed Release) ML20225A0292020-08-12012 August 2020 File 2A-3 Exam Administrative Items (Delayed Release) ML20106F0992020-04-14014 April 2020 301 Final SRO Written Exam ML20106F0732020-04-14014 April 2020 301 Final RO Written Exam ML20106F0712020-03-31031 March 2020 301 Post Exam Comments ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18045A0772018-02-14014 February 2018 301 Final As-Given RO Written Exam with Answer Key - Delay Release 2 Yrs ML18045A1232018-02-14014 February 2018 301 Final As-Given SRO Written Exam with Answer Key - Delay Release 2 Yrs ML18045A0712018-02-14014 February 2018 301 Post Exam Comments ML17352B2242017-12-11011 December 2017 NRC Operator Licensing Examination Approval 05000327/2017301 and 05000328/2017301 ML17307A2832017-11-0303 November 2017 Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17263B1802017-09-20020 September 2017 Draft SRO Written Exam - Delay Release 2 Yrs ML17263B1792017-09-20020 September 2017 Draft RO Written Exam - Delay Release 2 Yrs ML17209B2092017-07-28028 July 2017 Draft Admin JPMs ML17209A9782017-07-28028 July 2017 Draft Administrative Documents ML17193A9632017-07-12012 July 2017 (Retake) 2016-302 Exam Final Items - Delay Release 2 Yrs ML17193A9652017-07-12012 July 2017 (Retake) 2016-302 Exam Administrative Items - Delay Release 2 Yrs ML17193A9612017-07-12012 July 2017 (Retake) 2016-302 Exam Draft Items - Delay Release 2 Yrs ML17125A0792017-05-0404 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16201A1192016-07-18018 July 2016 (Retake) Operator Licensing Operating Test Approval 05000327/2016302 and 05000328/2016302 ML16200A0372016-07-18018 July 2016 Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations ML16190A4252016-07-0505 July 2016 June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter ML16110A0272016-04-18018 April 2016 (Section 8) Sequoyah Initial Exam 2016-301 Final RO Written Exam ML16068A4452016-03-0303 March 2016 Operator Licensing Written Examination Approval 05000327,328/2016301 ML15293A5332015-10-20020 October 2015 Examination 05000327/2016301 and 0500328/2016301, October 15, 2015, Sequoyah Nuclear Plant - Notification of Licensed Operator ML15126A4212015-05-0606 May 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15126A4462015-05-0606 May 2015 Initial Exam 2015-301 Post Exam Comments ML15126A4452015-05-0606 May 2015 Initial Exam 2015-301 Final Administrative JPMs ML15126A4442015-05-0606 May 2015 Initial Exam 2015-301 Final Sim IN-Plant JPMs ML15126A4412015-05-0606 May 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15126A4402015-05-0606 May 2015 Initial Exam 2015-301 Final Administrative Documents ML15126A4392015-05-0606 May 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15126A4112015-05-0606 May 2015 Initial Exam 2015-301 Draft Administrative Documents ML15126A4162015-05-0606 May 2015 Initial Exam 2015-301 Draft RO Written Exam ML15126A4182015-05-0606 May 2015 Initial Exam 2015-301 Draft SRO Written Exam ML15126A4232015-05-0606 May 2015 Initial Exam 2015-301 Draft Sim IN-Plant JPMs 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24213A0132024-07-31031 July 2024 301 Adams 2B ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML22322A1072022-11-18018 November 2022 2023-301 Sequoyah - Licensed Operator Retake Initial Examination Corporate Notification Letter IR 05000327/20223012022-07-21021 July 2022 Operator License Examination Report 05000327/2022301 and 05000328/2022301 ML22200A0402022-07-19019 July 2022 Exam Post Exam Comments ML22132A0282022-05-10010 May 2022 NRC Operator Licensing Examination Approval 05000327/2022301 and 05000328/2022301 ML22095A2632022-04-0505 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21286A6232021-10-13013 October 2021 301 Exam Corporate Notification Letter Aka 210-day Letter ML21111A0772021-04-20020 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20226A0972020-08-13013 August 2020 File 2B, Normal Release Exam Doc- 8-Written Exam Grading Quality Check Sheet (ES-403-1) ML20225A0242020-08-12012 August 2020 File 2A-2 Exam Final Items (Delayed Release) ML20225A0292020-08-12012 August 2020 File 2A-3 Exam Administrative Items (Delayed Release) ML20106F0992020-04-14014 April 2020 301 Final SRO Written Exam ML20106F0732020-04-14014 April 2020 301 Final RO Written Exam ML20106F0712020-03-31031 March 2020 301 Post Exam Comments ML18045A0772018-02-14014 February 2018 301 Final As-Given RO Written Exam with Answer Key - Delay Release 2 Yrs ML18045A0712018-02-14014 February 2018 301 Post Exam Comments ML18045A1232018-02-14014 February 2018 301 Final As-Given SRO Written Exam with Answer Key - Delay Release 2 Yrs ML17352B2242017-12-11011 December 2017 NRC Operator Licensing Examination Approval 05000327/2017301 and 05000328/2017301 ML17307A2832017-11-0303 November 2017 Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17263B1802017-09-20020 September 2017 Draft SRO Written Exam - Delay Release 2 Yrs ML17263B1792017-09-20020 September 2017 Draft RO Written Exam - Delay Release 2 Yrs ML17209A9782017-07-28028 July 2017 Draft Administrative Documents ML17209B2092017-07-28028 July 2017 Draft Admin JPMs ML17193A9652017-07-12012 July 2017 (Retake) 2016-302 Exam Administrative Items - Delay Release 2 Yrs ML17193A9632017-07-12012 July 2017 (Retake) 2016-302 Exam Final Items - Delay Release 2 Yrs ML17193A9612017-07-12012 July 2017 (Retake) 2016-302 Exam Draft Items - Delay Release 2 Yrs ML17125A0792017-05-0404 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16201A1192016-07-18018 July 2016 (Retake) Operator Licensing Operating Test Approval 05000327/2016302 and 05000328/2016302 ML16200A0372016-07-18018 July 2016 Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations ML16110A0272016-04-18018 April 2016 (Section 8) Sequoyah Initial Exam 2016-301 Final RO Written Exam ML16068A4452016-03-0303 March 2016 Operator Licensing Written Examination Approval 05000327,328/2016301 ML15293A5332015-10-20020 October 2015 Examination 05000327/2016301 and 0500328/2016301, October 15, 2015, Sequoyah Nuclear Plant - Notification of Licensed Operator ML15126A4212015-05-0606 May 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15126A4462015-05-0606 May 2015 Initial Exam 2015-301 Post Exam Comments ML15126A4452015-05-0606 May 2015 Initial Exam 2015-301 Final Administrative JPMs ML15126A4412015-05-0606 May 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15126A4232015-05-0606 May 2015 Initial Exam 2015-301 Draft Sim IN-Plant JPMs ML15126A4182015-05-0606 May 2015 Initial Exam 2015-301 Draft SRO Written Exam ML15126A4162015-05-0606 May 2015 Initial Exam 2015-301 Draft RO Written Exam ML15126A4112015-05-0606 May 2015 Initial Exam 2015-301 Draft Administrative Documents ML15126A4392015-05-0606 May 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15126A4402015-05-0606 May 2015 Initial Exam 2015-301 Final Administrative Documents ML15126A4442015-05-0606 May 2015 Initial Exam 2015-301 Final Sim IN-Plant JPMs ML15092A8542015-04-0202 April 2015 Initial Exam 2015-301 Final SRO Written Exam ML15092A8482015-04-0202 April 2015 Initial Exam 2015-301 Final RO Written Exam ML14080A0292014-03-21021 March 2014 Initial Exam 2013-302 Draft Administrative Documents 2024-07-09
[Table view] |
Text
Sequoyah Nuclear Plant, Post Office Box 2000, Soddy Daisy, Tennessee 37384 January 13, 2023 10 CFR 55.5 10 CFR 55.49 Ms. Laura Dudes U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1257 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Subject:
Licensed Operator Initial Written Examination Retake
Reference:
Letter from NRC to TVA, Sequoyah Nuclear Plant - Notification of Licensed Operator Retake Initial Examination 05000327/2023301 and 05000328/2023301, dated November 18, 2022 As requested by the referenced letter, the enclosure to this letter provides the information for the Tennessee Valley Authoritys (TVAs) Sequoyah Nuclear Plant (SQN) Reactor Operator initial written examination retake scheduled to be administered the week of March 13, 2023.
As discussed during a telephone conversation on November 17, 2022 between Mr. J. Viera, NRC Senior Operations Engineer, and Mr. Aaron Forsha, SQN Lead Operations Instructor, the due date for this submittal is January 13, 2023.
There are no commitments contained in this submittal. In accordance with 10 CFR 55.49 and NUREG-1021, Operator Licensing Examination Standards for Power Reactors, appropriate measures have been taken to ensure examination integrity and security. Accordingly, it is requested that this letter and enclosed documents be withheld from public disclosure until the examinations are completed.
U.S. Nuclear Regulatory Commission Page 2 January 13, 2023 TVAs principal contact regarding the license examinations is Mr. Aaron Forsha. If you have any questions, please contact Mr. Forsha at (423) 843-4015 or Mr. Rick Medina, Site Licensing Manager, at (423) 843-8129.
Sincerely, Thomas Marshall Site Vice President Sequoyah Nuclear Plant
Enclosure:
EXAMINATION FOR REACTOR OPERATOR (RO) CANDIDATE
ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 EXAMINATION FOR REACTOR OPERATOR (RO)
CANDIDATE Written Examination - RO Portion Including Student Reference Material and Answer Key NUREG-1021 Forms:
o 1.3-1 Examination Security Agreement o
2.3-1 Examination Outline Quality Checklist o
2.3-4 Written Examination Quality Checklist
m CJ)
I......
w
""CJ
- 0)
<O (1)
CX) a 0::,
Cit/t'I P £x.kA1 I of.1-Form 1.3-1 Examination Security Agreement (1)
Preexamination I acknowledge that I have acquired specialized knowledge about the U.S. Nuclear Regulatory Commission (NRC) licensing examinations scheduled for the week(s) of fllAL. "Zo'l,$
as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until the completion of examination administration, except as specifically noted below or authorized by the NRC. Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations, an enforcement action by the NRC against me or the facility licensee, or both. I will immediately report to facility licensee management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
(2)
Postexamination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of L.//3/18
. From the date that I entered into this examination security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below or authorized by the NRC.
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
11 12 13 NO*-~*
e Jo' -*
G
G
- 1-j-..
,AJof"E, :1.
Note 5l&AJ'30 OF Pel @1'1"1L- r::P-"f
m
(/)
I
....>. w "U
Q)
(.Q (1)
CXl 0....
O':)
CA'P-P EM'M Z o-F _3:_
Form 1.3-1 Examination Security Agreement (1)
Preexamination I acknowledge that I have acquired specialized knowledge about the U.S. Nuclear Regulatory Commission (NRC) licensing examinations scheduled for the week(s) of mAR. Zot:s as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until the completion of examination administration, except as specifically noted below or authorized by the NRC. Furthermore, 1 am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations, an enforcement action by the NRC against me or the facility licensee, or both. 1 will immediately report to facility licensee management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
(2)
Postexamination To the best of my knowledge, I did not divulge to a7 unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of t./ g{ Z.'3. From the date that I entered into this examination security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below or authorized by the NRC.
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13. I fL NOTES:
Print Name S P0
Job Title Signature (1)
Date
/14.,,/#6,qe.
()
fcyt. (JD'i.5
ES-2.1, Page 17 of 20 Form 2.1-1 Examination Preparation Checklist Facility: ___________________________________
Date of Examination: __________
Developed by: Written:
Facility NRC
//
Operating:
Facility NRC Target Date*
Task Description Chief Examiners Initials
-240 1.
Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
-210 2.
NRC examiners and facility licensee contact assigned (B.1 and C.1-3).
-210 3.
Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
-210 4.
Reference material due for NRC-prepared examinations (F).
-210 5.
Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).
-195 6.
Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).
-150 7.
Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
-136 8.
Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).
-100 9.
NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).
-75
- 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
-60
- 11. Preliminary waiver/excusal requests due (ES-2.2 E.1).
-50
- 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
-50
- 13. Examination review results discussed between the NRC and the facility licensee (B.14).
-35
- 14. Examination preparatory week conducted by the NRC and the facility licensee (I).
-30
- 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).
-14
- 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
-7
- 17. Written examinations and operating tests approved by the NRC supervisor (C.9)
-7
- 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).
-7
- 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
-7
- 20. Written examination administration guidelines reviewed with the facility licensee (D.14).
-7
- 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
- Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
Form 2.3-1 Examination Outline Quality Checklist Facility: Sequoyah Date of Examination: 2023 Item Task Description (Y)es / (N)o a
b*
c#
WRITTEN
- a. The outline was systematically and randomly prepared in accordance with the instructions in Section B of ES-4.1, and all knowledge and ability (K/A) categories are appropriately sampled.
Y Y
- b. The outline does not overemphasize any systems, evolutions, or generic topics.
Y NA Y
- c. Justifications for deselected or rejected K/A statements are acceptable.
Y NA Y
SIMULATOR
- a. Using Form 3.4-1, Events and Evolutions Checklist, verify that the proposed scenario set contains the required number of normal evolutions, reactivity evolutions, instrument and component failures, manual control evolutions, technical specifications, and major transients.
N A
NA NA
- b. There are enough scenarios (and spares) for the projected number and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity. Ensure that scenarios will not be repeated on subsequent days.
N A
NA NA
- c. Ensure that all scenarios are new or significantly modified in accordance with ES-3.4 and that no scenarios are duplicated from the applicants audit test(s).
N A
NA NA
- d. To the extent possible, assess whether the outline(s) conforms with the qualitative and quantitative simulator set criteria specified on Form 2.3-2.
N A
NA NA JPMS
- a. Verify that the administrative outline meets the criteria specified in the instructions on Form 3.2-1 and that no tasks are duplicated from the applicants audit test(s).
N A
NA NA
- b. Verify that the control room and in-plant systems outline meets the criteria specified in the instructions on Form 3.2-2 and that no tasks are duplicated from the applicants audit test(s).
N A
NA NA
- c. Determine whether the number of job performance measures (JPMs) and JPM types is sufficient for the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
N A
NA NA GENERAL
- a. Assess whether the appropriate exam sections cover plant-specific priorities (including probabilistic risk assessment and individual plant examination insights).
Y NA Y
- b. Assess whether the 10 CFR 55.41, 10 CFR 55.43, and 10 CFR 55.45 sampling is appropriate.
Y NA Y
- c. Check whether K/A importance ratings (except for plant-specific priorities) are greater than or equal to 2.5.
Y NA Y
- d. Check for duplication and overlap across the exam and with the last two NRC exams.
Y NA Y
- e. Check the entire exam for balance of coverage.
Y NA Y
- f. Assess whether the exam fits the appropriate job level (reactor operator or senior reactor operator).
Y NA Y
Printed Name/Signature Date
- a. Author
___Mark A, Bates / __Mark A. Bates_______________________11/14/2022_____
- b. Facility Reviewer (*)
____N/A_______________________________________________________
- c. NRC Reviewer (#)
_Michael Kennard / Michael Kennard________ _________ 11/14/22 ______
NRC Chief Examiner ___Michael Kennard_/ _ Michael Kennard___________________11/14/22___
NRC Supervisor
__Thomas A. Stephen / Thomas A. Stephen 11/14/22_______
- The facility licensee signature is not applicable for NRC-developed tests.
- An independent NRC reviewer performs the steps in column c. This may be the NRC Chief Examiner if he/she did not develop the outline under review.
ES-5.1, Page 8 of 20 Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility:
Dates of Examination:
Activity Description Date Complete 1.
- Received postexamination package from facility licensee and verified complete. (ES-4.4) 2.
- Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 3.
- Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.
(ES-3.6) 4.
- Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 5.
Completed licensing official review.
6.
Mailed licenses, preliminary results, and pass letters.
7.
Notified facility licensee of results.
8.
Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).
9.
Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.
- 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
- Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.