ML23065A070 CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD Digitally signed by Bruno L. Caballero Bruno L. Caballero Date: 2022.11.22 12:59:39 -05'00' Digitally signed by Bruno L. Caballero Bruno L. Caballero Date: 2022.11.22 13:00:17 -05'00' Digitally signed by Thomas A. Stephen Date: 2022.11.22 13:48:47 -05'00'

CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD

CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD Digitally signed by Bruno L. Caballero Bruno L. Caballero Date: 2022.11.22 13:14:43 -05'00' Digitally signed by Bruno L. Caballero Bruno L. Caballero Date: 2022.11.22 13:15:16 -05'00' Digitally signed by Thomas A. Stephen Date: 2022.11.22 13:52:06 -05'00'

CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD

CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD Digitally signed by Bruno L. Caballero Bruno L. Caballero Date: 2022.11.22 13:15:49 -05'00' Digitally signed by Bruno L. Caballero Bruno L. Caballero Date: 2022.11.22 13:16:18 -05'00' Digitally signed by Thomas A. Stephen Date: 2022.11.22 13:52:52 -05'00'

CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD CMD Digitally signed by Bruno L. Caballero Bruno L. Caballero Date: 2022.11.22 13:04:31 -05'00' Digitally signed by Bruno L. Caballero Bruno L. Caballero Date: 2022.11.22 13:05:13 -05'00' Digitally signed by Thomas A. Stephen Date: 2022.11.22 13:54:17 -05'00'

Enclosures Contain Personally Identifiable Information John A. Krakuszeski Withhold in Accordance with 10 CFR 2.390(a)(6) Vice President Brunswick Nuclear Plant 8470 River Rd SE Southport, NC 28461 o: 910.832.3698 Serial: RA-22-0293 U. S. Nuclear Regulatory Commission, Region II ATTN: Ms. Laura Dudes, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Preliminary Reactor Operator and Senior Reactor Operator License Applications

Reference:

Letter from Thomas A. Stephen (NRC) to John Krakuszeski (Duke Energy),

Dear Ms. Dudes,

In accordance with the schedule contained in the April 11, 2022, NRC letter (i.e., Reference), Duke Energy Progress, LLC (Duke Energy), is submitting preliminary reactor operator and senior reactor operator license applications and medical certifications for individuals participating in the operating test, scheduled to be administered during the weeks of December 5 and December 12, 2022, the week of January 9, 2023, and, if necessary, the week of January 16, 2023, and the written examination, scheduled to be administered the week of December 19, 2022, at the Brunswick Steam Electric Plant. Submittal of these preliminary applications and medical certifications is required at least 30 days before the first examination date. provides preliminary, unsigned license applications for each applicant (i.e., NRC certifications for each applicant (i.e., NRC Form 396, "Certification of Medical Examination by Facility Licensee"). Enclosure 3 provides physician letters for applicants, as appropriate.

Duke Energy requests that the information in the enclosures to this letter be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since disclosure of this information would constitute a clearly unwarranted invasion of personal privacy.

This document contains no regulatory commitments.

Enclosures Contain Personally Identifiable Information Withhold in Accordance with 10 CFR 2.390(a)(6)

U. S. Nuclear Regulatory Commission, Region II Page 3 of 3 cc (with Enclosures):

Document Control Desk, NRC Mr. Bruno Caballero, NRC Chief Examiner cc (without Enclosures):

Mr. Thomas A. Stephen, NRC Chief, Operations Branch, Region II Mr. Luke Haeg, NRC Project Manager Mr. Gale Smith, NRC Senior Resident Inspector Chair - North Carolina Utilities Commission

RA-22-0293 Enclosure 1 Personally Identifiable Information Withhold in Accordance with 10 CFR 2.390(a)(6)

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Preliminary NRC Form 398, "Personal Qualification Statement - Licensee"

Enclosures Contain Personally Identifiable Information John A. Krakuszeski Withhold in Accordance with 10 CFR 2.390(a)(6) Vice President Brunswick Nuclear Plant 8470 River Rd SE Southport, NC 28461 o: 910.832.3698 Serial: RA-22-0321 U. S. Nuclear Regulatory Commission, Region II ATTN: Ms. Laura Dudes, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Final Reactor Operator and Senior Reactor Operator License Applications

References:

1. Letter from Thomas A. Stephen (NRC) to John Krakuszeski (Duke Energy),
2. Letter from John A. Krakuszeski (Duke Energy) to Laura Dudes (NRC),

Preliminary Reactor Operator and Senior Reactor Operator License Applications, dated November 3, 2022.

Dear Ms. Dudes,

In accordance with the schedule contained in the April 11, 2022, NRC letter (i.e., Reference), Duke Energy Progress, LLC (Duke Energy), is submitting signed reactor operator and senior reactor operator license applications and copies of medical certifications for individuals participating in the operating test, scheduled to be administered during the weeks of December 5 and December 12, 2022, the week of January 9, 2023, and, if necessary, the week of January 16, 2023, and the written examination, scheduled to be administered the week of December 19, 2022, at the Brunswick Steam Electric Plant. Submittal of these signed applications and medical certifications is required at least 14 days before the first examination date. provides signed license applications for each applicant (i.e., NRC Form 398, certifications for each applicant (i.e., NRC Form 396, "Certification of Medical Examination by Facility Licensee"). Enclosure 3 provides physician letters for applicants, as appropriate. The signed originals of the documents contained in Enclosures 2 and 3 were previously submitted with Reference 2.

Duke Energy requests that the information in the enclosures to this letter be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since disclosure of this information would constitute a clearly unwarranted invasion of personal privacy.

Enclosures Contain Personally Identifiable Information Withhold in Accordance with 10 CFR 2.390(a)(6)

U. S. Nuclear Regulatory Commission, Region II Page 3 of 3 cc (with Enclosures):

Document Control Desk, NRC Mr. Bruno Caballero, NRC Chief Examiner cc (without Enclosures):

Mr. Thomas A. Stephen, NRC Chief, Operations Branch, Region II Mr. Luke Haeg, NRC Project Manager Mr. Gale Smith, NRC Senior Resident Inspector Chair - North Carolina Utilities Commission

RA-22-0321 Enclosure 1 Personally Identifiable Information Withhold in Accordance with 10 CFR 2.390(a)(6)

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 NRC Form 398, "Personal Qualification Statement - Licensee"

U. S. Nuclear Regulatory Commission, Region II Page 2 of 2 cc (with enclosure):

Document Control Desk, NRC Mr. Bruno Caballero, NRC Senior Operations Engineer, Region II Mr. Thomas A. Stephen, NRC Chief, Operations Branch, Region II Mr. Luke Haeg, NRC Project Manager Mr. Gale Smith, NRC Senior Resident Inspector Chair - North Carolina Utilities Commission

RA-22-0615 Enclosure List of Post-Examination Documentation The following documents are being provided via a secure FTP website.

1. Graded Written Examinations and Applicants Answer Sheets
2. Master Examination and Answer Key
3. Applicants Questions Asked and Answers Given During the Written Examination
4. Post Exam Comments-None
5. Written Examination Seating Chart
6. Written Examination Performance Analysis Results