Radiation Safety Baseline Inspection RFI 2020-001
ML19346G721
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/12/2019
From: Jonathan Rivera
NRC/RGN-II
To: Merritt Baker
NRC/RGN-II
References
IR 2020001
Download: ML19346G721 (6)


Text

ML19346G721 Turkey Point Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2020-001 During the week of February 3 - 7, 2020, the NRC will perform a baseline Radiation Safety Inspection at Turkey Point Nuclear Plant, Units 3 and 4 (NRC Inspection Procedures 71124.06, 71124.07, and 71151). Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than Friday, January 24, 2020.

If there are any questions about this inspection or the material requested, please contact the lead inspector, Jonathan Rivera at 404-997-4646, or the Engineering Branch 3 Chief, Brian Bonser, at 404-997-4653.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html.

PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.

1

Document Request List Inspection Dates: February 3 - 7, 2020 Documents Due to Region II by: January 24, 2020 Inspection Procedures (IPs): IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment IP 71124.07 Radiological Environmental Monitoring Program (REMP)

IP 71151 Performance Indicator Verification (Public Radiation Safety Cornerstone)

Lead Inspector: Jonathan Rivera Health Physicist U.S. NRC Region II 404-997-4646 Jonathan.Rivera@nrc.gov Note: The current version of these documents is expected unless specified otherwise.

Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. Experience has shown that a poorly organized CD leads to a less efficient inspection, and places additional burden on licensee staff.

Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.

Miscellaneous

1. List of primary contacts for each inspection area w/phone numbers
2. Corrective action program procedure(s) 71124.06 - Radioactive Gaseous and Liquid Effluent Treatment (Last inspected February 2018)
1. Copy of Offsite Dose Calculation Manual (ODCM) and a list of changes made in the latest revision
2. List of permitted effluent release points, including any release points from onsite surface water bodies (as applicable)
3. Procedures for the following:

(a) collection, analysis, release, and dose evaluations for gaseous and liquid effluents (b) determination of set-points for main plant gaseous and liquid effluent discharge pathways

4. Simplified diagram of liquid and gaseous waste processing systems
5. List of liquid and gaseous effluent monitors listed as out-of-service (OOS) for > 1 day since February 2018, including any special reports submitted to the NRC as a result of effluent monitor operability 2
6. The last two calibration records for the following effluent monitors, including flow instrument calibrations:

(a) U3/4 Containment Air Particulate R3-11 and R4-11 (b) U3/4 Containment Radioactive Gas R3-12 and R4-12 (c) U3/4 Spent Fuel Puel (SFP) Vent RAD-6418 (e) U3/4 Plant Vent Gas R-14 & RAD-6304 (d) Liquid Waste Disposal System R-18

7. The last two inter-laboratory comparison program results for the count lab
8. The last two surveillances performed on the HEPA/charcoal trains (in-place filter tests and charcoal tests) for the U3/4 containment and auxiliary buildings
9. The last two gaseous effluent release permits and the last two liquid effluent release permits
10. Most recent audit, self-assessment, and/or review of the radioactive effluent release and monitoring program
11. List of condition reports (CRs) generated since February 2018 as a result of gaseous and liquid effluent processing and/or ODCM related activities. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.

71224.07 - Radiological Environmental Monitoring Program (REMP)

(Last inspected February 2018)

1. Collection schedule for REMP samples during the week of inspection
2. Procedures for:

(a) collection and analysis of environmental samples (b) calibration and maintenance of REMP air and/or water samplers (c) calibration of meteorological monitoring instruments (wind speed & direction, air temperature, etc.)

(d) periodic meteorological instrumentation surveillance requirements (e) groundwater monitoring program

3. The last two calibration records for REMP air and composite water sampling equipment (as applicable)
4. The last two calibration records for each meteorological monitoring instrument on the primary tower (wind speed, wind direction, and air temperature)
5. List of changes to the REMP program (sample locations, sample frequency, type of samples etc.) since February 2018
6. The last two inter-laboratory comparison program results for the environmental lab
7. List of systems, structures, or components (SSCs), identified as credible mechanisms for the potential release of licensed material to the groundwater
8. List of any non-radioactive systems that have become contaminated since February 2018
9. Copies of any reports to the NRC (via 10 CFR 50.72 or other reporting requirements) regarding abnormal onsite spills/leaks of radioactive material since February 2018
10. List of 10 CFR 50.75(g) entries made since February 2018
11. Recent results of the groundwater monitoring program (last two quarters)
12. Most recent audit, self-assessment, and/or review of REMP activities
13. Most recent audit of lab used to process REMP samples
14. List of CRs generated since February 2018 as a result of REMP related activities.

Include all CRs related to voluntary reporting of onsite spills/leaks of radioactive material.

This should be a list of corrective action documents containing a CR number and brief description, not full CRs.

3

71151 - Performance Indicator Verification (Public Cornerstones)

(Last inspected April 2019)

1. Procedure for gathering and reporting PI data
2. Monthly evaluations of effluent dose to the public since April 2019
3. Most recent gaseous and liquid effluent evaluation of dose to the public (year-to-date doses) 4

From: Rivera, Jonathan To: Baker, Milissa

Subject:

FW: Turkey Point RFI for February 2020 RP inspection.

Date: Thursday, December 12, 2019 4:06:21 PM Attachments: Turkey Point RP RFI 2020.pdf Hi Milissa, I understand you are the one to send document requests to for upload into ADAMS? See attached request for information (RFI) that I sent to Turkey Point earlier this week. Let me know if you have any questions.

Thanks, Jonathan Jonathan Rivera Health Physicist Engineering Branch 3 Division of Reactor Safety U.S. NRC - Region II Office: 404-997-4646 Email: jonathan.rivera@nrc.gov From: Rivera, Jonathan Sent: Wednesday, December 11, 2019 5:11 PM To: 'stavroula.mihalakea@fpl.com' <stavroula.mihalakea@fpl.com>

Cc: Loo, Wade <Wade.Loo@nrc.gov>

Subject:

Turkey Point RFI for February 2020 RP inspection.

Stavy, Please find attached the RFI for upcoming RP inspection. Inspectors will be myself and Wade Loo. I am requesting a response by Friday, January 24, 2020.
Thanks, Jonathan Jonathan Rivera Health Physicist Engineering Branch 3 Division of Reactor Safety U.S. NRC - Region II Office: 404-997-4646 Email: jonathan.rivera@nrc.gov