|
---|
Category:Letter
MONTHYEARML24038A0322024-02-0707 February 2024 (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07
[Table view] Category:Licensee Response to Enforcement Action
MONTHYEARML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML23044A5772023-02-13013 February 2023 (VCSNS) Unit 1, Readiness for 95001 Supplemental Inspection; EA-22-039 2024-01-22
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML23044A5772023-02-13013 February 2023 (VCSNS) Unit 1, Readiness for 95001 Supplemental Inspection; EA-22-039 ML22322A0882022-11-17017 November 2022 (Vcsns), Unit 1 - Reply to a Notice of Violation; EA-22-039 ML22236A1172022-08-22022 August 2022 (Vcsns), Unit 1 - Response to an Apparent Violation (EA-22-039) ML22200A2862022-07-19019 July 2022 (Vcsns), Unit 1 - Pre-Decisional Reply to Apparent Violation 05000395/2022001-01 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-16-0173, Reply to Notice of Violation2016-12-20020 December 2016 Reply to Notice of Violation ML13252A2402013-09-0505 September 2013 Reply to Notice of Violation, EA-13-106, IR 05000395-13-009 ML1102100392010-11-22022 November 2010 Reply to Notice of Violation EA-10-204, NRC IR 05000395-10-004 RC-06-0111, Reply to Notice of Violation: EA-06-046 NRC Inspection Report 2006-0112006-06-0101 June 2006 Reply to Notice of Violation: EA-06-046 NRC Inspection Report 2006-011 RC-05-0034, Response to Preliminary White Finding, NRC Inspection Report 2005006, Apparent Violation AV 05000395/2005006-022005-02-23023 February 2005 Response to Preliminary White Finding, NRC Inspection Report 2005006, Apparent Violation AV 05000395/2005006-02 RC-01-0218, Revised Response to Unresolved Issue (URI) No. 50-395/01-09-01, RC-01-2182004-02-10010 February 2004 Revised Response to Unresolved Issue (URI) No. 50-395/01-09-01, RC-01-218 RC-01-1839, Response to IR 05000395/2001-009. Provides Comments in Response to Identified Finding on Lack of Operator Training for Entry Into Fire Protection Procedures2002-01-0909 January 2002 Response to IR 05000395/2001-009. Provides Comments in Response to Identified Finding on Lack of Operator Training for Entry Into Fire Protection Procedures 2024-01-22
[Table view] |
Text
V.C. Summer Nuclear Station Bradham Blvd & Hwy 215, Jenkinsville, SC 29065 Mailing Address:
i; Dominion
~ Energy P.O. Box 88, Jenkinsvi ll e, SC 29065 Dominion Energy.com February 13, 2023 Document Control Desk Serial No.: 23-035 U.S. Nuclear Regulatory Commission VCS-LIC/JB: RO Washington, DC 20555 Docket No. : 50-395 License No.: NPF-12 DOMINION ENERGY SOUTH CAROLINA (DESC)
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 READINESS FOR 95001 SUPPLEMENTAL INSPECTION; EA-22-039 By letter dated October 18, 2022 (Reference 1), the Nuclear Regulatory Commission (NRC) notified Dominion Energy South Carolina (DESC) of a Notice of Violation (NOV 05000395/2022001-01) and associated White Finding . In Reference 1, the NRC informed
- DESC of plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area." DESC is prepared to support the NRC 95001 Inspection the week of March 20, 2023.
Should you have any questions or require additional information, please contact Mr.
Michael Moore, Manager Nuclear Station Licensing at (803) 345-4752 .
Sincerely, Justice Site Vice President VC Summer Nuclear Station
Reference:
- 1. Letter from Laura A. Dudes (NRC) to Daniel G. Stoddard (DESC), "Virgil C.
Summer-Final Significance Determination of a White Finding and Notice of Violation and Assessment Follow-up Letter; NRC Inspection Report 05000395/2022091," dated October 18, 2022. (ML22287A184)
Commitments contained in this letter: None cc: G. J. Lindamood - Santee Cooper L. Dudes - NRC Region II D. Dumbacher - NRC Region II G. E. Miller - NRC Project Mgr.
NRC Resident Inspector