REVISION NO.: PROCEDURE TITLE: PAGE:

8A LOSS OF EMERGENCY COOLANT RECIRCULATION 8 of 120 PROCEDURE NO.:

3-EOP-ECA-1.1 TURKEY POINT UNIT 3 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

4. Determine Containment Spray Requirements (Suction From RWST)
a. Containment Spray Pump Suction - a. Go to Step 5.

ALIGNED TO RWST

b. Determine number of Containment Spray Pumps required from Table 1:

Table 1 Containment Spray Pumps Required EMERGENCY SPRAY CONTAINMENT CONTAINMENT RWST LEVEL PUMPS PRESSURE COOLERS REQUIRED RUNNING GREATER THAN


2 55 PSIG GREATER THAN 0 OR 1 2 BETWEEN 20 PSIG 155,000 GALLONS AND 55 PSIG 2 1 LESS THAN 20 PSIG ---- 0 GREATER THAN


2 55 PSIG BETWEEN 60,000 GALLONS 0 OR 1 1 BETWEEN 20 PSIG AND AND 55 PSIG 155,000 GALLONS 2 0 LESS THAN 20 PSIG ---- 0 LESS THAN N/A ---- 0 60,000 GALLONS