ML21123A302

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8A LOSS OF EMERGENCY COOLANT RECIRCULATION 8 of 120 PROCEDURE NO.:

3-EOP-ECA-1.1 TURKEY POINT UNIT 3 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

4.

Determine Containment Spray Requirements (Suction From RWST)

a. Containment Spray Pump Suction -

ALIGNED TO RWST

a.

Go to Step 5.

b. Determine number of Containment Spray Pumps required from Table 1:

Table 1 Containment Spray Pumps Required RWST LEVEL CONTAINMENT PRESSURE EMERGENCY CONTAINMENT COOLERS RUNNING SPRAY PUMPS REQUIRED GREATER THAN 155,000 GALLONS GREATER THAN 55 PSIG 2

BETWEEN 20 PSIG AND 55 PSIG 0 OR 1 2

2 1

LESS THAN 20 PSIG 0

BETWEEN 60,000 GALLONS AND 155,000 GALLONS GREATER THAN 55 PSIG 2

BETWEEN 20 PSIG AND 55 PSIG 0 OR 1 1

2 0

LESS THAN 20 PSIG 0

LESS THAN 60,000 GALLONS N/A 0