ML21123A302
Jump to navigation
Jump to search
| ML21123A302 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/03/2021 |
| From: | Florida Power & Light Co |
| To: | NRC/RGN-II |
| References | |
| Download: ML21123A302 (81) | |
Text
REVISION NO.:
PROCEDURE TITLE:
PAGE:
8A LOSS OF EMERGENCY COOLANT RECIRCULATION 8 of 120 PROCEDURE NO.:
3-EOP-ECA-1.1 TURKEY POINT UNIT 3 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED
- 4.
Determine Containment Spray Requirements (Suction From RWST)
- a. Containment Spray Pump Suction -
ALIGNED TO RWST
- a.
Go to Step 5.
- b. Determine number of Containment Spray Pumps required from Table 1:
Table 1 Containment Spray Pumps Required RWST LEVEL CONTAINMENT PRESSURE EMERGENCY CONTAINMENT COOLERS RUNNING SPRAY PUMPS REQUIRED GREATER THAN 155,000 GALLONS GREATER THAN 55 PSIG 2
BETWEEN 20 PSIG AND 55 PSIG 0 OR 1 2
2 1
LESS THAN 20 PSIG 0
BETWEEN 60,000 GALLONS AND 155,000 GALLONS GREATER THAN 55 PSIG 2
BETWEEN 20 PSIG AND 55 PSIG 0 OR 1 1
2 0
LESS THAN 20 PSIG 0
LESS THAN 60,000 GALLONS N/A 0