IR 05000454/1984051

From kanterella
Revision as of 00:42, 22 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-454/84-51 & 50-455/84-35.Review on Some Util Responses to Notice of Violation Clarified
ML20128B778
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 06/18/1985
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20128B780 List:
References
NUDOCS 8507030348
Download: ML20128B778 (3)


Text

_

  • >

e pS K8 Gq UNITED STATES

NUCLEAR REGULATORY COMMisslON

'% 4 REGION lli

[ #

S

Tr, ? 799 ROOSEVELT RO AD

'f 0, GLEN ELLYN. ILLINOts 60137

% . . . . . * '[ JUN 181983 .

Docket No. 50-454 Docket No. 50-455 Docket No. 50-456 Docket No. 50-457 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

Thank you for your letter dated May 10, 1985, infonning us of the steps you have taken to correct the violations which we brought to your attention in our letter dated April 3,198 While our inspection revealed that you have taken acceptable actions to correct the problems, we offer the following comments to clarify our review on some of your responses to the Notice of Violation:

Attachment A Item 2.b:

Relative absorbingtomaterial the rubbing)within (EAM enclosure the pipe whip restraint structures, energy the interference would possibly have caused the compression leg to bind up inside the enclosures and result in localized structural deformatio Item Regarding your statement that the test data initially received from the EAM manufacturer did not indicate strength reduction due to height to width (H/W) ratios of two or less, or due to stacking, our review identified that: (1) the Hexcel H/W report dated l August 25, 1981, for 4000 psi EAM indicated that one of the two l pieces of EAM tested with a H/W ratio of two showed that the specimen l started to buckle, and (2) the Hexcel EAM stacking test report dated l

June 16, 1982, for 1000 psi EAM indicated that the three (2" high X 4" wide X 4" long) pieces of EAM that were stacked provided H/W ratio of only 1.5.

l Item Regarding your statement that the EAM retaining box does not affect l

the EAM crush strength during EAM deformation because the retainer box has been provided with sufficient clearance, our inspection l

revealed EAM installed in retaining boxes without any clearance on l one side of the box. We also offer that the amount of clearance considered by you to be sufficient was not defined in the design criteria.

l 8507030348 850618 PDR ADOCK 05000454 G PDR g i

4 0/

.

'

o

.

,

Comonwealth Edison Company 2 JUN 181985 Attachment B Item 1: Regarding your statement that the NRC reviewed and accepted the qualification tests conducted for the large bore Boeing steam generator snubber re-design and modification, although the Region III review concluded that the results of all tests performed were acceptable, the life cycle test was not consistent with the original test requirement Your response indicated that you plan to have ITT-Grinnell functionally test each Boeing snubber following assembly after modification. We request that you provide us an opportunity to review the test procedures in advance of the tests, and that you notify us sufficiently in advance of the tests to allow us to make arrangements to observe the test setups and testing. Please provide all information related to these matters to Mr. D. Danielson (790-5610)

or Mr. J. Harrison (790-5635) of my staf Should you have any questions, please contact this offic Whm% ye r-R. L. Spessard, Director Division of Reactor Safety cc: D. L. Farrar, Director of Nuclear Licensing M. Wallace, Project Manager D. Shamblin, Construction Superintendent J. F. Gudac, Station Superintendent C. W. Schroeder, Licensing and Compliance Superintendent V. I. Schlosser, Project Manager Gt;nner Sorensen, Site Project Superintendent R. E. Querio, Plant Manager

.

Commonwealth Edison Company 3 JUN 181985 cc w/ltr dtd 05/10/85:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII, Braidwood Resident Inspector, RIII, Byron W. L. Paton, ELD L. Olshan, LPM, NRR Phyllis Dunton, Attorney General's Office, Environmental Control Division D. W. Cassel , Jr. , Es J. W. McCaffrey, Chief, Public Utilities Division H. S. Taylor, Quality Assurance Division Diane Chavez, DAARE/ SAFE RIII RI I RIE

,

RMg R& tw Yin /jk Da on Harrison Forney . P

'

Q (1

3 elke 06/17/

-RIII ter Spe ard S{r

i l

j l

_ _

__ _ . - , _ _ . . _ - -