ML20134M952

From kanterella
Revision as of 10:02, 14 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Forwards Request for Addl Info on 850426 Submittal Re Functional & Task Analysis.Info Necessary to Permit Completion of Review.Response Requested within 60 Days of Ltr Receipt
ML20134M952
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/30/1985
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Koester G
KANSAS GAS & ELECTRIC CO.
References
TAC-57368, NUDOCS 8509040356
Download: ML20134M952 (4)


Text

_-

AUG 3 01985 Docket No.: 50-482 Mr. Glenn L. Koester Vice President - Nuclear Kansas Gas and Electric Company 201 North Market Street Post Office Box 208 Wichita, Kansas 67201

Dear Mr. Koester:

Subject:

Request- for Additional Information Regarding Functional and Task Analysis The NRC staff is continuing its review of KG&E's Functional and Task Analysis submitted by letter dated April 26, 1985 and a supplement thereto dated May 28, 1985. The information requested in the enclosure is necessary to permit the staff to complete its review.

Please provide the requested information within 60 days of your receipt of this letter.

Sincerely.

(s)

B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing

Enclosure:

As stated cc: See next page DISTRIBUTION:

'NRC'PDR~~

N *4 Local PDR PRC System NSIC LB#1 R/F-MRushbrook P0'Connor TAlexion OELD ACRS(16)

JPartlow BGrimes EJordan LB#1/DL: LB#1/DLf# LB .

P0'Connor/mac' TAlexion d BJb jblood 8 /1.9 /85 g /g /85 { .

85 8509040356 850830 PDR ADOCK 0500 4 2"

Mr. Glenn L. Koester Wolf Creek Generating Station Kansas Gas and' Electric Company Unit No. 1 4

CC* -

'~

, Mr. Nicholas A. Petrick Ms. Wanda Christy t

Executive Director, SNVPPS 515 N. 1st Street

^

t 5 Choke Cherry Road Burlington, Kansas 66839 Rockville, Maryland 20850 C. Edward Peterson, Esq.

Jay Silberg, Esq. Legal Division Shaw, Pittman, Potts & Trowbridge Kansas Corporation Commission 1800 M Street, NW State Office Building, Fourth Floor

. Washington, D.C. 20036 Topeka, Kansas 66612 Mr. Donald T. McPhee John M. Simpson, Esq.

t _.'...-

Vice-President - Production Attorney for Intervenors _.. .

4 Kansas City Power & Light Company 4350 Johnson Drive, Suite 120 1330 Baltimore. Avenue . Shawnee Mission, Kansas 66205 '

~ Kansas City, Missouri 64141

~

-~

. . . . Regional Administrator, Region IV 9

~-~2"- Ms. Mary Ellen Salva, .U.S. Nuclear Regulatory Comission Route'1, Box 56 Office of Executive Director Burlington, Kansas 66839 for Operations 611 Ryan Plaza Drive, Suite 1000 A. Scott Cauger. Arlington, Texas 76011

, 'Attistant General Counsel 4

Public Service Commission Mr. Allan Mee i ,

P. 0. Box 360 .

Project Coordinator Jefferson City, Missouri 65101 Kansas Electric Power Cooperative,Inc.

P. O. Box 4877 Resident Inspector / Wolf Creek NPS Gage Center Station c/o U.S. Nuclear Regulatory Comission Topeka, Kansas 66604

- ~! P. O. Box 311

' ~

Burlington, Kansas 66893 Regional Administrator, Region III l U.S. Nuclear Regulatory Comission

7 '

Mr. Robert M. Fillmore 799 Roosevelt Road

! ~. State Coporation Commission Glen Ellyn, Illinois 60137

! _. State of Kansas ,

i Fourth Floor, State Office Building Brian P. Cassidy, Regional Counsel Topeka, Kansas 66612 Federal Emergency Management Agency

, Region I , 1 i'

J. W. McCormack POCH-Boston, Massachusetts 02109 t

N.

-3 l - :

I i-

o .

I Kansas Gas and Electric Company Wolf Creek Generating Station Unit No. 1 i l

cc:

Terri Sculley, Director  :

Special Projects Division .

Kansas Corporation Commission State Office Building, Fourth Floor Topeka, Kansas 66612 Mr. Gerald Allen Public Health Physicist Bureau of Air Quality 1 Radiation Control Division of Environment t

Kansas Department of Health

~^ '

2- and Environment

~~

Forbes Field Building 321 Topeka, Kansas - 66620 .

~~. 1, . . . .

Senior Resident-Inspector / Wolf Creek NPS i -

c/o U.S.-Nuclear Regulatory Commission -

"~

. P. O. Box 311 Burlington, Kansas 66839 e

M M S o

=

'1 l

- - j

O e ENCLOSURE WOLF CREEK GENERATING STATION REQUEST FOR ADDITIONAL INFORMATION .

FUNCTIONAL AND TASK ANALYSIS .

The staff's review indicates that KG&E has satisfactorily described the process which it used to conduct a function and task analysis for deriving the instru-mentation and control characteristics from Revision 1 of the ERGS and related background infomation. However, you did not describe and justify, as part of your PGP, potentially safety-significant information and control deviations from the ERGS or. indicate that there were no deviations. Based on our review we conclude that KG&E should provide the following information within 60 days

' of receipt of this letter:

1. Describe and justify, as part of the plant-specific technical guide-lines' portion of the PGP, Findings 1, 6, 8, 9, and 10 contained in the Task Analysis Final Report and clarification letter dated May 24, n- ~ . . 1985, as potentially safety-significant deviations from the generic

-technical guidelines.

2. Describe and justify, as part of the plant-specific technical guide-lines portion of the PGP, the eight EMGs (the licensee's identifi-cation for E0Ps) related to Finding 9 of Task Analysis Final Report as potentially safety-significant deviations.
3. Review its methods for identifying potentially safety-significant,

. plant-specific technical deviations from the generic technical guide-lines and deviations from ths generic instrumentation and control

_ characteristics to determine whether or not additional potentially safety-significant deviations exist. Describe and justify, in the plant-specific technical guidelines portion of the PGP, any addition-al, potentially safety-significant deviations or indicate that none exist as a result of its review.

~

4. The PGP should be modified to state that the task analysis for the

! - E0P Upgrade Program was described as part of the DCRDR.

5. Describe, as part of Finding 10 of the Task Analysis Final Report, the operator actions that will be taken at Wolf Creek, other than observation of SG water level, to identify the SG having a ruptured tube. Limiting operator action times should be included. Also, the the radiation detectors and their location in the main steam system, the emergency feedwater turbine exhaust and, in the SG blowdown system, should be described. '

T {~

.n,. .- y.- ,, -w, e,n -

-.,.e , y .--