Forwards Final Rept:Task Analysis & Verification of Snupps Control Room. Rept Details Process Used in Performing Task Analysis & Presents Results in Form of Findings & Responses
ML20116E805
Person / Time
Site: Wolf Creek, Callaway, 05000000
Issue date: 04/26/1985
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20116E807 List:
References
SLNRC-85-12, TAC-57368, TAC-57369, NUDOCS 8504300429
Download: ML20116E805 (2)


Text

6 e

  • e SNUPPS Stenderdised Nuclear Unit Power Plent System 5 choke cherry need Nicholas A. Petrick
  • Iend 20eso Executive Director April 26,1985 SLNRC 85- 12 FILE: 0671.1 SUBJ: Task Analysis for SNUPPS DCRDR Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Docket Nos.: 50-482 and 50-483

Dear Mr. Denton:

Transmitted herewith are 3 copies of the Final Report for the Task Analysis for SNUPPS Detailed Control Room Design Review (DCRDR). The report details the process used by SNUPPS in performing the task analysis and presents the results in the form of findings and responses. An implementation schedule for the findings resulting from the verification of the task analysis is also attached herewith for both SNUPPS units.

With this transmittal, all human factors issues addressed by both licenses, specifically, license condition 2.C.(8) for Wolf Creek and 2.C.(7)(a) for Callaway are considered closed.

truly yours 0AA

.i M

~

i olas A. Petrick DJK/bds Attachment h

cc: G. L. Koester KGE

>7p I[

J. M. Evans KCPL e D. F. Schnell UE H. Bundy USNRC/WC (J p 't W. L. Forney USNRC/ Reg. III D. R. Hunter USNRC/ Reg. IV B. Little USNRC/ CAL sss 8504300429 850426 PDR ADOCK 05000482 ,

F PDR

b o.

  • s e

IMPLEMENTATION SCHEDULE FOR FINDINGS RESULTING FROM THE VERIFICATION OF THE TASK ANALYSIS FOR SNUPPS DCRDR Action Implementation Schedule Finding Required ? Callaway Wolf Creek 1 No NA NA 2 No NA NA 3 No NA NA 4 No NA NA 5 Yes (1) (2) 6 Yes (1) (2) 7 No NA NA 8 No NA NA .

9 No NA NA 10 No NA NA 11 Yes (1) (2)

(1) Implementation planned prior to implementing procedures based on the revision 1 Emergency Response Guidelines.

(2) Implementation planned prior to entering mode 2 operation.