ML20148A243

From kanterella
Revision as of 01:57, 12 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Inspec Repts#50-321/78-39 & 50-366/78-48 on 781007-1110 During Which No Items of Noncompliance Were Noted
ML20148A243
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/30/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20148A232 List:
References
NUDOCS 7812280290
Download: ML20148A243 (2)


See also: IR 05000321/1978039

Text

,[ 8,

,

'

, . .

4

UNITED STATES

  1. [e*K80uq_ jeg NUCLEAR REGULATORY COMMISSION

o REoloN il

) 101 M ARIETT A sTRE ET, N.W.

0 g

  • # ATL ANT A, oE oRot A 30303

NOV 3 01978

%, * . . . * /

In Reply Refer To:

RII:RFR

50-321/78-39

50-366/78-48

.

.

Georgia Power Company

Atta: Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street, N. W.

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by Mr. R. F. Rogers of this office

on October 7 - November 10, 1978, of activities authorized by NRC Operating

License No. DPR-57 and License No. NPF-5 for the Plant Hatch facilities, and

to the discussion of our findings held with Mr. M. Manry periodically during

the inspection interval.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In,accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

If this

inspection report will be placed in the NRC's Public Document Room.

report contains any information that you (or your contractor) believe to be i

proprietary, it is necessary that you make a written application within l

20 days to this office to' withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

If we do not hear from you in

i

l

contained in a separate part of the document.

this regard within the specified period, the report will be placed in the

Public Document Room.

7812280M O

,

1

'l'

.

.

.

.

O

.y -

Georgia Power Company -2-

Nov ,J0 197e

Should you have any questions concerning this letter, we vill be glad to

discuss them with you.

Sincerely,

d

D\ 'M v

F. J. Long, Chief ,

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report Nos. 50-321/78-39

ar.d 50-366/78-48

cc w/ enc 1:

Mr. M. Manry, Plant Manager

Plant E. I. Hatch

P. O. Box 442

Baxley, Georgia 31513

Mr. C. E. Belflower

Site QA Supervisor '

Plant E. I. Hatch

P. O. Box 442

Baxley, Georgia 31513

!

l'