Text
,[ 8,
,
'
, . .
4
UNITED STATES
- [e*K80uq_
je
NUCLEAR REGULATORY COMMISSION
g
REoloN il
o
)
101 M ARIETT A sTRE ET, N.W.
0
g
ATL ANT A, oE oRot A 30303
NOV 3 01978
%, * . . . * /
In Reply Refer To:
RII:RFR
50-321/78-39
50-366/78-48
.
.
Georgia Power Company
Atta:
Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street, N. W.
Atlanta, Georgia
30303
Gentlemen:
This refers to the inspection conducted by Mr. R. F. Rogers of this office
on October 7 - November 10, 1978, of activities authorized by NRC Operating
License No. DPR-57 and License No. NPF-5 for the Plant Hatch facilities, and
to the discussion of our findings held with Mr. M. Manry periodically during
the inspection interval.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In,accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
If this
inspection report will be placed in the NRC's Public Document Room.
report contains any information that you (or your contractor) believe to be
i
proprietary, it is necessary that you make a written application within
20 days to this office to' withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
i
contained in a separate part of the document.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
7812280M O
,
1
'l
'
.
.
.
.
.
O
-
.y
Georgia Power Company
-2-
Nov , 0 197e
J
Should you have any questions concerning this letter, we vill be glad to
discuss them with you.
Sincerely,
d
D\\ 'M v
F. J. Long, Chief
,
Reactor Operations and Nuclear
Support Branch
Enclosure:
Inspection Report Nos. 50-321/78-39
ar.d 50-366/78-48
cc w/ enc 1:
Mr. M. Manry, Plant Manager
Plant E. I. Hatch
P. O. Box 442
Baxley, Georgia 31513
Mr. C. E. Belflower
Site QA Supervisor
'
Plant E. I. Hatch
P. O. Box 442
Baxley, Georgia 31513
!
l'