Forwards Safety Evaluation Re Util Response to License Condition 2.C.(25)(d) Concerning Exam,Testing & Replacement of Six Fire Door Stops.Condition Satisfied
ML20211P240
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 12/15/1986
From: Adensam E
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20211P243 List:
References
NUDOCS 8612190018
Download: ML20211P240 (2)


Text

. . . .. __ __ - . .- ._ . .- .- . . . . -- - . - . .

December 15, 1986i i

Docket No. 50-373 DISTRIRtlTION: 1 M2 Mr. Dennis L Farrar NRC PDR Director of Nuclear Licensing Local POR .

Consoonwealth Edison Company BWD-3 r/f Attorney, OGC P.O. Box 767 EAdensam" JPartlow Chicago, Illinois 60690 .EHylton EJordan i ABournia BGrimes

Dear Mr. Farrar:

ACRS (10).

f

Subject:

Safety Evaluation Concerning Resolution of License Con'ition d

,  ?.C.(25)(d) for La Salle County Station, Unit 1 I

License Condition 2.C.(25)(d) for la Salle County Station, Unit I required

! Comonwealth Edison to perform an engineering review, conduct a fire test or replace individual components for certain fire door assemblies in the plant. i The license condition pertained to a total of 73 fire door installations. The identified deficiencies were found fully corrected in accordance with your com- i mitment for 67 of the 73 doors, as determined by the NRC staff when they con-  ;

I ducted a site audit in May 1986. As a result of replacing the deficient fire door stops for the remaining six doors and the corrective actions such as a 4

physical examination and testing of the door stops, the staff has concluded that the installation of these six doors now conforms to all applicable NRC fire protection guidelines and requirements and that the intent of License Condition.2.C.(25)(d) has been satisfied.

A copy of our safety evaluation addressing these six doors is enclosed.

Sincerely,

[

! Elinor G. Adensam Director BWR Project Directorate No. 3 Division of BWR Licensing 5

Enclosure:

j As stated I cc: see next page t

8612190018 861215 PDR ADOCK 05000373 4 F PDR i CD i BWD-3: DBL LA - : DBL D: 3: DBL i ABournia/vag E n E Jam I?/g/86 12/l /86 12/p/86

  • - A Mr. Dennis L. Farrar la Salle County Nuclear Power Station Commonwealth Edison Corr.pany Units 1 A ?

cc:

Philip P. Steptoe, Esquire John W. McCaffrey Suite 4200 Chief, Public Utilities Division One First National Plaza 160 North La Salle Street, Room 900 Chicago, Illinois 60602 Chicago, Illinois 60601 Assistant Attorney General 188 West Randolph Street Suite 2315 Chicago, Illinois 60601 Pesident Inspector /LaSalle, NPS 11.S. Nuclear Regulatory Comission Rural Route No. 1 P. O. Box 224 Parseilles, Illinois 613al Chairman la Salle County Board of Supervisors la Salle County Courthouse -

Ottawa, Illinois 61350 Attorney General 500 South 2nd Street Springfield, Illinois 6?701 Chairman Illinois Comerce Comission Leland Building 527 East Capitol Avenue Springfield, Illinois 62706 Mr. Gary N. Wright, Manager Nuclear Facility Safety Illinois Department of Nuclear Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 6?704 Regional Administrator, Region III U. S. Nuclear Regulatory Comission 799 Rossevelt Road Glen Ellyn, Illinois 60137