Forwards Safety Evaluation & EGG-NTA-7319 Re Util Response to Generic Ltr 83-28,Item 2.1 on Equipment Classification of Reactor Trip Sys Components.Response Acceptable
ML20214T790
Person / Time
Site: Waterford, 05000000, Washington Public Power Supply System, Satsop
Issue date: 11/19/1986
From: Stolz J
Office of Nuclear Reactor Regulation
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20214T794 List:
References
GL-83-28, NUDOCS 8612090006
Download: ML20214T790 (3)


Text

-

  • \b Docket No. 50-460 November l'9,1986 Mr. D. W. Mazur Managing Director Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352

Dear Mr. Mazur:

SUBJECT:

GENERIC LETTER 83-28, ITEM 2.1 (PART 1) EQUIPMENT CLASSIFICATION (REACTOR TRIP SYSTEM COMPONENTS)

WASHINGTON NUCLEAR PROJECT, UNIT 1 (WNP-1)

We have reviewed your_ letter dated March 30, 1984 responding to Generic Letter 83-28, " Required Actions Based on Generic Implications of Salem ATWS Events."

Part 1 of Item 2.1 of Gengric Letter 83-28 required applicants to confirm that all components required to trip the reactor are identified as safety related on all plant documentation and in information handling systems that are used to control all activities performed on this safety related equipment. We have evaluated your response to Part 1 of Item 2.1 and, based on the delayed construction status of WNP-1 and your commitment to address the concern prior l

- to fuel load, have concluded that it is acceptable. Our Safety Evaluation, which is enclosed, should be retained for use in tracking yrur commitment when construction and normal licensing activities resume.

Sincerely,

/S/

John F. Stolz, Director PWR Project Directorate #6 Division of PWR Licensing-B

Enclosure:

As stated cc w/ enclosure:

See.next page Distribution: FMiraglia Docket File EJordan NRC & L PDRs JPartlow Branch Files BGrimes RIngram ACRS 10 SWest OGC-Bethesda CMcCracken DLasher GEdison **See previous white for concurrenc(

PWR#6** PWR #6** PWR#6 h PW SWest;eh CMcCracken GEdison JStqlz I)'l?86 11/1986 li /jc[86 /Q86 N[

A DON O

, -Dock'et No. 50-460:

Mr. D. W. Mazur Managing Director Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352

Dear Mr. Mazur:

SUBJECT:

GENERIC LETTER 83-28, ITEM 2.1 (PART 1) EQUIPMENT CLASSIFICATION (REACTOR TRIP SYSTEM COMPONENTS)

WASHINGTON NUCLEAR PROJECT, UNIT 1 (WNP-1)

We have reviewed your letter dated March 30, 1984 responding to Generic Letter 83-28, " Required Actions Based on Generic Implications of Salem ATWS Events."

Part 1 of Item 2.1 of Generic Letter 83-28 required applicants to confirm that all components required to trip the reactor are identified as safety related on all plant documentation and in information handling systems that are used to control all activities performed on this safety related equipment. We have evaluated your response to Part 1 of Item 2.1.and based on your commitment and the delayed construction status of WNP-1, have concluded that it is acceptable.

Our Safety Evaluation, which is enclosed. .should be retained for use in tracking your commitment when construction and normal licensing activities resume.

Sincerely, 1

John F. Stolz, Director PWR Project Directorate #6 Division of PWR Licensing-B '

Enclosure:

As stated cc w/ enclosure:

See next page Distribution: FMiraglia Docket File EJordan NRC & L PDRs JPartlow Branch Files BGrimes RIngram ACRS 10 SWest OGC-Bethesda CMcCracken DLasher GEdison PWR#6d(( P .

PWR#6 PWRf6 SWegtSfh CM eken GEdison JStolz

)\ AT/86 ll Q86 / /86 / /86

Mr. D. W. Mazur WPPSS Nuclear Project No. 1 Washington Public Power Supply System (WNP-1) cc:

Mr. V. Mani Mr. Curtis Eschels, Chairman United Engineers & Constructors, Inc. State of Washington 30 South 17th Street Energy Facility Site Evaluation Philadelphia, Pennsylvania 19101 Council Mail Stop PY-11 Nicholas S. Reynolds, Esq. Olympia, Washington 98504 Bishop. Liberman, Cook, Purcell and Reynolds 1200 Seventeenth Street, N.W., Mr. Eugene Rosolie Suite 700 Coalition for Safe Power Washington, D. C. 20036 Suite 527 408 South West Second Street Mr. E. G. Ward Portland, Oregon 97204 Senior Project Manager .

Babcock & Wilcox Company Nina Bell P.O. Box 1260 Nuclear Information and Resource Lynchburg, Virginia 23505 Service 1346 Connecticut Avenue, N.W.

Resident Inspector /WPPSS NPS Washington D. C. 20036 c/o U.S. Nuclear Regulatory Commission Attorney General P.O. Box 69 Temple of Justice Richland, Washington 9935? Olympia, Washington 98504 Mr. R. B. Borsum State Planning Division Nuclear Power Generation Division Office of Financial Management Babcock & Wilcox Room 105, House Office Building 7910 Woodmont Avenue, Suite 720 Olympia, Washington 98504 Bethesda, Maryland 20814 Chairman G. E. Craig Doupe, Esq. Benton County Commissioners Washington Public Power Supply System County Court House 3000 George Washington Way Prosser, Washington 99350 P. O. Box 968 Richland, Washington 99352 Regional Administrator, Region V U.S. Nuclear Regulatory Commission, 1450 Maria Lane, Suite 210 Walnut Creek, California 94596