Forwards Insp Rept 50-382/87-11 on 870516-0615 & Notice of Violation
ML20216G200
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/24/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20216G203 List:
References
NUDOCS 8707010033
Download: ML20216G200 (2)


See also: IR 05000382/1987011

Text

,

  • '

JUN 241987

In Reply Refer To:

Docket: 50-382/87-11

l

Louisiana Power & Light Company  ;

ATTN: J. G. Dewease, Senior Vice President '

Nuclear Operations

317 Baronne Street

P. O. Box 60340

New Orleans, Louisiana 70160

Gentlemen:

This refers to the inspection conducted by Messrs. J. G. Luehman and

T. R. Staker of this office during the period May 16 through June 15, 1987, of

activities authorized by NRC Operating License NPF-38 for Waterford Steam

Electric Station, Unit 3, and to the discussion of our findings with Mr. N. S.

Carns and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included plant status, licensee event

report followup, monthly maintenance, monthly surveillance, ESF system

walkdown, routine operational safety inspection, and license conditions.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the NRC inspectors. The inspection findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should he based on the specifics contained in the

Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you. 1

Sincerly,

went amned te

(*s. C, H A LL'

fJ.E.Gagliardo, Chief

s Reactor Projects Branch

Enclosures: (see next page)

RIV: RRI RIV: RRI C:RPB/Ag C:RPB ,

PI: RPS/A f

TStaker JLuehman

MSkoW#f/ 6eJJaudort pGagl'iardo

/ /87 / /87 f /13/87 (> /29/87 y (; /87 D\

B707010033 B70624 .)

PDR ADOCK 050003B2

G PDR g (3

'

f

Louisiana Power & Light Company -2-

Enclosures:

1. Appendix A - Notice of Violation 1

2. Appendix B - NRC Inspection Report l

50-382/87-11

cc w/ enclosures: a

Louisiana Power & Light Company l

ATTN: N. S. Carns, Plant Manager l

P.O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company J

ATTN: .K. W. Cook, Manager, I

Nuclear Safety & Regulatory Affairs

317 Baronne Street

P. O. Box 60340

New Orleans, Louisiana 70166

Louisiana Power & Light Company

ATTN: G. E. Wuller, Onsite

Licensing Coordinator

P. O. Box B

Killona, Louisiana 70066

Middle South Services

ATTN: Mr. R. T. Lally 3

'

P. O. Box 6100

New Orleans, Louisiana 70161

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV

  • RPB RSB D. Crutchfield, NRR-
  • Resident Inspector R. D. Martin, RA * Project Inspector
  • Section Chief (RPB/A) DRSP D. Powers
  • EP&RPB *RIV File * MIS System
  • RSTS Operator *R. Hall NRR Project Manager <
  • w/766