Ack Receipt of 860514 & 1001 Ltrs in Response to 851115 IE Bulletin 85-003 & Requests Addl Info.Response to Action Item E Found to Be Deficient in Identified Areas
ML20236E942
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/29/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
References
IEB-85-003, IEB-85-3, NUDOCS 8708030147
Download: ML20236E942 (3)


Text

- _ _ _ _ _ _

x Docket: 50-382 E_ 2 9 W Louisiana Power & Light Company ATTN: J. G. Dewease, Senior Vice President l Nuclear Operations .

317 Baronne Street New Orleans, Louisiana 70160 l Gentlemen:

Thank you for your letters of May 14, 1986, and October 1, 1986, in response to IE Bulletin 85-03, dated November 15, 1985. As a result of our review, we find that additional information is needed.

Specifically, the infonnation provided in your response to Action Item e was found to be deficient in some areas. Please provide the additional information necessary to resolve the following ccmments and questions.

1. Unlisted MOVs SI-331A, -331B. -332A, and -332B in discharge lines of the safety injection tank system are shown locked open (fail as is) on Drawing LOV-1564-G-167, Sheet 2, Revision 22. If power is removed from the motors in addition to the locked-open position of these MOVs, please state this in your response. Otherwise, address the effect of assuming inadvertent equipment operations as required by Action Item a of the Bulletin, and revise Attachment 1 of the response of May 14, 1986, to include these valves.
2. Has water hammer due to valve closure been considered in the determination of pressure differentials? If not, please explain.
3. Listed MOVs 1025-1 and 1075-1 of the EFW system are 4-inch globe valves, and listed MOVs SI-506A and SI-506B of the HPSI system are 3-inch globe valves. We were advised recently that the M0 VATS data base does not include globe valves with orifice sizes less than 1.75 or greater than 2.0 inches. Will representative samples of these 3-inch and 4-inch globe valves be tested at full differential pressure? If not, explain and justify how settings will be verified for full differential pressure, RIV:RSB/ES f ./

RPEI A g RSB @

\,

RPB (/ /

RElreland:gb JJa ddn TFWesTerman JEGag i rdo 7/29/87 q/f]187 9d / /87 1 L9(

8708030147 070729 h PDR ADDCK 050003G2 lll g

$ PDR s

n-_-_-. . _ , _ _ .

i

m. ~. .

b . L Louisiana' Power and' Light Company 2 6

4. Please. expand the proposed program for action items b, c,'and d of the-Bulletin to include the-following details as a minimum:
(a).. description of.the training program for setting. switches; maintaining?

valve: operators,- using signature testing equipment 'and interpreting signatures,'and (b): description of the method (s) to.be used to to extrapolate valve' stem-thrust- measured at less than maximum ~ differential pressure..

f Please provide the supplemental-information'within 30 days.of-the date of this

- letter.

Sincerely, o y 'Gridnal Siuncci l>y:

). E. GAGLIARDO '
J. E. Gagliardo, Chief

. Reactor Projects Branch CC Louisiana' Power & Light Company ATTN: G. E. Wuller, Onsite

> Licensing Coordinator

. P;'0. Box'B.

Killona ,' Louisiana . 70066

- Louisiana Power & Light Company

ATTN: N.-S. Carns, Plant Manager P. O. Box B Killona, Louisiana- 70066 Middle South Services-

' ATTN: . Mr. R. T. Lally.

. P.'O. Box 61000-New Orleans, ' Louisiana _ 70161 e .

. Louisiana Power & Light Company ATTN: K..W.. Cook, Nuclear Safety and Regulatory' Affairs Manager.

317'Baronne Street P.'O. Box 60340 New Orleans, Louisiana 70160 Louisiana' Radiation Control Program Director l

L L

j l

bec to DMB (IEll) bec distrib. by' RIV: ,

  • RPB *D. Weiss, RM/ALF i
  • RRI R. D. Martin, RA  ;
  • SectionChief(RPB/A) DRSP RPSB *RSB
  • Project Inspector, RPB SectionChief(RSB/ES)
  • RIV File *J. Wilson, NRR Project Manager D. Norman R. Kiessel, NRR AI 87-239

- - _ _ - _ . _ . .- _ . _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _