ML20207P200

From kanterella
Revision as of 05:20, 12 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Augmented Insp Team Repts 50-321/86-41 & 50-366/86-41 on 861204-07.Violatons Being Considereded for Escalated Enforcement Action.Notice of Violation Will Be Issued Under Separate Cover
ML20207P200
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/08/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20207P201 List:
References
TAC-64455, TAC-64456, NUDOCS 8701150225
Download: ML20207P200 (2)


See also: IR 05000321/1986041

Text

- _ -___-____ _ __ _ __-___- _________ ____ -_____-- . _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ - _ _ _ _ _ - _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

-

.

- .  :. ap

.! ^

JAN 0 8 587

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

Georgia Power Company

ATTN: Mr. J. H. Miller, 'Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC AUGMENTED INSPECTION TEAM REPORT NOS. 50-321/86-41 AND

50-366/86-41

This refers to the Nuclear Regulatory Commission (NRC) augmented inspection

conducted by Messrs. F. S. Cantrell, P. Holmes-Ray, W. B. Gloersen, and

G. M. Nejfelt on December 4-7, 1986. The inspection included a review of

activities authorized for your Hatch facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

'

Area examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The violations described in the enclosed Inspection Report are under consideration

for escalated enforcement action. Accordingly, no Notice of Violation is being

issued at this time, and no response to this letter is required. However, please

be advised that the number and characterization of violations described in the

i enclosed Inspection Report may change as a result of further NRC review. You will

i be advised by separate correspondence of the results of our deliberations on this

4 matter.

4

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely.

Original Signed by ,

8701150225 870108 M. L. Ernst/for *

PDR ADOCK 05000321

0 PDR ~

J. Nelson Grace

Regional Administrator

Enclosure:

Inspection Report f

I l

(ccw/ encl: See page 2)

.r0 0 t

.

.. .

. :..

Georgia Power Company. 2 JAN 0 81987

cc w/ enc 1:

J. P. O'Reilly, Senior Vice. President

Nuclear Operations

J. T. Beckham, Vice President, Plant Hatch

H. C._ Nix, Site Operations General

Manager

A. Fraser, Acting Site QA Supervisor

L. Gucwa, Manager, Nuclear Safety

and Licensing

bec w/ enc 1:

NRC Resident Inspector

Hugh S. Jordan, Executive Secretary

Document Control Desk

State of Georgia

W

G.Tf<W

i ls /s1

RII RII RII RI RI RII

h

RCr beau:ht

II}{.<

D}

Kahle

M,

FScantrell VLBr$

ownled

,

eyes

P f6 f

Walkdr .MErnst

6 12/ /86 12/ /86 12/4/86 W/ /86 12/ /56 12/T /86

12f

\ r '%@\ //5l Sl \ If/S1 /

!

$7