Forwards Equipment Qualification Insp Rept 50-382/88-27 on 881017-27 & 881101-04 & Notice of Violation
ML20206K636
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/23/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20206K640 List:
References
NUDOCS 8811290474
Download: ML20206K636 (3)


See also: IR 05000382/1988027

Text

. _ ,

__- - -

. 0

'

1

. .

NOV 2 31988

In Reply Refer To:

Docket: 50-382/88-27

Louisiana Power A Light Company

ATTN: J. G. Dewease, Senior Vice President

Nuclear Operations

317 Baronne Street

New Orleans, Louisiana 70160

Dear Mr. Dewease:

SUBJECT: EQUIPMENT QUALIFICATION (EQ) INSPECTION - WATERFORD STEAM ELEtIRIC

STATION, UNIT 3 (NRC INSPECTION 50-382/88-27)

This refers to a special EQ followup inspection to review compliance with

10 CFR 50.49 of activities authorized by License Fo, NPF-38 conducted by

Mr. A. R. Johnson during the period October 17-27 and November 1-4, 1988, at

the NRC Region IV office for the Waterford Steam Electric Station, Unit 3.

Areas examined during this inspection were your actions on previously

identified items regarding equipment qualification as documen.ad in NRC

Inspection Report 50-502/86-32 which was forwarded to you previously by our

letter dated Spril 16, 1987.

We have examined your actions taken with regard to these findings as discussed

wit 5 you and other membe;*s of your staff during the enforcement meeting held on

October 4, 1988, at the NRC Region IV office, and as outlined in your response

letter to NRC Region IV on October 18, 1988. The inspection findings are

documented in the enclosed NRC Inspection Report 50-382/88-27.

During the followup inspection, it was found that certain of vcur activities

which occurred subsequent to November 30, 1985, were in violation of NRC

requirements. You are required to respond to the violatiuns, in writing, in

accordance with the provisions of Section 2.201 of the NRC's "Rules of

Practice," Part 2, Title 10. Code of Feder;' Regulations. Your response

should be based on the specifics contained in the Notice of Violation enclosed

with this letter.

Five unresolved items were identified of which three have been closed out

requiring no further action. These items were previously identified as pc.ential

enforcement /unrssolved items in NRC inspection Report 50-382/86-32.

  • RIV:RI C:PSS * D:0RS * D: C:SP!$/ORIS/NRR *

AJohnsontap TStetka JLMilhoan LJ an UPotapovs

/ /88 / /88 / /88 ll /gj/88 / /88

  • previously concurred

i

0

G311290474 GS1121

PDR AIiOCK 050v 2

F

. .

'

'

. .

. .

,

l

!

Louisiana Power & Light Company -2-

Should yN have any questions concerning this inspection, we will be pleased (a

discuss ther with you. 1

Sincerely,

or:pinal s,y,ul by <

A, U. lle ch

~

L. J. Callan, Director

Division of Reactor Projects ,

Enclosures:

1. Appendix A - Notice of ViolGtion

2. Appendix B - I;RC Inspection Report

50-382/88-27  ;

cc w/ enclosures.

Louisiana Power & Light Cortpany

ATTN: R. P. Barkhurs+., Vice President

Nuclear Operations

P.O. Box B '

t.Flona, Louisiana 70066

Louisicna Power & Light Company

ATTN: L. W. Laughlin, Site

Licensing Support Supervisor

P.O. Box B '

,

Killona, Louisiana 70066

Louisiana Power & Light Company l

N. S. Car.ts, Plant Manager

'

ATTH: ,

r

P.O. Box B

Killona, Louisiana 70066 l

Hiddle South Services

ATTN: Mr. R. T. Lally ,

F.0. Box 61000 l

New Orleans, Louisiana 70161  :

!

l

Louisiana Power & Light Company

ATTN: W. F. Burski, Acting Manager i

Nuclear Safety and Regulatory l

Affairs l

317 Baronne Street

P.O. Box 60340 i

New Orleans, Louisiana 70160 j

!

Louisiana Radiation Control Program Director  :

bec to DMB (IE01)

bec distrib, by RIV: t

!

__ - - _ _

. .

'

'

.

.

. .

Louisiana Power & Light Company -3-

  • RRI *R. O. Martin, RA
  • Section Chief (DRP/A) *DRP
  • RPB-DRSS * MIS System
  • Project Engineer DRP/A *RSTS Operator
  • RIV File *D. Wigginton, NRR Project
  • T. Stetka Manager (MS130-18)
  • DRS Lisa Shea, RM/ALF
  • V. Potapcus, NRR/DRIS/VIB/SPIS *J. Craig, NRR/SPLB
  • R. Ireland *A. Johnson
  • G. Sanborn
  • w/766

,