ML20206Q625

From kanterella
Revision as of 11:09, 28 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-482/87-06 on 870301-31 & Notice of Violation.One Unresolved Item Noted
ML20206Q625
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/15/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20206Q630 List:
References
NUDOCS 8704220006
Download: ML20206Q625 (2)


See also: IR 05000482/1987006

Text

_-

', c-

- APR 151987

In Reply Refer To:

Docket: STN 50-482/87-06

Wolf Creek Nuclear Operating Corporation

ATTN: Bart D. Withers

President and Chief Executive Officer

P. O. Box 411

Burlington, Kansas 66839

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Cummins and

B. L. Bartlett of this office during the period March 1-31, 1987, of activities

authorized by NRC Operating License No. NPF-42 for the Wolf Creek Generating

Station, and to the discussion of our findings with Mr. G. D. Boyer and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included plant status, operational safety

verification, monthly surveillance observation, monthly maintenance

observation, onsite event followup, corrective action, and licensee event

report. Within these areas, the inspection consisted of selective examination

of procedures and representative records, interviews with personnel, and

observations by the NRC inspectors. The inspection findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

One unresolved item is identified in paragraph 4 of the enclosed report.

The response directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

SRI b

JEC6nYnins:dp rtlett

PI

RPMullikin

d:RP

DRHu MVr

c.:RPB //

JEGag~liardo

Y/li/87 //Y/87 5{ / g/87 4 /IS87 .

f/g/87

9

==n88aE8%2

O

q

. .

,-

,.

Wolf Creek Nuclear Operating -2-

Corporation c

1

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

" Original ctaned tfft

M. E. H AL L"

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-482/87-06

cc w/ enclosures:

Otto L. Maynard, Manager, Licensing

Wolf Creek Nuclear Operating Corporation

P. O. Box 411

Burlington, Kansas 66839

Gary Boyer, Plant Manager

Wolf Creek Nuclear Operating Corporation

P. O. Box 411

Burlington, Kansas 66839

Kansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib, by RIV:

  • RPB Myron Karman, ELD, MNBB (1)
  • RRI R. D. Martin, RA
  • Section Chief, (RPB/B) DRSP
  • R&SPB R. P. Warnick, RIII
  • RIV File Callaway, Resident Inspector, RIII

-

  • RSB * Project Inspector
  • MIS System *R. Hall
  • RSTS Operator *D. Weiss, RM/ALF
  • w/766