Forwards Safety Insp Rept 50-333/87-24 on 871214-16.No Violations Noted
ML20149L702
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/18/1988
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Radford Converse
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20149L704 List:
References
NUDOCS 8802240395
Download: ML20149L702 (2)


See also: IR 05000333/1987024

Text

. _ _ _ _ _ _ _ _ _ _ _ _

.

l

. i

'

FEB 181984

!

Docket No. 50-333

i

Power Authority of the State of New York

James A. FitzPatrick Nuclear Power Plant  :

'

ATTN: Mr. Radford J. Converse

Resident Manager

P. O. Box 41

Lycoming, New York 13093 .

s

Gentlemen: (

I

Subject: Inspection Report No. 50-333/87-24  ;

This letter refers to the routine safety inspection of your Annual Ernergency f

Preparedness Exercise conducted by Mr. T. Tuccinardi of this office and other

members of an NR0 team on Decerrber 14-16, 1987 at the James A. Fitzpatrick  ;

Nuclear Power Plant, Oswego, New York. Discussions of our findings were held

by Mr. T. Tuccinardi with you and your staff Ot the conclusion of the .

inspection. [

The areas examined during the inspection are described in the NRC Region I

InspectionReport(enclosed). Within these areas, tni: inspection consisted of l

selective examination of procedures and representative records, interviews r

with personnel, and observation of the emergency ext;rcise by team members.

l

Within the scope of this inspection, no vinlations were observed. James A. '

FitzPatrick Nuclear Power Plant's performance during the exercise demonstrated i

the ability to implement the Emergency Plan and the Emergency Plan

Implementing Procedures in a manner that would provide adequate protective ,

measures for the health and safety of the public. l

6

' "

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

'

Sincerely,

E

p u -im y ay: f

f.  :. 9" my j

t

Ronald R. Bellamy, Chief j

8802240395 880218 Facilities Radiological Safety -

,

+ PDR ADOCK 05000333

I G PDR and Safeguards Branch I

! Division of Radiation Safety i

and Safeguards

j

! Enclosure, i j I

Region I Inspection Report No. 50-333/87-24 l

l - A  ;

"df5CIAL RECO3D CPV"

t 5t

- _ _ _

-

.

Power Authority of the 2 FEB 181988

State of New York

CC:

J. Phillip Bayne, President

J. A. Gray, Director Nuclear Licensing - BWR

John C. Brons. Executive Vice President - Nuclear Generation

A. Klausmann, Senior Vice President - Appraisal and Compliance Services

R. L. Patch, Quality Assurance Superintendent

George M. Wilverding Manager Nuclear Safety Evaluation

Gerald C. Goldstein, A:sistant General Counsel

NRC Licensing Project Manager

Dept. of Public Service State of New York

R. E. Beedle, Vice President Nuclear Engineering

S. S. Zulla, Vice President Nuclear Engineering

R. Burns, Vice President Nuclear Operations

Public Document Room (POR)

l Local Public

Nuclear Document

Safety Information Room

Center (LPDR) (NSIC)

NRC Resident Inspector

FEPA, Region II

State of New York

bec:

Region I Docket Room (with concurrences)

Managerrent Assistant. DRMA (w/o encl)

D. Matthews, NRR, PEPB

Section Chief, DRP

Robert J. Bores. DRSS

1

g .\ pN%

RI:DRSS-h R SS RI:DRES

Tuccinartil/ejr La s Bellamy

1/ rt/88 i /88 1/i>/88

0FFICIAL RECORD COPY ir fitz 87-24

1/4/88

__