ML20150B715

From kanterella
Revision as of 00:58, 26 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised Draft Rev 5 to ES-601, Administration of NRC Requalification Program Evaluations. W/O Encl
ML20150B715
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/23/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Antony D
NORTHERN STATES POWER CO.
References
NUDOCS 8807120140
Download: ML20150B715 (1)


Text

g_ - ..

"JtjN s 198:

Docket No. 50-263 Northern States. Power Company Monticello Nuclear Generating Plant ATTN: Mr. Douglas Antony.

Training Department P.-0. Box 600 Monticello, MN 55362

SUBJECT:

REQUAl.IFICATION EXAMINATIONS

Dear Mr. Antony:

Region III has completed a pilot requalification exam at the Perry facility utilizing the new requalification examination methodology.

In order to provide you with the latest, although not necessarily final, procedure and guidance.on the requalification process the following information is being provided for your information.

1. Draft of ES601 Rev 5 "Administration of NRC Requalification Program Evaluations".

t

2. Written Exam from Perry
3. Selected Simulator Scenarios from Perry
4. Selected Job Performance Measures (JPM) from Perry.-

If you have any questions on the present status of the process please contact me at (312) 790-5ti95.

Sincerely, MGINAl. SIGNED BY GE0ffREY C. WRIGHT '

Geoffrey C. Wright, Chief Operations Branch

Enclosures:

As stated cc w/ enclosures:

Monticello, SRI cc w/o enclosures: l I. Jackiw, DRP l

1 l

l l

\

Wright /mc 8807120140 880623 .bQY PDR V

ADOCK 05000263 PDC

[f 1