ML20199H832
| ML20199H832 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 01/20/1999 |
| From: | Burgess B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wadley M NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20199H837 | List: |
| References | |
| 50-263-98-18, NUDOCS 9901250349 | |
| Download: ML20199H832 (3) | |
See also: IR 05000263/1998018
Text
.
_
_
..
_
.
_
__--
-
.
January 20, 1999
Mr. M. Wadley
President, Nuclear Generation
Northem States Power Company
414 Nicollet Mall
Minneapolis, MN 55401
SUBJECT:
MONTICELLO INSPECTION REPORT 50-263/98018(DRP)
Dear Mr. Wadley:
On January 11,1999, the NRC completed an inspection at the Monticello reactor facility. The
enclosed report presents the results of that inspection.
During the 6-week period covered by this inspection, the conduct of activities at the Monticello
facility was generally characterized by safety-conscious operations and sound maintenance
practices. A planned power reduction was conducted in a controlled and deliberate manner.
No significant issues were identified.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
/s/ Bruce L. Burgess
Bruce L. Burgess, Chief
Reactor Projects Branch 7
Docket No.: 50-263
License No.: DPR-22
Enclosure:
Inspection Report 50-263/98018(DRP)
cc w/ encl:
Plant IAanager, Monticello
State Liaison Officer, State
of Minnesota
DOCUMENT NAME: G:\\MONT\\ MON 98018.DRP
To receive a copy of this document, indicate in the box "C" = Copy w/o attach /enci"E" =
Copy w/ attach /enct "N" = No copy
OFFICE
Rill
lE
Rllio/#
l# I
l
l
NAME
Kunowski/mlMK
Burg 3i!Di
DATE
01/>c/99
01/10/99
OFFICIAL RECORD COPY
9901250349 990120
ADOCK 05000263
0
pg
,
. ,
- -
- .
. --- . . . . .
.-
. ~ . - _ - . -
~ .
,
- - -
.
_ . . . . . -
, ;.
.
L
i
'
l
i
!.
i
t
I
,.
!.
M. Wadley
-2-
i
!
'
l
l
!
3
l'
i
9
l-
Distribution:
'
,
CAC (E-Mail)
l
i
l;
!
. RPC (E-Mail)
l
l
Project Mgr., NRR w/enci
!
,
J. Dyer, Rlll w/enci
J. Caldwell, Rlll w/enci-
l
B.' Clayton, Rlll w/enct
l
!
SRI Monticello w/ encl
l
DRP w/enci
!
TSS w/ encl -
l
,
l
DRS (2) w/ encl
Rlli PRR w/ encl
i
PUBLIC IE-01 w/enci
!
Docket File w/enci
i
GREENS
!
IEO (E-Mail)
i
<
DOCDESK (E-Mail)
l
i
I
!
i
l
l
1
i
i
'
'
I
i.
!
!
l
l
/
\\
/
i
(* p
i
<o0001
'
,
r
l
J
!
l-
/
_ ... _ _ _ _ . -
- . - . . . - - - - - . .
!.
.-
,
UNITED STATES
j
f
[s3 **C
8
.
NUCLEAR REGULATORY COMMISSION
j
o.
REGION lit
i
if
$.
801 WARRENVILLE ROAD
!
- LtSLE,lLLINOIS 60532-4351
- %,e.. + /
January 20, 1999
[
l
l
Mr. M. Wadley
i
. President, Nuclear Generation
!
' Northern States Power Company
414 Nicollet Mall
Minneapolis, MN ' 55401
,
. SUBJECT:
MONTICELLO INSPECTION REPORT 50-263/98018(DRP)
Dear Mr. Wadley:
!t
On January 11,1999, the NRC completed an inspection at the Monticello reactor facility. The
' enclosed report presents the results of that inspection.
i
During the 6-week period covered by this inspection, the conduct of activities at the Monticello
'
facility was generally characterized by safety-conscious operations and sound maintenance
.' practices. A planned power reduction was conducted in a controlled and deliberate manner.
No significant issues were identified.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
l
Sincerely,
I'
.
.M
A
'
Bruce L. Burgess, Chi
Reactor Projects Branch 7
l
Docket No'.: 50-263
l'
License No.: DPR-22
l
Enclosure:
' Inspection Report 50-263/98018(DRP)
i
- cc w/ encl:
Plant Manager, Monticello
- .
l
State Liaison Officer, State
i~
of Minnesota
l
'
!
i~
,
e
5
1
I.
l
>
'
.
__
.
. - - - . .
.
_
_
_
.,