ML20215B149

From kanterella
Jump to navigation Jump to search
Notifies That Evaluation of Requalification Program Scheduled for Wks of 870831,0907 & 14.NRC Will Administer Written,Oral & Simulator Exams.Encl Ref Matl Requested to Assist Examiner in Preparing for Visit
ML20215B149
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/09/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
References
NUDOCS 8706170237
Download: ML20215B149 (3)


Text

s JUN 9 1987

! Docket No,'50-263J

~

i

' Northern' States-Power Company.

' ATTN: -Mr. C. E. Larson

~Vice President, Nuclear Generation International Centre Building

>920 Second Avenue South Minneapolis, MN 55401-

Dear Mr. . Larson:

J

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION.

In a telephone conversation between Mr. Eugene Earney, Superintendent, Training

at'Monticello, and Mr. T. Burdick, Region III, arrangements were made'for an

. evaluation.of the requalification program at the Monticello Nuclear Plant. The evaluation visit?is scheduled for the weeks of August 31, September 7 and 14, 1987..

. For this visit, the NRC examiner will administer NRC prepared written, oral, and simulator' examinations. ;When the NRC' examiner arrives at the site,-he will meet with the" appropriate' facility. personnel to Lreview the- schedule for those examinations-.~ For the examiner to adequately prepare for this visit, it will be-

~

-necessary.for.the: facility to furnish the approved reference material-listed in Enclosure 1, " Reference Material Requirements for Requalification Program-
q. Evaluations,".at least 60 days' prior to the examination'date. .Mr. Earney has been

. advised of our reference material re'quirements and where they.a're to be-sent.

"This: request for information was approved by the Office of Management and Budget 1 under: Clearance Number 3150-0101, which expires May 31, 1989. Comments on burden

(( and-duplication may be directed to the Office of Management and Budget, Reports-Management' Room 3208,'New Executive Office Building, Washington,-D. C. 20503.

Thank you for your consideration in this matter. If you have any questions.

on:the. evaluation process, please contact Mr. T. Burdick at (312) 790-5566..

Sincerely,

, Origind Signed By C. W. Hehl 3 8706170237 870euv Charles W. Hehl, Chief i

PDR ADOCK 05000263 i V'

P. PDR k Operations Branch i

Enclosure:

-As stated See Attached Distribution

.RI RI Buiadick/ jaw He 1 fhk b

> 1 16 9 i

a.

t ,

v..; - c. ,

, ' , -l c

1

' Northern-States Power, Company. -2 30U '9I907I I

.. i

'Distrib'ution 1

j

?cc:w/enclosurei

.W.'A. Shamla,.P.lant Manager

DCS/RSB(RIDS)

J Licensing Fee Management Branch

. Resident? Inspector, RIII'Monticello

. Resident Inspector, RIII-Prairie

. Island John W.~ Ferman, Ph.D.,

Nuclear Engineer, MPCAL

'E. Earney, Training' Supervisor n' cc w/o. enclosure:-

D. Scaletti, Project Manager, NRR J. N. Hannon, Branch Chief,.0LB I.. N. -Jackiw,' Section Chief, DRP -

i k

l i

d

4 g

j 1

1 J

ENCLOSURE 1 i Reference Material Requirements for Requalification Program Evaluation i h

1. All administrative procedures (as applicable to reactor operation or safety)

I

2. All integrated plant procedures (n'ormal or general operating procedures) {

J

3. . Emergency procedures (emergency instructions, abnormal, or special procedures)

Standing orders (important orders which are safety-related to and

~

. 4.

may supersede the regular procedures)

5. Fuel-handling and core-loading procedures (initial core-loading g procedure, when appropriate) ]

l J

6. Annunciator procedures (alarm procedures, including set points)
7. Radiation protection manual (radiation control manual or procedures) 1 i
8. Emergency plan
9. Technical Specifications
10. Lesson plans (training manuals, plant orientation manual, systems descriptions) l
11. Systems' operating procedures
12. Piping and instrumentation diagrams, electrical single-line diagrams, ,

or flow diagrams l

13. Copies of facility RO and SRO requalification examinations administered during the past 2 years )
14. A synopsis of the subjects and material covered in the requalification program for the past two years
15. An index of administrative, operating, abnormal and emergency procedures
16. Plant technical dath (curve) book ,

i l

17. Simulator malfunction list with descriptive summary of malfunction effects.

All of the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.

I e  :