ML20211F996

From kanterella
Jump to navigation Jump to search
Forwards Effluent & Waste Disposal Semi-Annual Rept for 990101-990630, Revised Effluent & Waste Disposal Semi-Annual Rept for 980701-981231 & Revs to ODCM for Monitcello Nuclear Generating Plant
ML20211F996
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/26/1999
From: Hammer M
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211G002 List:
References
NUDOCS 9908310125
Download: ML20211F996 (3)


Text

n s 4 l

Northern States Power Company l l

Monticello Nuclear Generat:ng Plant l 2807 West County Road 75 l Monticello. MN 55362 August 26,1999 Technical Specification 6.7.A.4 1

US Nuclear Regulatory Commission j Attn: Document Control Desk l Washington, DC 20555 l I

MONTICELLO NUCLEAR GENERATING PLANT l Docket No. 50-263 License No. DPR-22  :

Effluent and Waste Disposal )

Semi-Annual Report for January Through June,1999 In accordance with Monticello Technical Specification Section 6.7.A 4, we are submitting the following l information as attachments:

A. Effluent and Waste Disposal Semi-Annual Report for January - June,1999.

B. Revised Effluent and Waste Disposal Semi-Annual Report for July - December,1998.

This revision is necessary because an error was made in the original report relating to the number of waste shipments made. The original report did not contain data pertaining to solid waste shipments made to Envirocare in Clive, UT. These shipments were not reported because of an error in a computer program used to generate the report. The root cause of this error is being determined via the condition report process.

C. Revisions to the Offsite Dose Calculation Manual (ODCM).

There were no changes to the Process Control Program (PCP) Manual during the reporting period.

Also, there were no milk and vegetable sampling deviations during this reporting period.

This letter contains no new NRC commitments, nor does it modify any prior commitments. Please contact Sam Shirey at (612) 295-1449 if you require further information.

I 310, 3 ~9 Michael F. Hammer -

Site General Manager ' g \Y, 3 Monticello Nuclear Generating Plant I

~

9ib833d d5 990826 ~

PDR ADOCK 05000263

.G R__ __

PDR

[.

[ j A

. c: Regional Administrator-lit, NRC NRR Project Manager, NRC

. Sr. Resident inspector, NRC .

State of Minnesota

, Attn: Steve Minn

. J Silberg l'

4 l'

i 1

t

. 2 Attachment A Effluent and Waste Disposal Semi-Annual Report l for  !

January -June,1999 l

I (The attached Report contains 9 pages.)

I l

l 1

1 l

t