ML20204H471

From kanterella
Jump to navigation Jump to search

Forwards SER Concluding That Util Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello & Adequately Addressed Actions Requested in GL 96-05
ML20204H471
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/18/1999
From: Lyon C
NRC (Affiliation Not Assigned)
To: Richard Anderson
NORTHERN STATES POWER CO.
Shared Package
ML20204H476 List:
References
GL-96-05, GL-96-5, TAC-M97070, NUDOCS 9903290079
Download: ML20204H471 (3)


Text

m_.< . _ .. _ _ . . _ ---

7 g

f  %,i UNITED STATES

'pgg C;

s* j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066 4001 March 18, 1999 '

Mr. Roger O. Anderson, Director Nuclear Energy Engineering Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401

SUBJECT:

RESPONSE TO NRC GENERIC LETTER 96-05, " PERIODIC VERIFICATION OF DESIGN-BASIS CAPABILITY OF SAFETY-RELATED MOTOR-OPERATED VALVES," MONTICELLO NUCLEAR GENERATING PLANT (TAC NO. M97070)

Dear Mr. Anderson:

Enclosed is the staff's safety evaluation of Northern States Power Company's (NSP's) response .

to NRC Generic Letter (GL) 96-05," Periodic Verification of Design-Basis Capability of Safety- l Related Motor-Operated Valves,"- for the Monticello Nuclear Generating Plant. GL 96-05 was issued on September 18,1996, and requested each nuclear power plant licensee to establish a program, or to ensure the effectiveness of its current program, to verify on a periodic basis that safety-related motor-operated valves (MOVs) continue to be capable of performing their safety functions within the current licensing bases of the facility.

On November 15,1996, NSP submitted a 60-day response to GL 96-05 notifying the NRC that it would complete the actions requested by GL 96-05 at Monticello. On March 13,1997, NSP submitted a 180-day response to GL 96-05 providing a summary description of the MOV periodic verification program planned to be implemented at Monticello. In a submittal dated ,

March 23,1998, NSP updated its commitment to GL 96-05. On November 4,1998, NSP provided a response to a request for additional information regarding GL 96-05 forwarded by the NRC staff on September 10,1998.

The staff has reviewed NSP's submittals and applicable NRC inspection reports and finds that NSP has established an acceptable program to verify periodically the design-basis capability of the safety-related MOVs at Monticello. As discussed in the enclosed safety evaluation, the staff concludes that NSP is adequately addressing the actions requested in GL 96-05. The staff may conduct inspections at Monticello to verify the implementation of the MOV periodic t

V j)

~

9903290079 990318 PDR ADOCK 05000263 P PDR r

7

-"m r ~2 'q ywm m mmq E 3_wa' ~ ma" " )* i I

- . _-. - . - . - . . . . - . _ - . - . - . - . _ - . ~ _ . . - . _ . . - . - . . . . - . .

\ ;

l R.' O. Anderson 2 March 18, 1999 verification program is in accordance with NSP's commitments, this NRC safety evaluation, the

.NRC safety evaluation dated October 30,1997, on the Joint Owners Group Program on MOV  ;

- Periodic Verification, and the NRC safety evaluation dated February 27,1996, on the Boiling J Water Reactor Owners Group methodology for ranking MOVs by their safety significance.

l L This completes the staff's efforts on TAC No. M97070.- ,

I l

Sincerely, l

ORIGINAL SICHED BY Carl F. Lyon, Project Manager Project Directorate lll-1 Division Licensing Project Management .

Office of Nuclear Reactor Regulation  !

l

, Docket No. 50-263 ' I I

Enclosure:

As stated s cc w/ encl: See next page l

l DISTRIBUTION:

l Docket File i PUBLIC PD31 r/f J. Zwolinski/S, Black  ;

OGC l ACRS )

l T. Scarbrough i C. Lyon R. Lanksbury, Rlli l D. Terao  ;

SEDB (RCN)

DOCUMENT NAME: G:\PD3-1\WPDOCS\MONTICEL\SE97070 *NO MAJOR CHANGES TO SE  !

To receive a copy of this document,indeste in the box: *C" = Copy without attachment / enclosure "E* = Copy with attachment / enclosure *N* = No copy

  • No major chances to SE OFFICE PM:PD31 lE LA:PD31 1.E <SC:EMEB' PD:PD3 * ,

NAME FLyon:db Y CJamerson 6f DTerao CACa., .nt l DATE 3 /f7 /99 3 / n1/99 - [j 3/2/99 3/;8/S9 OFFICIAL RECORD COPY l

i l i

l.  !

~ = = = - - - - --

__=r-l i

I Mr. Roger O. Anderson, Director Monticello Nuclear Generating Plant Northern States Power Company cc:

J. E. Silberg, Esquire Kris Sanda, Commissioner Shaw, Pittman, Potts and Trowbridge Department of Public Service 2300 N Street, N. W. 121 Seventh Place East Washington DC 20037 Suite 200 St. Paul, Minnesota 55101-2145 U.S. Nuclear Regulatory Commission Resident inspector's Office Adonis A. Nebiett 2807 W. County Road 75 Assistant Attorney General Monticello, Minnesota 55362 Office of the Attomey General 445 Minnesota Street Plant Manager Suite 000 Monticello Nuclear Generating Plant St. Paul, Minnesota 55101-2127 ATTN: Site Licensing Northern States Power Company 2807 West County Road 75 Monticello, Minnesota 55362-9637 Robert Nelson, President Minnesota Environmental Control Citizens Association (MECCA) 1051 South McKnight Road St. Paul, Minnesota 55119 Cornmissioner Minnesota Pollution Control Agency l l

520 Lafayette Road St. Paul, Minnesota 55119 Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Commissioner of Health l Minnesota Department of Health 717 Delaware Street, S. E.

Minneapolis, Minnesota 55440 Darla Groshens, Auditor / Treasurer Wright County Government Center 10 NW Second Street .

Buffalo, Minnesota 55313 I s.nue , nos

.- m-, , --,-