y g @ C*:u k
UNITED STATES
-[
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. was m May 5, 1999
. Mr. Roger O. Anderson, Director Nuclear Energy Engineering q
Northern States Power Company j
414 Nicollet Mall j
Minneapolis, Minnesota 55401
SUBJECT:
COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 96-01,
" TESTING OF SAFETY-RELATED LOGIC CIRCUITS," DATED JANUARY 10, 1996; MONTICELLO NUCLEAR GENERATING PLANT (TAC NO. M94700)
Dear Mr. Anderson:
On January 10,1996, the NRC issued Generic Letter (GL) 96-01, " Testing of Safety-Related Logic Circuits," to all holders of operating licenses or construction permits. The NRC issued i
GL 96-01 for three principal reasons:
j i
1.
To notify addressees about problems with testing of safety-related logic circuits' i
l 2.
To request that all addressees implement the actions described in the GL; and l
3.
To require that all addressees submit to the NRC a written response regarding
{
implementation of the requested actions.
In GL 96-01, the staff specifically requested that licensees take the following actions:
1.
Compare electrical schematics and logic diagrams for the reactor protection system, emergency diesel generator load shedding and sequencing, and actuation logic for the engineered safety feature systems against plant sunteillance test procedures to ensure that all portions of the logic circuitry, includir' ' Qe parallel logic, interlocks, bypasses and inhibit circuits, are adequately covered in the surveillance procedures to fulfill the technical specification requirements. This review should also include relay contacts, control switches, and other relevant electrical components within these systems, utilized in the logic circuits performing a safety function; and 2.
Modify the surveillance procedures as necessary for complete testing to comply with the technical specifications. Additionally, the licensee' may request an amendment to the technical specifications if relief from certain testing requirements can be justified.
Furthermore, the NRC staff required that addressees prepare and submit the following:
1.
A written response indicating whether or not the licensee would implement the actions requested above or propose an alternative action;
- 2. ~
A schedule for completing the requested actions or proposed alternative; and
,n y' O 9905070130 990505 PDR ADOCK 05000263 P
FDR
i Mr. Roger O. Anderson g 3.
A response confirming completion of the requested actions, in response to GL 96-01, you provided letters dated April 17,1996, and April 23,1998, for Monticello. These submittals provided the information requested and the responses required by GL 96-01; therefore, TAC No. M94700 is closed.
If you have any questions regarding this matter, please call me at 301-415-2296.
Sincerely, b{
Carl F. Lyon, Project Manager, Section 1 Project Directorate Ill' Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-263 cc: See next page
)
4 Mr. Roger O. Anderson, Director Northern States Power Company Monticello Nuclear Generating Plant cc:
J. E. Silberg, Esquire Shaw, Pittman, Potts and Trowbridge Commissioner 2300 N Street, N. W.
Department of Public Service Washington DC 20037 121 Seventh Place East Suite 200 U.S. Nuclear Regulatory Commission St. Pan, Minnesota 55101-2145 Resident inspector's Office
- 2807 W. County Road 75 Adonis A. Nebiett Monticello, Minnesota 55362 Assistant Attorney General Office of the Attomey General Plant Manager 445 Minnesota Street Monticello Nuclear Generating Plant Suite 900 ATTN: Site Licensing St. Paul, Minnesota 55101-2127 Northern States Power Company 2807 West County Road 75 Site General Manager Monticello, Minnesota 55362-9637 Monticello Nuclear Generating Plant ATTN: Site Licensing Robert Nelson, President Northern States Power Company i
Minnesota Environmental Control 2807 West County Road 75
' Citizens Association (MECCA)
Monticello, Minnesota 55362-9637 1051 South McKnight Road St. Paul, Minnesota 55119 Commissioner Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, Minnesota 55119 Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Commissioner of Hedth Minnesota Departmerit of Health 717 Delaware Street, S. E.
Minneapolis, Minnesota 55440
' Douglas M. Gruber, Auditor / Treasurer Wright County Govemment Center 10 NW Second Street Buffalo, Minnesota 55313 April 1999 i
L'm.[-
r
~
f Mr. Roger O. Anderson May 5, 1999 3.
A response confirming completion of the requested actions.
-In response to GL 96-01, you provided letters dated April 17,1996, and April 23,1998, for Monticello. These submittals provided the information requested and the responses required by GL 96-01; therefore, TAC No. M94700 is closed.
l if you have any questions regarding this matter, please call me at 301-415-2296.'
. Sincerely, Original signed by:
Carl F. Lyon, Project Manager, Section 1 Project Directorate ill
- Division of Licensing Project Management Office of Nuclear Reactor Regulation l
Docket No. 50-263 l
cc: See next page l
DISTRIBUTION:
i-Docket File PUBLIC
'OGC PD# 31 Reading J. Zwolinski/ S. Black C. Thomas /G. Dick R. Norsworthy (RCN)
R. Lanksbury, Rlil F.Lyon W. Long H. Garg ACRS DOCUMENT NAME: G:\\PD3-1\\WPDOCS\\MONTICEL\\LTR94700 To recesve a copy of this gocument, indicate ln the box CaCopy w/o attachment /endoeurs E= Copy wah attachment / enclosure N = No copy
'PM:PD31 E LA:PD31 E
LPM
/E EElB (A)SC:d1 E
OFFICE FLyon THarri[N WLong ti/
HGarg /h GDick }k NAME 5/ h
/99 p5 / q fgg (f y fgg 5f F f99
! y / of f99 ats OFFICIAL RECORD COPY
Mr. Roger O. Anderson May 5, 1999 3.
A response confirming completion of the requested actions.
In response to GL 96-01, you provided letters dated April 17,1996, and April 23,1998, for Monticello. These submittals provided the information requested and the responses required by GL 96-0.; therefore, TAC No. M94700 is closed.
If you have any questions regarding this matter, please call me at 301-415-2296.
Sincerely, Original signed by:
Carl F. Lyon, Project Manager, Section 1 Project Directorate ill Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-263 cc: See next page DISTRIBUTION:
Docket File PUBLIC OGC PD# 3-1 Reading J. Zwolinski/ S. Black C. Thomas /G. Dick R. Norsworthy (RCN)
R. Lanksbury, Rlli F.Lyon W. Long H. Garg ACRS DOCUMENT NAME: G:\\PD3-1\\WPDOCS\\MONTICEL\\LTR94700 To recews a copo of th6s document, inde. ate in the bor CaCop wdo attachment / enclosure E= Copy with atte -..;/acture N = No copy OFRCE PM:PD31 E LA:PD31 E
LPM E
EElB (A)SC:$1 E
/
FLyon THarri[
WLong )T/
HGarg /h GDick k}k NME 5f h
/99 5 / q fgg (f L{
fgg 5/ f fgg y /o f fgg,
D^T=
OFFICIAL RECORD COPY