ML20209B458

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-263/OL-87-01 Administered on 870309-12
ML20209B458
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 04/23/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
Shared Package
ML20209B464 List:
References
NUDOCS 8704280447
Download: ML20209B458 (2)


Text

,

APR 2 31987 9

Docket No. 50-263 Northern States Powcr Company ATTN: Mr. C. E. Larson Vice President, Nuclear Generation 414 Nicollet Mall Minneapolis, MN 55401 Gentlemen:

SUBJECT:

EXAMINATION REPORT On March 9-12, 1987, the NRC administered examinations to employees of your company who had applied for licenses to operate yot:r Monticello Nuclear Plant.

At the conclusion of the examination, any generic findings that evolved as a result of the examinations were discussed with those members of your staff identified in the enclosed report. These findings are identified in Paragraph 3 of the report.

You are requested to provide a written response to the generic findings to our office within 60 days to facilitate their resolution being included in the next Systematic Assessment of Licensee Performance (SALP) report.

In accordance with 10 CFR 2.790 of the Conunissions regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely,

~Eiginaf Ergnedy C. W. Hed 0

Charles W. Hehl, Chief Operations Branch

Enclosures:

1.

Examination Report No. 50-263/0L-87-01 2.

Examination and Answer Key (SRO) 8704280447 870423 PDR ADOCK 05000263 PDR See Attached Distribution RI I RI RIII R I c hlw H hl, p Lank ury/jlk Bdrdick on emn p

g<

71DJ

Northern States Power Company 2

APR 2 3 HE7 Distribution cc w/ enclosures:

W. A. Shamla, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Monticello Resident Inspector, RIII Prairie Island LJohn W. Ferman, Ph.D.,

Nuclear Engineer, MPCA

.E. Earney, Plant Training Manager J. Hannon, Branch Chief, OLB R. Auluck, Project Manager, NRR T. Guilfoil, Contract Exam Supervisor, Sonalysts

~

.