ML20205N481
| ML20205N481 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 04/09/1999 |
| From: | Dave Hills NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wadley M NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20205N484 | List: |
| References | |
| 50-263-99-10, NUDOCS 9904160291 | |
| Download: ML20205N481 (2) | |
See also: IR 05000263/1999010
Text
E'-
'
,
- o.
w
.
.
s,
.c. -
'
'
,pfj -
, = , '
- v-
r
-
'
,
-
-
. .
v,
April 9,1999
'
,
..
' Mr.'M.' Wadley
'
President, Nuclear Generation
._"
- Northem States Power Company ,
-
414 Nicollet Mall-
-
Minneapolis, MN 55401
,3
.
'
SUBJECT:
MONTICELLO OPERATOR LICENSING REQUALIFICATION INSPECTION
,
REPORT 50-263/99010(DRS)
Dear Mr. Wadley:
- On March 12,1999, the NRC completed an inspection of the licensed operator rerphJscation
' training program at your Monticello Nuclear Generating Station. The enclosed report presents a
'
the results of that inspection.
' During the 1-week inspection period, your staff's implementation of the training program was
generally characterized by safety conscious operations and sound evaluation of licensed
operator performance. Also, the operating examination materials (simulator scenarios'and job -
performance measures) prepared by your training staff were satisfactory. = The inspectors -
concluded that the requalification training program was satisfactorily implemented in ;
accordance with 10 CFR Part 55 requirements,
,
tiowever, the inspectors, through observation of simulator scenario examinations and
discussions with personnel, noted difficulties in the ability of Shift Managers (SM) to
.
simultaneously implement the duties of the SM, emergency director, and shift technical advisor-
'
roles. In addition, during a plant fire casualty, the' SM would also assume the duties'of the shift
supervisor. The appropriate implementation of these duties are critical to the safe and
effective response to plant emergency conditions. We understand that your staff is evaluating .
actions to streamline the SM functions.
In accordance with 10 CFR 2.790 of the Commission's regulations,'a copy of this letter and the
- enclosed report will be p! aced in the NRC Public Document Room.
f
l
l
'
I
>.
,
I
v
_
_
.
.
.
,
- I ;,.
'
i
'
.
3
,
,
,
,
0
...m..
)
.
(;
M. Wadley
-2-
.
~ We will gladly discuss any questions you have concerning thi.s inspection.
Sincerely,
Original /s/D. H11h
David E. Hills, Cnief
Operations Branch
Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
Enclosure:
Inspection Report No. 50-263/99010(DRS)
cc w/ encl:
Plant Manager, Monticello
K. Sanda, Commissioner, Minnesota
Department of Public Service
. Distribution:
,
CAC (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/enct
J. Caldwell, Rlli w/enct
B. Clayton, Rlli w/enci
SRI Monticello w/encI
DRP w/enci
DRS w/enci
Rlli PRR w/pgel
PUBLIC IE-Gi w/enci
Docket File w/ encl
GREENS
LEO (E-Mail)
'
DOCDESK (E-Mail)
DOCUMENT NAME G DRS\\ MON 99010.wpd
5. c.w.em m. co.n.4 w :inm. w e.co m .n.m.o.,* - . r.co
.n. - v. ~ r.=em
OFFICE
Rlligjg
l& Rlli
lE Rill
lA/
Rlli
-l
NAME
Peters 8'n:sd
Lanksbury/Pf/'
Hills- pov)--
DATE
04/A/99
04/')/99
T#I
04 5 /99
^ 04/ /99
OFFICIAL RECORD COPY
>
1GneSO
,
o
f
j