ML20217M380
| ML20217M380 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 10/21/1999 |
| From: | Lanksbury R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wadley M NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20217M383 | List: |
| References | |
| 50-263-99-06, NUDOCS 9910270210 | |
| Download: ML20217M380 (2) | |
See also: IR 05000263/1999006
Text
r:
..
?
'"
Octobei 21, 1999
Mr. M. Wadley
President, Nuclear Generation
Northern States Power Company
414 Nicollet Mall
Minneapolis, MN 55401
SUBJECT:
MONTICELLO INSPECTION REPORT 50-263/99006(DRP)
Dear Mr. Wadley:
On September 23,1999, the NRC completed an inspection at the Monticello reactor facility.
The enclosed report presents the results of that inspection.
During the 6-week period covered by this inspection, the conduct of operations at the Monticello
facility was performed in a safety-conscious manner. Evolutions, such as surveillance tests and
routine plant power changes, were well controlled, deliberate, and performed in accordance
with procedures.
Based on the results of this inspection, the NRC has determined that four violations of NRC
requirements occurred These violations are being treated as Non-Cited Violations (NCVs),
. consistent with Appendix C of the Enforcement Policy. The NCVs are described in the cubject
inspection report. If you contest the violations or severity level of the NCVs, you should provide
a response within 30 days of the date of this inspection report, with the basis for your denial, to
the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC
20555-0001, with copies to the Regional Administrator, Region lil, and the Director, Office of
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
. enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
' Document Room.
Sincerely,
/s/ R. D. Lanksbury
Roger D. Lanksbury, Chief
Reactor Projects Branch 5
/
l
Docket No. 50-263
License No. DPR-22
Enclosure: Inspection Report 50-263/99006(DRP)
See Attached Distribution
DOCUMENT NAME: G:\\MONT\\ MON 99006 DRP.WPD
Tggive a copy of this document indicato in the box "C" = Copy w/o attach /enci"E" = Copy w/ attach / encl *N" = No copy
SFFICE
Rill:DRP
G
Rill:SEG
lE
Rlil:DRP
l0
l
yME
Kunowski/co #-
Cree'tNPara S1
Lanksbury @ f
DATE
101')J /99
10/ T/99
10/M /99
,
OFFICIAL RECORD COPY
9910270210 991021
,
ADOCK 05000263
G
/
i
,-
y, >
.
M. Wadley
-2-
cc w/ encl:
Site General Manager, Monticello
Plant Manager, Monticello
S. Minn, Commissioner, Minnesota
Department of Public Service
- Distribution:
CMC 1 (E-Mail)
RPC (E-Mail)
CFL (Propict Mgr.) (E-Mail)
J. Caldwell, Rill w/enci
B. Clayton, Rlli w/ encl
SRI Monticello w/enci
DRP w/enci
DRS w/enci
Rlli PRR w/enct
PUBLIC IE-01 w/encI
Docket File w/enci
GREENS
IEO (E-Mail)
DOCDESK (E-Mail) ,
i
,
1
270.049
'
,
s