Forwards Insp Rept 50-263/98-19 on 981214-18.No Violations Noted.Purpose of Insp Was to Review Plant Chemistry Program, PASS & REMP
ML20198R200
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/30/1998
From: Shear G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20198R204 List:
References
50-263-98-19, NUDOCS 9901080123
Download: ML20198R200 (2)


See also: IR 05000263/1998019

Text

- _ _ _ _ _ .

0

.

December 30, 1998

Mr. M. Wadley

President, Nuclear Generation

Northern States Power Company

414 Nicollet Mall

Minneapolis, MN 55401

SUBJECT: NRC INSPECTION REPORT 50-263/98019(DRS)

Dear Mr. Wadley:

On December 18,1998, the NRC completed an inspection at your Monticello Nuclear

Generating Plant. The purpose of the inspection was to review the plant chemistry program, l

I

the post accident sampling system (PASS) and the radiological environmental monitoring

program (REMP). The enclosed report presents the results of that inspection. No violations of

NRC requirements were identified.

Areas examined during the inspection are identified in the report. Within these areas, the

inspection consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations of activities in progress.

The inspectors found that, in general, your conduct of chemistry activities at the plant was

effective in particular, the Data Acquisition System used to monitor various chemistry

parameters throughout the facility was being utilized effectively. The plant water quality

program, the PASS and the REMP were all operated within the required parameters,

in accordance with 10 CFR 2.790 of the NRC's " Rules and Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

1

We will gladly discuss any questions you have concerning this inspection.

l

Sincerely,

Original Signed by Wayne J. Slawinski (for)

Gary L Shear, Chief

Plant Support Branch 2

Docket No.: 50-263

License No.: DPR-22

Enclosure: Inspection Report 50-263/98019(DRS)

See Attached Distribution

k

DOCUMENT NAME: G:DRS\ MON 98019.WPD

v. c.i.. . .. or u. e,n.we.e. i,, stie w c . cm moui .e-.wio.a. r . em e .itamu.mions. Y a No copy

OFFICE Rlli li Rlli l Rlli l6 Rlli E

NAME Mitchell:jp la / Glinski [/G-- Burgess m AR (n Shear tul/M

" '

s

DATE 12/)f/98 12/3f98 12/JI/98 12GI/98"

OFFICIAL RECORD COPY

-

9901090123 98123023

DR ADOCK 05

.-

i

.i

,

r.

0-

.

.

!

M. Wadley -2-

i

cc w/ encl: Plant Manager, Monticello

State Liaison Officer, State

of Minnesota

Distribution:

CAC (E-Mail) i

' RPC (E-Mail) l

~ Project Mgr., NRR w/enci

J. Caldwell, Rlll w/enci {

'

C. Pederson, Rlli w/enci .l

B. Clayton, Rill w/enci

!

SRI Monticello w/ encl 1

DRP w/enci l

TSS w/enci

DRS (2) w/enci l

Rlli PRR w/enci

PUBLICJEie$wlencl;.

' Docket File w!enci

h

GREENS l

IEO (E-Mail)

DOCDESK (E-Mail)

l

l

I

i

1

)

r

0800u4

,

l

!

l' ,

-

i