ML20211K259

From kanterella
Jump to navigation Jump to search
Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630
ML20211K259
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 08/27/1999
From: Richard Anderson
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9909070158
Download: ML20211K259 (8)


Text

I t . .

i l

l I

Northern States Power Company 414 Nicollet Mall l Minneapolis, MN 55401 Telephone (612) 330-5500 l

August 27,1999 )

10 CFR Pad 26 Section 26.71 (d)

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282 License No. OPR-40 50-306 DPR-60 Fitness For Duty Performance Data for the 6-month period Ending June 30,1999 in accordance with 10 CFR Part 26, Section 26.71 (d), please find enclosed Northem I States Power (NSP) Company's Fitness For Duty (FFD) Program Performance Data for the six (6) month period ending June 30,1999.

If you have any questio.,s concerning the Performance Data reported, please call Georg Miserendino at 612-330-5630.

t

[o r Roger O. Anderson Director

_icensing & Management issues c: Regional Administrator-Ill, NRC Monticello NRR Project Manager, NRC

/

Monticello Resident inspector, NRC s (!

Prairie Island NRR Project Manager, NRC 0\

Prairie Island Resident Inspector, NRC .sOr State of Minnesota, Attn: Steve Minn J. Silberg (

Attachments: Attachment A (1-3) Fitness For Duty Program Performance Data (Personnel Subject to 10 CFR Part 26)

Confirmed Positive Tests for Specific j (] O, <[ Attachment B Substances.

Attachment C Fitness For Duty Summary Report, including: Management Actions and Reportable Fitness For Duty Events under 10 CFR Part 26.73 9909070158 990827 PDR ADOCK 05000263 R PDR

Attachment A-1 Fitnessfor Duty Program Performance Data PersonnelSubject to 10CFR26 Northern States Power Company June 30,1999 Company Six (6) Months Ending

]

General Office Location l

Randall D. Cleveland _ (612) 337-2323 Contact Name Phone Number Cutoffs: Screen / Confirmation (ng/ml) & Alcohol (%BAC) )

X Appendix A to 10CFR26 Levels (see attachment C, page 2, item 4) i Long -Term 1 Short -Term Testing Results Licensee Employees Contractor personnel Contractor Personnel Average number with Unescorted Access 191 N/A 13 Categories Tested Positive - Tested - . Positive - Tested Positive Pre-badging 3 0 3 0 For Cause 0 0 0 0 Post Accident 0 0 0 0 Random 58 0 1 0 Follow-up 0 0 0 0 Total 61 0 4 0 1

l l

l f

. Attachment A-2 Fitnessfor Duty Program Performance Data Personnel Subject to 10CFR26 Northern States Power Company June 30,1999 l Company Six (6) Months Ending Monticello Locaten

)

Randall D. Cleveland (612) 337-2323 Contact Name Phone Number Cutoffs: Screen / Confirmation (ng/ml) & Alcohol (%BAC) 1 X Appendix A to 10CFR26 Levels (see attachment C, page 2, item 4)

Long -Term ' . Short -Term :

Testing Results ~ Licensee Employees '- Contractor personnel Contractor Personnel Average number with Unescorted Access 375 N/A 97

  1. # :. 7 # :- # .# .#-

Categories '

. Tested  : Positive- Tested - Positive Tested - Positive Pre-badging 30 0 24 0 For Cause 1 0 0 0 Post Accident 0 0 0 0 Random 109 0 24 0 Follow-up 6 0 0 0 Total 146 0 48 0

Attachment A-3 Minessfor Duty Pmgram Performance Data PersonnelSubject to 10CFR26 Northern States Power Company June 30,1999 Company Six (6) Months Ending Prairie Island  ;

Location Randall D. Cleveland (612) 337-2323 Contact Name Phone Number Cutoffs: Screen / Confirmation (ng/ml) & Alcohol (%BAC)

X Appendix A to 10CFR26 Levels (see attachment C, page 2, item 4)

Long -Term . Short -Term

Testing Resultsi .1.icensee Employees s Contractor personnel . Contractor Personnel Average number with Unescorted Access 573 N/A 232 i Categories - Tested- ~ Positive . Tested- Positive. Tested' ' Positive ' i Pre-badging 174 1 149 1 For Cause 1 0 0 0 Post Accident 0 0 0 0 Random 167 0 43 1 Follow-up 1 0 1 0 Total 343 1 193 2 4 l

Attachment B Fitnessfor Duty Program Performance Data Personnel Subject to 10CFR26 Northern States Power Company June 30,1999 Company Six (6) Months Ending General Office, Monticello, Prairie Island Location Randail D. Cleveland (612) 337-2323 Contact Name Phone Number Cutoffs: Screen / Confirmation (ng/ml) & Alcohol (%BAC)

X Appendix A to 10CFR26 Levels (see attachment C, page 2, item 4)

Breakdown of Confirmed Positive Tests For Specific Substances (By Testing Pool)

Amphe- Phency.- Refusal General Office. m quana hine - ppiates .'- temines clidine . Alcohol ~ to Test Licensee Employees 0 0 0 0 0 0 0 l Short-Term Contractors 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0l Monticello Plant '

Licensee Employees 0 0 0 0 0 0 0 Short-Term Contractors 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0l Prairie island Plant Licensee Employees 1 0 0 0 0 0 0 l

Short-Term Contractors 0 0 0 0 0 2 0 1 Total 1 0 0 0 0 2 0 3l l

l

ATTACHMENT C June 30,1999 Page 1 of 3 Fitness For Duty Summary Report Six (6) Month Period Ending June 30,1999 Management Actions

1. During the six (6) month period ending June 30,1999 Northem States Power Company conducted (795) drug and alcohol tests in accordance with 10 CFR Part 26. NSP workers subject to random drug and alcohol testing are each assigned to one of three pools: Prairie Island, Monticello, and General Office. Random test rates for each pool are as follows:

Annual Period -

POOLS- Ending 06/30/99 General Office 58 %

Monticello 56%

Prairie Island 52%

ALL 54 % l For the reporting period, three (3) workers were denied nuclear access after testing positive for drugs or alcohol. By test type: two (2) pre-access tests and one (1) rendom test were  !

positive.

Pre-Access Positives l l

One (1) contract worker tested positive for alcohol.

One (1) non-nuclear employee tested positive for marijuana.

Random Positives One (1) contract worker tested positive for alcohol.

Both individuals testing positive on the pre-access tests remain denied nuclear access.

Nuclear access for the individual with the random poaitive was reinstated following successful completion of NSP retum to duty requirements.

I ATTACHMENT C June 30,1999 Page 2 of 3 Fitness For Duty Summary Report Six (6) Month Period Ending June 30,1999

. 2. For the semi-annual period referenced herein all blind specimens submitted to NSP's HHS-certified laboratory yielded expected results.

3. NSP has analyzed program performance data for the six (6) month period ending June 30,1999 and has revised existing FFD procedures to incorporate enhancements as indicated by the analysis.
4. NSP continues to test for marijuana metabolites using an initial cutoff level of (50 ng/ml). This change was initiated on September 1,1994 and communicated to the NRC by letter dated September 22,1994.

NSP performed (795) drug tests under the lower initial cut-off level for Marijuana as referenced above. The one (1) marijuana positive during this reporting period tested postive at a level greater than 100ng/ml. Breakdown by worker type and quantification is as follows:

Marijuana Positives > 100 ng/mi, Marijuana Positives < .100 ng/mi but > 50 nghni Licensee Worker Positives 1 Licensee Worker Positives 0 Short/ Term Contract Worker Positives 0- Short/ Term Contract Worker Positives 0 i

I l

I i

1

. .t i

, (

, , ATTACHMENT C June 30,1999 Page 3 of 3 Fitness For Duty Summary Report Six (6) Month Period Ending June 30,1999 Reportable Events I

NSP had no reportable events as defined in 10 CFR Part 26.73 (a) during this reporting period.

I l

1 l

I 1