ML20150B715
| ML20150B715 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 06/23/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Antony D NORTHERN STATES POWER CO. |
| References | |
| NUDOCS 8807120140 | |
| Download: ML20150B715 (1) | |
Text
g_
"JtjN s 198:
Docket No. 50-263 Northern States. Power Company Monticello Nuclear Generating Plant ATTN: Mr. Douglas Antony.
Training Department P.-0. Box 600 Monticello, MN 55362
SUBJECT:
REQUAl.IFICATION EXAMINATIONS
Dear Mr. Antony:
Region III has completed a pilot requalification exam at the Perry facility utilizing the new requalification examination methodology.
In order to provide you with the latest, although not necessarily final, procedure and guidance.on the requalification process the following information is being provided for your information.
1.
Draft of ES601 Rev 5 "Administration of NRC Requalification Program Evaluations".
t 2.
Written Exam from Perry 3.
Selected Simulator Scenarios from Perry 4.
Selected Job Performance Measures (JPM) from Perry.-
If you have any questions on the present status of the process please contact me at (312) 790-5ti95.
Sincerely, MGINAl. SIGNED BY GE0ffREY C. WRIGHT Geoffrey C. Wright, Chief Operations Branch
Enclosures:
As stated cc w/ enclosures:
Monticello, SRI cc w/o enclosures:
l I. Jackiw, DRP 1
l l
\\
Wright /mc QY
.b
[f 8807120140 880623 PDR ADOCK 05000263 V
PDC 1