Informs That Util Reviewed Rvid as Requested in NRC .Recommended Corrections Are Listed
ML20211K797
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/01/1999
From: Day B
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-92-01, TAC-MA1199, NUDOCS 9909080071
Download: ML20211K797 (3)


Text

1 s A

  1. ff Northem States Power Company

\

Monticello Nuclear Generating Plant 2807 West Hwy 75 i Monticello, Minnesota 55362 9637 l

/

September 1,1999 Generic Letter 92-01  !

Revision 1, Supplement 1 1

I US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 l

MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Response to July 2,1999 Request to Review Monticello Data in Reactor Vessel Integrity Database (TAC No. mal 199)

In a letter dated July 2,1999, from Carl F. Lyon of the U.S. Nuclear Regulatory Commission (NRC) Staff to Roger O. Anderson of Northern States Power (NSP) Compay, NSP was requested to review data for the Monticello reactor pressure vessel that was entered in the NRC Reactor Vessel Integrity Database. This letter responds to that request.

The Reactor Vessel Intemals Data Base has been thoroughly reviewed for the Monticello specific data input to the data base. The following corrections ace recommended:

Title of display: Plate Detail Identification of data set: PlateID 234 Data entries in question: USE @ EOL (1/4T): 47.8

% Drop @ EOL (1/4T): 32.7 Recommended values: USE @ EOL (1/4T): 56.2 [

% Drop @ EOL (1/4T): 20.9 M Discussion: The % Drop @ EOL (1/4T) of 32.7 and the USE @ EOL (1/4T) of 47.8 appear to g be incorrect. We believe that the conect value for % Drop @ EOL (1/4T) should be 20.9 and 0 the correct value for USE @ EOL (1/4T) should be 56.2 ft-lbs. These are the values identified in our letter from William J. Hill to the U.S. Nuclear Regulatory Commission dated September 5,1997, " Response to Request for Additional Information (RAI) on Monticello Power Rcrate Program (TAC No. M96238)" which reflect currently accepted vessel material perfonnance criteria.

(J8()U 19 9909080071 990901 PDR ADOCK 05000263 p PDR j

A

m i

>r 3.

Title of display: Surveillance Detail Identification of data sets: Capsule ID 823, 824, 826, and 827 (Four places)

Data entry in question: References and Notes ....... Report SIR-97-003, Rev. l ....

Recommended entry: References and Notes . . . . . . .R eport SIR-97-003, Rev. 2. . . .

Discussion: Reference is made to report SIR-97-003, Rev.1. The revision for this report that was submitted to the NRC by letter dated December 21,1998 was actually Rev. 2.

Title of displays: P-T Limits Summary and Upper Shelf Energy Summary Report (Two places)

Data entry in question: Plant References and Beltline Material Notes Discussion: The last paragraph of this entry appears twice in each of these two displays.

This letter contains no new commitments nor does it modify any existing commitments. Please contact Marcus H. Voth, Monticello Project Manager of Licensing, at (612) 271-5116 if l additional information is required.

W .

Byron D. Day Plant Manager Monticello Nuclear Generating Plant c: Regional Administrator-III,NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC State of Minnesota Attn: Steve Minn J Silberg

Attachment:

Affidavit to the US Nuclear Regulatory Commission

r o  !

UNITED STATES NUCLEAR REGULATORY COMMISSION 1

NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263 Response to July 2,1999 Request to Review Monticello Data in Reactor Vessel Integrity Database (TAC No. mal 199)

Northern States Power Company, a Minnesota corporation, hereby provides inforrnation concerning NRC Generic Letter 92-01, Revision 1, Supplement 1, " Reactor Vessel Stmetural Integrity" as requested by the NRC Staffin a letter dated July 2,1999. l This letter contains no restricted or othur defense information.

NORTHERN STATES POWER COMPANY By y7ath 5yron 'd. Day (Plant Manager Q ~~ ,,

Monticello Nuclear Generating Plant On this l# day of 1&de /999 before me a notary public in and for said l County, personally appeakd Byron II. Day, Plant Manager, Monticello Nuclear Generating Plant, and being first duly sworn acknowledged that he is authorized to execute this document on {

behalf of Northem States Power Company, that he knows the contents thereof, and that to the j best of his knowledge, information, and belief the statements made in it are true and that it is not l I

interposed for delay.

/q J t t1 ft#_uA---

l /)

L4 i - - - - - - -MARCUS

- - - - - H- - - - - - - l - - . V OT H l

Marcus H. Voth { NOTARYPURIC MINNESOTAj ,

Notary Public - Minnesota 1, _ __ .. wy comm;p_p.,9p;_s3,q;

" ' ~ " " ~ ~ ~ " " ~ " ~ " " " " " ' ~

Wright County