Ack Receipt of Util Transmitting Proposed Amend to Physical Security Plan.Addl Info & Revs to Plan Required Prior to NRC Approval.Response to Encl Comments Requested within 30 Days of Ltr Receipt
ML20236P447
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/07/1987
From: Scaletti D
Office of Nuclear Reactor Regulation
To: Musolf D
NORTHERN STATES POWER CO.
References
NUDOCS 8708120370
Download: ML20236P447 (3)


Text

- - _ - _ - _ _ _ _ _ _ _ - _ - _ . _ - _ _ _ - _ _ . _ _ _ _ _ - _ - - _

e

.] D:cket No. 50-263 Mr. David Musolf, Manager Nuclear Support Services Northern States Power Company

@ yg 414 Nicollet Mall Minneapolis, Minnesota 55401

Dear Mr. Musolf:

This is to acknowledge receipt of the Northern States Power Company letter dated November 24, 1986, which transmitted a proposed amendment to the Monticello Nuclear Generating Plant Physical Security Plan in response to the Miscellaneous Amendments and Search Requirements.

The submitted document has been reviewed and we have determined that additional information and revisions to the plan are required prior to our approval. The enclosed comments are based upon pertinent NRC regu-lations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of those regulations.

It is requested that you provide your response to these comments within 30 days from receipt of this letter.

The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Should you have any questions concerning the enclosed comments, please contact the eviewer, Barry Manili, at (301) 492-7077.

Sincerely, Dino Scaletti, Project Manager

.roject Directorate III-3 Division of Reactor Projects III, IV, V

-and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION W/ ENCLOSURES:

Physical Security Plan Comments RSGB rf Sec rf BManili CBuracker (2)  ;

cc w/ enclosure: Region III PKreutzer '

See next page DScaletti Docket File 50-263 Case File NRC PDR RErickson w/o enc 1 Local POR LBush w/o enci

  • See Previous Concurrence 1 0FC :RSGB *  : RSGB ^ :RSGB ^ :RSGB * :PD III-3 :PD l-  : l NAME$BManili/bc $CBuracker $LBush $RErickson $PK zer $DScaletti DATE :7/22/87 :7/22/87 :7/22/87 :7/22/87  :$/7 /87 :h/87  :

nrcICIAL RECORD COPY 8700120370 870807 PDR ADOCK 05000263 p PDR

e 1 Mr. D. M. Musolf '

Northern States Power Company Monticello Nuclear Generating Plant cc:

Gerald Charnoff, Esquire Commissioner of Health Shaw, Pittman, Potts and Minnesota Department of Health Trowbridge 717 Delaware Street, S. E.

2300 N Street, NW Minneapolis, Minnesota 55440 Washington, D. C. 20037

0. J. Arlien, Auditor U. S. Nuclear Regulatory Comission Wright County Board of Resident Inspector's Office Commissioners Box 1200 10 NW Second Street Monticello, Minnesota 55362 Buffalo, Minnesota 55313 Plant Manager Monticello Nuclear Generating Plant Northern States Power Company Monticello, Minnesota 55362 Russell J. Hatling Minnesota Environmental Control Citizens Association (MECCA) .

Energy Task Force 144 Melbourne Avenue, S. E.

Minneapolis, Minnesota 55113 l Dr. John W. Ferman Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, Minnesota 55155-3898 Regional Administrator, Region III

- U. S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn, Illinois 60137

o 1

l Docket No. 50-263 COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS) i MONTICELLO NUCLEAR GENERATING PLANT Provide a commitment that if security force members leave the protected area to perform official duties subsequent to their initial entry and search, they will be searched prior to re-entry into the protected area if they have not been under direct observation or accompanied by another member of the security force. Reference 10 CFR 73.55(d)(1) and Generic Letter 87-08 (Q&A #11).

Provide a commitment that in the case of an individual's involuntary termination for cause, the individual's unescorted facility access will be revoked, and identification badge and other entry devices shall be retrieved prior to or simultaneously upon notification of termination.

Reference 10 CFR 73.55(d)(7)(1)(C).

Provide a commitment to ensure prompt access to vital equipment to accom-modate the potential need for rapid ingress or~ egress of individuals during emergency conditions or situations. Indicate how this prompt access will be ensured (e.g. , by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable means.) Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).

Provide a commitment to periodically (annually) review physical security and contingency p'sans and procedures to evaluate their potential impact on plant and personnel safety. Reference 10 CFR 73.55(d)(7)(ii)(B) and Regulatory Guide 5.65.

Indicate what components of the secondary power supply system will be pro-tected as vital. Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #18).

Provide a commitment to maintain a log indicating name, badge number, time of entry, and time of exit of all individuals granted access to a vital area except those individuals entering or exiting the reactor control room.

Delete the CAS from the list of areas not requiring log entries. Reference 10 CFR 73.70(d).